Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) 18-20 Dec.

Slides:



Advertisements
Similar presentations
S. N. HOM Impedance in Vacuum … 1 of 40 Sasha Novokhatski SLAC, Stanford University Machine-Detector Interface Joint Session April 22, 2005 HOM Impedance.
Advertisements

KEK Update on the status of the electron cloud studies at KEKB Contents Brief review of our studies Updates Clearing electrode Groove structure SEY measurement.
2006/9/25-26 ILCDR06, Cornell University 1 DESIGN STUDY OF A MOVABLE COLLIMATOR WITH LOW BEAM IMPEDANCE Yusuke Suetsugu*, Kyo Shibata KEKB Vac. Group Introduction.
Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
Study of a Clearing Electrode at KEKB - First beam test - Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2008/3/3-61TLC08 Sendai.
R&D Plan on Clearing Electrode using the KEKB LER Y. Suetsugu and H. Fukuma, KEKB M. Pivi and L. Wang, SLAC at KEK.
KEK Recent results of beam tests on clearing electrode and grooves 2010/1/191ILC DR WebEx Meeting Y. Suetsugu, KEK.
Review of Electron Cloud R&D at KEKB 1.Diagnostics 1.Beam Size Blow-up 2.Beam Instabilities 3.Electron Density 4.SEY (Secondary Electron Yield) 2.Mitigation.
2006/09/25-28 ILCDR06, Cornell University 1 Experimental Study on Suppression of Electron Cloud Effect at the KEKB Positron Ring Contents Introduction.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
Chapter 2: Overall Heat Transfer Coefficient
STEADY HEAT TRANSFER AND THERMAL RESISTANCE NETWORKS
26-28 August 2008 Final EUROTeV Scientific Workshop, Uppsala University, Sweden 1 ILC DR vacuum system related problems and solutions Oleg B. Malyshev.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
DR Vacuum Component Overview April 25, 2012 Joe Conway.
Electron Clouds at SLAC Johnny Ng ILC Damping Rings Collaboration Meeting March 4, 2009.
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Electrostatic Septum For AGS C. Pai Brookhaven National Laboratory Collider-Accelerator Department
Webex Electron Cloud Evaluations for ILC DR Mauro Pivi on behalf of the ILC Electron Cloud Working Group - by Webex - KILC12 – Daegu Korea April 25, 2012.
Updates of Electron Cloud Studies at KEKB Topics in 2008 Measurement of electron density in solenoid and Q field Mitigation using clearing electrode in.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
ILC damping ring Workshop, Dec 19, 2007, KEK, L. WANG Ecloud simulation 2007 ILC Damping Rings Mini-Workshop December, 2007 Lanfa Wang, SLAC.
FAST KICKER STATUS Fabio Marcellini On behalf of LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
ILC08 Chicago November 2008 Summary of Recent Results from SLAC M. Pivi, J. Ng, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, F. Cooper,
26-October-2006 PEP-II MAC Session HOM measurement and analysis S. Weathersby, A. Novokhatski HOMs in LER region 4: overview, history Collimator wake fields.
Electron cloud in the wigglers of ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University.
Beam Induced Pressure Rise in Ring, Dec. 9-12, Beam Induced Pressure Rise in Ring ~ Experiences in KEK B-Factory ~ 1. Introduction :KEK.
2009/1/16-18 ILD09 Seoul 1 Notes for ILD Beam Pipe (Technical Aspect) Y. Suetsugu, KEK Parasitic loss Vacuum pressure profile Some comments for beam pipe.
October 13,2010 WG Meeting Cornell U. Recommendation for Electron Cloud Mitigations in the ILC Damping Ring ILC DR Working Group October 13, 2010 Cornell.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
Recent Electron-Cloud Mitigation Studies at KEK E-cloud mitigation mini-workshop on November at CERN Kyo Shibata (for KEKB Group)
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill.
CesrTA Vacuum System Conversion and Operational Experiences Yulin Li for the CesrTA Team Cornell Laboratory for Accelerator-based ScienceS and Education.
Electron cloud in Final Doublet IRENG07) ILC Interaction Region Engineering Design Workshop (IRENG07) September 17-21, 2007, SLAC Lanfa Wang.
ILC GDE - ILCDR08 Cornell 8-11 July 2008 Electron Cloud Mitigation R&D at SLAC M. Pivi, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, J. Seeman,
Electron cloud measurement in Cu/Al chambers with/without TiN coating at KEKB positron ring ILC DR Working Group Meeting Kyo Shibata (KEK)
Electron Cloud R&D at SLAC Johnny Ng SLAC DOE HEP Review July 7 – 9, 2008.
Electron Cloud Issues for the 3.2km Positron Damping Ring Mark Palmer (Cornell University) GDE January 18, 2011 ILC Baseline Assessment Workshop 2 SLAC.
UPDATE ON KICKERS LNF David Alesini for the LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Updates of EC Studies at KEKB 1.EC studies at KEKB 2.Recent results 1.Clearing Electrode 2.Groove surface 3.TiN coating 4.Measurement of EC in solenoid.
Exercises for Q1. Insulated copper tube A thin walled 10 mm copper tube is used to transport a low-temperature refrigerant with a temperature that is.
Measurement of the Electron Cloud Density in a Solenoid Field and a Quadrupole Field K. Kanazawa and H. Fukuma KEK June 2009 CTA09 1.
Recent ECLOUD07 Workshop in Daegu, S. Korea (~50 participants) –Highlights: Measurements of the surface Secondary Electron Yield (SEY) of samples inserted.
ECLOUD’12 (the 5 th electron-cloud workshop) Kyo Shibata (on behalf of KEKB Vacuum Group) SuperKEKB Vacuum System KEK Tsukuba site SuperKEKB Linac.
Electron Cloud Studies at DAFNE Theo Demma INFN-LNF Frascati.
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
Electron Cloud in the International Linear Collider ILC Mauro Pivi work performed while at SLAC and the ILC Damping Ring Working Group High.
2007/03/1-2 ECL2, CERN 1 SEY and Clearing Studies at KEKB Contents Contents Introduction Studies Beam duct with Ante-chambers Coatings with Low SEY Clearing.
704 MHz cavity design based on 704MHZ_v7.stp C. Pai
Coupled bunch Instabilities at ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University Refer to.
2007/09/17 SLAC IRENG07 1 Comment on IR Vacuum system Y. Suetsugu Pumping System without in-situ baking at z < L*
Recent Studies on Electron Cloud at KEKB 1.EC studies at KEKB 2.Recent results –Clearing Electrode –Groove surface –EC measurement in Q and solenoid field.
International Linear Collider R&D on electron cloud (SLAC)
Groove Mitigation and Plans
Electron Cloud Effects in SuperB
Measurement of Electron Cloud in KEKB LER with RFA
First Results on Electron Cloud Generation and Trapping in a PSR Quadrupole Magnet R. J. Macek, A. A. Browman & L. J. Rybarcyk, 9/26/06 Acknowledgements:
Lithium lens and window tests
Electron Clouds at SLAC
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008)
Presentation transcript:

Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.

Background A possible solution to suppress electron cloud in magnets. –Drift space :Beam duct with antechamber (photoelectrons) + TiN coating (Secondary electrons) + Solenoid will be OK. Experimental study on a clearing electrode using KEKB positron ring is planed, as a chain of ILC DR R&D study. Goal –Establish the technique of clearing electrode for ECI, which is available for high current machine and with a low beam impedance. –Demonstrate the effect on electron cloud formation. 2007/12/192 ILC DR Mini Work Shop (KEK) Dec.

Clearing Electrode Simulation (by L. Wang) Gate Valveate Valve 2007/12/193 ILC DR Mini Work Shop (KEK) Dec. R-pipe=38mm bunch intensity=9.36e Bunch Spacing B = 0.75 T  max = 1.4 Electron density in magnetic field Electrode (+) L. Wang et al, EPAC2006, p.1489

Test plan Install a test chamber with an electron monitor and a clearing electrode into a wiggler magnet of LER (Oho straight section). –At the most upstream side of wigglers Very weak SR –Magnetic field: 0.75 T –Effective length: 346 mm –Aperture (height): 110 mm Test chamber with antechambers Beam Gate Valve Wiggler magnets 2007/12/194 ILC DR Mini Work Shop (KEK) Dec.

Test Chamber Over all design of the test chamber 5 Electron Monitor Block Electrode Block Detachable Block Feed-through Magnet Top view Side view 2007/12/195 ILC DR Mini Work Shop (KEK) Dec.

Monitor and electrode Cross Section (concept) Electrode [W] (~ +1 kV) Collector (7 strips, w 5 mm) Cooling channel Insulator [Al 2 O 3 ] ( t ~0.2 mm) Grid (~ 1 kV) Vacuum seal by metal O-ring Cooling Water paths Shield Monitor Block Electrode Block  2 mm holes R47 Limited by magnet aperture ( w 40, l 440, t ~0.1) Beam 2007/12/196 ILC DR Mini Work Shop (KEK) Dec.

Feed through Copper bridge to connect feed-through and electrode was manufactured. Metal screw Ceramics screw Electrode Metalized head Non-magnetism feed through Copper M4 N-type connector 2007/12/197 ILC DR Mini Work Shop (KEK) Dec.

Features of the test chamber Strip type electrode. Monitor and electrode are exchangeable. Electron collectors are seven strips to measure the spacial distribution. Very thin electrode and insulator. –Electrode: ~0.1 mm, Tungsten, by thermal spray. –Insulator: ~0.2 mm, Al 2 O 3, by thermal spray.  Small beam impedance. Water cooling just behind of the electrode. –Absorb dissipated power in the electrode and the insulator. 2007/12/198 ILC DR Mini Work Shop (KEK) Dec.

