DRM 2 What to do?. A: Remind you of the charge Develop a final DRM for WFIRST that does not duplicate the capabilities of Euclid and LSST. Assess options.

Slides:



Advertisements
Similar presentations
One outcome of the workshop: A strong and compelling vision for ABS in Africa for holders of traditional knowledge and stakeholders of genetic resources.
Advertisements

DRM 2 – what I heard Fit in a Falcon 9 3 year prime science phase includes a microlensing survey, supernova survey, galactic plane survey and GO program.
1. Tuesday: Halloween Shoot due TOMORROW. You must make a contact sheet of your photos and print it from my computer tomorrow. -5 pts for every day I don’t.
When we are very young, choosing clothes for us is easy because we don’t offer an argument for the clothes that our parents dress us. However when.
Nursing Home Survey on Patient Safety Culture
Cause and Effect. A. The mother’s feeling about the trip slowed them down. B. The old car was too slow. C. They had to turn back for something. 1. What.
Q Q P a Two equal positive charges Q are located at the base of an equilateral triangle with sides of length a. What is the potential at point P (see diagram)?
Preliminary management plan for PACE SDT What are the Goals of PACE? The goals of the PACE mission are: 1-Extend key climate data records on ocean color.
CMB Decadal Study: What We Did Activities funded by NASA proposal: PI Steve Meyer + entire CMB community Workshops: The Path to CMBPOL: Upcoming Measurement.
The Path to NGAO Core Science Requirements Claire Max and Liz McGrath NGAO Team Meeting September 11-12, 2008.
Propulsion Engineering Research Center NASA Technology Roadmap: Launch Propulsion Systems Robert J. Santoro The Propulsion Engineering Research Center.
Result from Parents survey May Responses 131 families gave their opinions - 74% Scale Answers on a scale ranging from strongly disagree (1) to strongly.
Key Stage 1 Standard Assessment Tasks Key Stage 1 Standard Assessment Tasks.
Quotes from NWNH 2/3/ Two complementary approaches to understanding dark energy have been considered by this survey: one on the ground and the.
AAAC Meeting February, New GSMT Role NSF has asked that AURA/NOAO act as NSF’s "Program Manager" for the GSMT Technology development effort at a.
Galactic Bulge Time On Target May These charts examine the compatibility of a 500 day microlensing program with a 6 month SNe observing program.
Activities of and Prospective Issues before the Committee on Astronomy and Astrophysics Report by David Spergel, CAA Co-Chair Disclaimer: These slides.
May 11, Astronomy and Astrophysics Advisory Committee Astrophysics Division and Update May 11, 2006 Rick Howard Astrophysics Division Director (Acting)
Methodological Problems Faced in Evaluating Welfare-to-Work Programmes Alex Bryson Policy Studies Institute Launch of the ESRC National Centre for Research.
Potential Impacts of UV/Optical Photon- Counting DetectorTechnology Developments Christopher Martin California Institute of Technology NRC Technology Roadmap.
PHYSPAG JANUARY 2015 DARK ENERGY UPDATE RACHEL BEAN (CORNELL UNIVERSITY) Image Credit: NASA/GSFC Image Credit: ESA 1.
Emily Irwin CEP 806 Fall  Teaching experience:  I have worked with seventh and ninth grade biology students who are working on science fair projects.
The Scientific Method A Way to Solve a Problem.
Multi-slit spectroscopy In sky-noise dominated conditions (most interesting!) the use of slits is essential: eg: Faint object, extra-galactic, surveys:
Jenam 2010 Exoplanet Targets for Upcoming Cosmic Visions Space Missions James Frith September 8 th 2010 University of Hertfordshire.
Virtual Canada 2.0. » Knowledge is not just information » Knowledge is not philosophy (but it can be approached through philosophical inquiry) » There.
DRM1 design description SDT 5/17/12 1. WFIRST DRM candidate design summary At SDT6 2/2-3/2012 consensus for full-up mission, aka “DRM1” was: 1.3m aperture,
WFIRST-AFTA Mission Science Alan Dressler, AAS Seattle, January 7, /30/2014WFIRST-AFTA SDT Report 1.
Teaching and Mentoring Student Researchers Part 2: Scientific Research Dr. Nancy Allen College of Education, Qatar University Dr. Gene Jongsma Education.
Physics of the Cosmos Program Analysis Group John Nousek Penn State University International Workshop on Astronomical X–Ray Optics Prague, Czech Republic.
Office of Science U.S. Department of Energy DETF Recommendations I 2.1Science (Charge questions 1, 2, 7) Andy Albrecht & Nicholas Suntzeff 2.1.2Comments.
DARK ENERGY IN SPACE: WFIRST AND EUCLID RACHEL BEAN (CORNELL UNIVERSITY) ON BEHALF OF THE PHYSPAG DARK ENERGY COMMUNITY Image Credit: NASA/GSFC Image Credit:
Expectations What do you expect from: C&I Faculty? Yourself and other students? The Bachelor of Science in Education Program?
 What is Marketing?? MKT I. Definition  Marketing consists of the strategies and tactics used to identify, create and maintain satisfying relationships.
Michael Levi (Lawrence Berkeley National Laboratory), M. Lampton (UCBerkeley Space Sciences Lab), and M. Sholl (UCBerkeley Space Sciences Lab) WFIRST:
Enhancing your Program through Developing Shared Vision and Mission.
1 Dialogue and Learning in Teams. 2 High Performing Organization Course Team Learning and Dialogue Team Learning and Reflection Energy Communities of.
DO NOW: 1.State whether you agree or disagree with this statement-and tell me WHY- “Everyone learns the same way.” Be prepared to justify your answer.
WFIRST DRM2 candidate design – payload summary At SDT7 3/1-2/2012 consensus for concepts w/out overlap w/ other mission, aka “DRM2” was: 1.1m aperture,
NRO Telescopes David Spergel. History meter telescopes meter mirror “Residual space hardware” from Future Imagery Architecture, failed program.
2015 SAA Board Survey. Raw Board Survey ResultsStrongly Agree AgreeDisagreeStrongly Disagree Don't Know Total Points Responses minus DKs Average Score.
 What is Marketing?? MKT I. Definition  Marketing consists of the strategies and tactics used to identify, create and maintain satisfying relationships.
South Fork East Final Report December 28, 2015 Kevin Nobles 1.
PCOS/PhysPAG Town Hall AAS-HEAD, Monterey Richard Griffiths PCOS Program Scientist April 9, 2013 NASA HQ Perspective.
Unit Plan Assignment  Story of What Happened  Making Sense of Focus Students’ Responses  Improvements to Parts I through IV Lesson Sequences for Teaching.
GSMT SWG Meeting November, New GSMT Role NSF has asked that AURA/NOAO act as NSF’s "Program Manager" for the GSMT Technology development effort.
The Euclid Mission Jason Rhodes (Caltech/JPL) March 7, 2013 © 2013, government sponsorship acknowledged.
Fake Scenario Should school hours be changed to 12:00 to 6:00 pm.
KEY ISSUES IN SCIENCE LEARNING Confronting “Intuitive” Theories conceptual change vs. new information Developing Scientific Reasoning hypothesis testing.
A Prototype for JDEM Science Data Processing, Erik Gottschalk 1 A Prototype for JDEM Science Data Processing Erik Gottschalk Fermilab On behalf of the.
Euclid Big Data Opportunities Tom Kitching (UCL MSSL) – Euclid Science Lead.
BEHAVIOR BASED SELECTION Reducing the risk. Goals  Improve hiring accuracy  Save time and money  Reduce risk.
Nature of Science Vocabulary Words.
Negotiation Skills Presented by J.W. Owens A Perspective 101 Series
DATA COLLECTION METHODS IN NURSING RESEARCH
NEW Telescopes (NWNH Enabling Wide-Field)
Knowledge.
NEW Telescope Meeting , Princeton
The Science of Observation Vocabulary
AP Synthesis Essay The synthesis essay, added in 2007 is basically a “researched argument” You will be given some basic information, a prompt and 5-7 sources.
The Paper Table QUESTION:
Prof. Wayne’s Top Ten Tips for Course Success: Process Concerns
Self-Determination & Self-Advocacy
A Design Process Introduction to Engineering Design
What would you do differently if you were told Q is negative?
Captain Argument – loves agreeing and disagreeing
I CAN DECIDE…IT’S UP TO ME
Using Inquiry to Discover the World
BE Machine Learning & Data Analytics Forum
BE Machine Learning & Data Analytics Forum
Presentation transcript:

