Elementary HEC-HMS Model

Slides:



Advertisements
Similar presentations
Hydrologic Modeling with HEC-HMS
Advertisements

Module 5: Storage Concepts Theodore G. Cleveland, Ph.D., P.E, M. ASCE, F. EWRI October 2013.
DES 606 : Watershed Modeling with HEC-HMS Module 12 Theodore G. Cleveland, Ph.D., P.E 29 July 2011.
HEC-HMS Simulation 3 Different Loss Models
HEC-HMS Simulation Multiple Sub-Basins
Reading: Applied Hydrology Sec 14.1 – 14.4
Continuous Hydrologic Simulation of Johnson Creek Basin and Assuming Watershed Stationarity Rick Shimota, P.E. Hans Hadley, P.E., P.G. The Oregon Water.
DES 606 : Watershed Modeling with HEC-HMS
CURVE NO. DEVELOPMENT STEP 8 Soils data, land use data, watershed data, and CN lookup table are used to develop curve numbers for use in the SCS Curve.
PrePro2004: Comparison with Standard Hydrologic Modeling Procedures Rebecca Riggs April 29, 2005.
Hydrologic Design and Design Storms
Design Storms in HEC-HMS
WinTR-20 Project Formulation Hydrology Computer Program Basic Input and Output Presented by: WinTR-20 Development Team.
WinTR-20 Project Formulation Hydrology Computer Program Basic Input and Output Presented by: WinTR-20 Development Team.
Basic Hydrology & Hydraulics: DES 601
Simulating the Hydrologic Response
Summary of Topics - HEC-HMS
1 Import NRCC Data February 2015 Obtaining NRCC Rainfall Data and Importing it into WinTR-20.
Introduction to HEC-HMS
DES 606 : Watershed Modeling with HEC-HMS Module 5 Theodore G. Cleveland, Ph.D., P.E 29 July 2011.
Module 6: Routing Concepts Theodore G. Cleveland, Ph.D., P.E, M. ASCE, F. EWRI October 2013 Module 6 1.
HEC-HMS Simulation Adding a detention pond at the outlet
Watershed Modeling using HEC-HMS and EPA-SWMM
HEC-HMS Runoff Computation.
TXHYETO.XLS: A Tool To Facilitate Use of Texas-Specific Hyetographs for Design Storm Modeling Caroline M. Neale Texas Tech University.
Hydrologic Design Storms
Project Regional Characteristics of Unit Hydrographs David Thompson, Texas Tech, RS Rudy Herrmann, TxDOT, PD William Asquith, USGS, Co-PI Xing Fang,
Watershed Modeling using HEC-HMS and EPA-SWMM ©T. G. Cleveland, Ph.D., P.E. 10 July 2012 Lesson 2.
DES 606 : Watershed Modeling with HEC-HMS Module 4 Theodore G. Cleveland, Ph.D., P.E 29 June 2011.
Watershed Modeling using HEC-HMS and EPA-SWMM ©T. G. Cleveland, Ph.D., P.E. 10 July 2012 Lesson 1.
DES 606 : Watershed Modeling with HEC-HMS Module 8 Theodore G. Cleveland, Ph.D., P.E 29 July 2011.
CE 3372 Water Systems Design SWMM Hydrology. SWMM as Hydrologic Model Sub-catchments – Infiltration model (runoff generation) Raingages – Time-series.
Watershed Modeling using HEC-HMS and EPA-SWMM ©T. G. Cleveland, Ph.D., P.E. 16 July 2012 Lesson 5.
1 Import NOAA Atlas Data March 2009 Obtaining NOAA Atlas 14 Rainfall Data and Importing it into WinTR-20.
DES 606 : Watershed Modeling with HEC-HMS
DES 606 : Watershed Modeling with HEC-HMS
CE 3354 Engineering Hydrology Lecture 9: Rational Equation Method Introduction to HEC-HMS.
1 Import NOAA Atlas 14 Data June 2015 Obtaining NOAA Atlas 14 Rainfall Data and Importing it into WinTR-20 Presented by: WinTR-20 Development Team.
CE 3354 Engineering Hydrology
CE 3354 Engineering Hydrology
Basic Hydrology: Rainfall-Runoff – I
Module 3: HEC-HMS Elementary Model Theodore G. Cleveland, Ph.D., P.E, M. ASCE, F. EWRI August 2015 Module 3 1.
Project Regional Characteristics of Unit Hydrographs
1 januari 2008 RIBASIM input data by Wil N.M. van der Krogt.
HEC-HMS Simulation Developing a Unit Hydrograph
DES 606 Watershed Modeling with HEC- HMS Advanced Topics.
DES 606: Watershed Modeling with HEC-HMS Watershed Subdivision Theodore G. Cleveland, Ph.D., P.E. 6 OCT 11.
Multiple Rain Gages and Weighting in HEC-HMS
Module 10: Average Rainfall Theodore G. Cleveland, Ph.D., P.E, M. ASCE, F. EWRI August 2015 Module 10 1.
Module 11: Average Rainfall Theodore G. Cleveland, Ph.D., P.E, M. ASCE, F. EWRI August 2015 Module 11 1.
Module 4: Loss Models Theodore G. Cleveland, Ph.D., P.E, M. ASCE, F. EWRI AUG 2015 Module 4 1.
DES 606: Watershed Modeling with HEC-HMS Historical Rainfall Theodore G. Cleveland, Ph.D., P.E. 6 OCT 11.
Basic Hydrology & Hydraulics: DES 601
Module 7: Unit Hydrograph Concepts Theodore G. Cleveland, Ph.D., P.E, M. ASCE, F. EWRI August 2015 Module 7 1.
BUILDING AND RUNNING THE HYDROLOGICAL MODEL
HYDROLOGY Lecture 10 Unit Hydrograph
DES 606 : Watershed Modeling with HEC-HMS
HEC-HMS Simulation Adding a detention pond at the outlet
Modified Rational Method for Texas Watersheds
DES 606 : Watershed Modeling with HEC-HMS
Basic Hydrology: Rainfall-runoff based methods – II
CE 3354 Engineering Hydrology
CE 3372 Water Systems Design
Hydrologic Simulation Models
Hydrologic River Routing
Hydrologic Simulation Models
DES 606: Watershed Modeling with HEC-HMS
SCS Dimensionless Unit Hydrograph
SCS Dimensionless Unit Hydrograph
Presentation transcript:

Elementary HEC-HMS Model Example 6A Elementary HEC-HMS Model

Purpose Illustrate the steps to create a functioning precipitation-runoff model in HEC-HMS. The example is “elementary” in the sense that only a small set of HEC-HMS capabilities are employed Realistic parameter values are employed from public-domain references, but the example is fabricated for pedagogical simplicity.

Learning Objectives Familiarize students with the HEC-HMS Graphical User Interface. Reinforce the concepts of “Projects” as a data-storage paradigm. Simulate the rainfall-runoff response of a single sub-basin Texas watershed using: Initial loss and constant rate loss model SCS Unit Hydrograph transformation model User-specified hyetograph.

Problem Statement Simulate the response of the Ash Creek watershed at Highland Road for a 5-year, 3-hour storm, under current development conditions. Treat the entire watershed as a single sub-basin.

Problem Statement Watershed Outlet Highland Road and Ash Creek, Dallas, TX. Area is residential subdivisions, light industrial parks, and some open parkland. White Rock Lake is water body to the North-West

Precipitation Estimation Estimate 5-year, 3-hour storm depth using the DDF Atlas

Precipitation Estimation Approximate the storm temporal distribution using dimensionless hyetograph.

Loss Model Estimation Runoff Generation (Loss) Estimate the initial abstraction and constant rate loss using TxDOT 0-4193-7

Transformation Model Estimation Unit Hydrograph Timing Parameters Example will use the SCS DUH, but will parameterize assuming GUHAS regression is appropriate.

Physical Properties Watershed Properties AREA=6.92 mi2 MCL=5.416 mi MCS=0.005595 CN=86 R=0

Building The Model – Data Preparation HEC-HMS will require us to construct, external to HMS the following: A Hyetograph (rainfall) Loss model parameters Transform model parameters In this example will use Excel to build some input data required by the program.

Rainfall Depth Use the DDF atlas to find the 5-year, 3-hour storm depth for Dallas Texas. About 2.8 in.

Generate a Hyetograph Dimensionless Hyetograph is parameterized to generate an input hyetograph that is 3 hours long and produces the 5-year depth. We won’t actually use the graph, instead use the tabular values in the report. For this example, will use the median (50th percentile) curve 0 – 2.8 inches 0 – 3 hours

We won’t actually use the graph, instead use the tabular values in the report. This column scales TIME This column scales DEPTH

Dimensional Hyetograph

Dimensional Hyetograph Use interpolation to generate uniformly spaced cumulative depths. HEC-HMS can handle irregular interval data, but requires use of DSSVue. Reasonable alternative is interpolation. This example will interpolate external to HEC-HMS, then import the results.

Input Hyetograph We will use this column in HEC-HMS and specify a 5-minute rainfall time-series.

Data Preparation HEC-HMS will require us to construct, external to HMS the following: A Hyetograph (rainfall) Loss model parameters Transform model parameters In this example will use Excel to build some input data required by the program.

Loss Model Parameters IaCl model in TxDOT 0-4193-7

Loss Model Parameters IaCl model in TxDOT 0-4193-7

Loss Model Parameters IaCl model in TxDOT 0-4193-7

Loss Model Parameters IaCl model in TxDOT 0-4193-7

Data Preparation HEC-HMS will require us to construct, external to HMS the following: A Hyetograph (rainfall) Loss model parameters Transform model parameters In this example will use Excel to build some input data required by the program.