RF calculation Model (By Mafia) Length = 2 m 1/4 model Electrode position = mm (430mm) Width = 40 mm Mesh sizes = 0.5 x 0.1 x 0.4 mm Bunch length = 6-8 mm Electrode thickness = 0.2 mm Alumina thickness = 0.2 mm Alumina  r =9.9 Port = 14 mm (o), 6 mm (i) (50  ) Embedded + Taper + Feed through Pipe (1/4) Electrode Feed through 2007/12/199 ILC DR Mini Work Shop (KEK) Dec. Taper

RF calculation Impedance(z // )  z = 20 mm (to calculate wakes for long distance) 0.5 mm electrode 1.0 mm Al 2 O mm electrode 0.2 mm Al 2 O 3 Z // reduced to ~1/5 2007/12/1910 ILC DR Mini Work Shop (KEK) Dec.

RF calculation Loss factor –k = 7×10 9 V/C, and Input power is ~ 150 W for 2 electrodes. (1.7 b) –Most of input power into electrode will be dissipated by electrode and chamber. Loss factor [V/C] Thickness of insulator and electrode [mm] 2007/12/1911 ILC DR Mini Work Shop (KEK) Dec.

RF calculation Longitudinal impedance –Length is 440 mm to avoid resonance with RF frequency. –a few  2007/12/1912 ILC DR Mini Work Shop (KEK) Dec. Frequency [Hz] Z // [  ] 500 MHz

RF calculation Voltage at feed through by MAFIA at 1.7 A (1389 bunches), Output voltage is V O ~ 600 V (If no resonance) Output power from feed-through P O ~ 60 W, if R=50  and no loss Voltage between electrode and chamber is V ~ 12 V (If no resonance)  z = 6 mm Voltage at the end of 1C 2007/12/1913 ILC DR Mini Work Shop (KEK) Dec.

Thermal calculation Assumption –Power loss in the electrode (insulator): 100 W for 1.7 A, 1389 bunches –Power loss on the electrode (copper): 10 W for 1.7 A, 1389 bunches From a formula  (3/4) = I b = Bunch current [A] C = Circumference =3016 m Z 0 = 377   z = bunch length = 6 mm  c = Conductivity= 1.8  /  m (W)  = 1 a = radius = now 38 mm For 1.7 A 1389 bunches, P = P’  1389  0.4 [m]  0.5(one side) = 7.13 ~ 7 W 2007/12/1914 ILC DR Mini Work Shop (KEK) Dec.

Thermal calculation Result 0.5 mm electrode 1.0 mm Al 2 O 3 MaterialThermal Conductivity [W/mm/K] SUS0.017 Al 2 O Heat transfer coefficient between chamber and water = 0.01 W/mm 2 /K Temperature of water = 25 degrees. 2007/12/1915 ILC DR Mini Work Shop (KEK) Dec  C

Test schedule First step (from February, 2008) –Install outside of magnet (upstream side) –Check the heating of electrode –If possible, with electron monitor and Measurement without magnet. Second step –Install into the wiggler magnet with electron monitor Third step –Groove surface, Rough surface, and other promising methods. Beam First stepSecond step 2007/12/1916 ILC DR Mini Work Shop (KEK) Dec.

Manufacturing Machining and assembling are undergoing. Monitor part Output feed-through 2007/12/1917 ILC DR Mini Work Shop (KEK) Dec. Collector (strips)

Manufacturing Machining and assembling are undergoing. FlangeChamber 2007/12/1918 ILC DR Mini Work Shop (KEK) Dec. Hot spray of Al 2 O 3 and W: Next week

Manufacturing Hot spray of Al 2 O 3 and insulation test (1kV) 2007/12/1919 ILC DR Mini Work Shop (KEK) Dec.

Manufacturing Hot spray of tungsten (electrode) 2007/12/1920 ILC DR Mini Work Shop (KEK) Dec. For feed-through

Power Supply Power supply for electrode (Fukuma-san) 2007/12/1921 ILC DR Mini Work Shop (KEK) Dec. Electrode Resistance 1.5 kV, 30 mA Outside Inside (Equivalent in AC)Input impedance

Summary Clearing electrode has been studied for a cure of EC in magnets. Manufacturing of test chamber is undergoing. Thin electrode and insulator contribute to decrease the impedance. Input power into the electrode can be treated by water cooling. Beam test will start from next February beginning with checking of heating. 2007/12/1922 ILC DR Mini Work Shop (KEK) Dec.

References 2007/12/1923 ILC DR Mini Work Shop (KEK) Dec.

Materials Properties CuWStainless Steel (SUS304) Al 2 O 3 (96%) Electric Conductivity [1/W/m] 5.8x x x Thermal conductivity [W/m/K] Linear expansion coefficient [1/K] 1.7x x x x10 -6 Relative dielectric constant /12/1924 ILC DR Mini Work Shop (KEK) Dec.

Structure Overall 2007/12/1925 ILC DR Mini Work Shop (KEK) Dec.

Structure Chamber (aluminum alloy) 2007/12/1926 ILC DR Mini Work Shop (KEK) Dec.

Structure Monitor block (stainless steel) 2007/12/1927 ILC DR Mini Work Shop (KEK) Dec.

Structure Electrode block (stainless steel) 2007/12/1928 ILC DR Mini Work Shop (KEK) Dec.