Unit Hydrograph Model SCS Dimensionless Unit Hydrograph Related to a gamma distribution with shape K=3.77 HEC-HMS requires a time constant, Tp For this example, will assume 0-4193-4 method is sufficient

Unit Hydrograph Model Estimate Tp

Unit Hydrograph Model Estimate K

Unit Hydrograph Model Estimate K

Unit Hydrograph Model SCS Dimensionless Unit Hydrograph Related to a gamma distribution with shape K=3.77 For this example Assume that K=3.2 is close enough in shape to K=3.77 to use without modification. A later example will illustrate how to employ a user-specified hydrograph.

Data Preparation HEC-HMS will require us to construct, external to HMS the following: A Hyetograph (rainfall) Loss model parameters Transform model parameters Now ready to build the HEC-HMS model.

HEC-HMS Start the program Create a project Project is a directory where all data are stored for a particular model. Can share files between projects, but an advanced technique.

HEC-HMS Start the program Choose “File” and “New” to create a new project

Create Project Name the Project Description (optional) Select Default Units (Metric or U.S. Customary)

Create Project Name of the Project Note that project was created. This area is where notes, warnings, and error messages are presented to analyst.

Create Basin Model Choose “components” and will begin our modeling

Create Basin Model Choose “Basin Model Manager”

Create Basin Model Choose “New” Name the Basin Description

Create Basin Model 2) “Sub Basin Creation Tool” Select, then put a sub-basin into the hydrologic elements area 1) Select the Basin Name in the Component Manager Window Basin Hydrologic Elements (Starts Empty – we will populate)

Create Basin Model Sub-basin name Description (optional)

Basin Model Data Input 1) Select “cursor” tool 2) Select the sub-basin 3) Input hydrological and physical parameters When you change from defaults, program will Ask you “are you sure?” For the example, answer yes and proceed. 4) When done, select the “Loss” tab.

Basin Model Data Input 1) Input hydrological and physical parameters Use values from 0-4193-7 Use 0% IC; 0-4193-7 accounted for IC 2) When complete, select “Transform” tab.

Basin Model Data Input 1) Input hydrological and physical parameters Use values from 0-4193-3 Use the standard SCS-DUH. 2) When complete, select “Components” menu item

Create Rainfall Input Choose “Time-series” Data Manager Will supply the hyetograph input as a time-series. a) Create a raingage b) Assign a time-series to the gage c) Specify type (cumulative inches) d) Select a time interval e) Check the input

Create Rainfall Input Data Type == Precipitation Gages a) Select “New … “ b) Name the gage c) Description (optional) d) Select “Create”

Create Rainfall Input Select “Time Series/Precipitation Gages/Gage Name” Data entry here: Units == Cumulative Inches Time Interval == 5 minutes (this example)

Create Rainfall Input Select “Time Window” We will make a 3:15 -hour long input sequence.

Create Rainfall Input Select “Table” – we will cut-and-paste the time series from Excel

Create Rainfall Input Select “Table” – we will cut-and-paste the time series from Excel -- Cut and paste 00:05 to 03:10 from the spreadsheet. -- The first value at 00:00 is hand-entered as 0.00 -- The last value at 03:15 is hand entered as 3.00

Create Rainfall Input Select “Table” – we will cut-and-paste the time series from Excel -- Cut and paste 00:05 to 03:00 from the spreadsheet. -- The first value at 00:00 is hand-entered as 0.00

Create Rainfall Input Total depth == 2.8 inches Verify that plot looks like the dimensionless hyetograph Graphs should have similar shape Duration == 3.0 hours

Create Meterological Model Select meterological model manager The meterological model manager links the raingage to the basin.

Create Meterological Model Select “New …” Name the model Description (optional) Select “Create”

Create Meterological Model Select “MetModel1 Verify “Specified Hyetograph” Select “Basins” a) Basins we will link the subbasin to the time series

Create Meterological Model Select “Yes” in Include Subbasin Select “Specified Hyetograph”

Create Meterological Model Select “OneAndOnlyGage” This action links the gage name, Time-series, and the basin models.

Create Control Specifications Close to a working model! Select “Control Specifications”

Create Control Specifications “New …” Name and Description “Create”

Create Control Specifications Provide simulation start and end dates/time Should cover the rainfall input time, but can be longer Time step should be appropriate.

Create Simulation Create simulation run

Create Simulation Name the run (default is Run #) Choose next

Create Simulation Verify model selections Choose next

Create Simulation Verify model selections Choose next

Create Simulation Verify model selections Choose Finish

Run Simulation Run simulation from the compute menu item, or The “flaming water drop” icon.

Run Simulation Successful run:

Run Simulation Right-Click on the sub-basin to obtain “results” For this example choose : View results/Graph

View Results Hyetograph(Blue) Loss (Red) Hydrograph (Blue) Total Precip should agree Summary Table (Separate Window Query)

HEC-HMS Example Learning Points Have some effort external to the software Need to a-priori specify precipitation, unit hydrograph, loss Need 4 components for a functioning model Basin Time-Series Meteorological Model Control Specifications

HEC-HMS Example Learn more Remarks HEC HMS quick start guide (similar problem, more sub-basins) Remarks Too large to model in SWMM as a single catchment. (Can make it work, but hard to justify) More typical is to subdivide the watershed into parts and link with conduits; need some insight into flow patterns, etc.