DRM 2 What to do?

A: Remind you of the charge Develop a final DRM for WFIRST that does not duplicate the capabilities of Euclid and LSST. Assess options for meeting all of the New World New Horizon requirements with the combination of Euclid, LSST, and a WFIRST DRM. Assess the science impact of such options. Examine options for reducing overall cost of the mission. The mission design is to be technically capable of a launch by the end of calendar year 2022.

A: Remind you of the charge Develop a final DRM for WFIRST that does not duplicate the capabilities of Euclid and LSST. Assess options for meeting all of the New World New Horizon requirements with the combination of Euclid, LSST, and a WFIRST DRM. Assess the science impact of such options. Examine options for reducing overall cost of the mission. The mission design is to be technically capable of a launch by the end of calendar year 2022.

A: Remind you of the charge Develop a final DRM for WFIRST that does not duplicate the capabilities of Euclid and LSST. Assess options for meeting all of the New World New Horizon requirements with the combination of Euclid, LSST, and a WFIRST DRM. Assess the science impact of such options. Examine options for reducing overall cost of the mission. The mission design is to be technically capable of a launch by the end of calendar year 2022.

What this is not This is NOT a license to re-design WFIRST from the ground up (in my opinion) The NWNH requirements still apply, and to expand our capabilities beyond those needed to meet the NWNH requirements is not what I believe is requested here – since we believe that IRDM meets the NWNH requirement, expansion of our capabilities is not required

Two steps Identify the “capabilities” that are duplicated between WFIRST and EUCLID, LSST & JWST Once we have identified the duplicative capabilities, we re-imagine a mission that meets the remaining NWNH objectives in the most cost- effective fashion First: what do we mean by “capabilities”

Capabilities 1: Scientific capability e.g. BAO, weak lensing, microlensing, etc. 2: Observational capability e.g. slitless spectroscopy with a spectral resolution of X over a bandpass of Y imaging sky survey with an effective shape knowledge of X over Y bandpass in Z colors 3: other perspectives may exist

Meeting the NWNH requirements To meet the charge, if we drop a capability from WFIRST, we are admitting that the NWNH requirements are being satisfied, in that area, by Euclid+LSST+JWST w/o WFIRST – i.e. there is no reason to have that capability at all on WFIRST – either we need it, or we don’t Reducing, but maintaining a capability, makes no sense with respect to our instructions

The Hard Part First we must determine what duplicative capabilities are not required on WFIRST in order that that E + L + J - W still meets the NWNH requirements Ask this: – Does E + L + J – W meet the NWNH requirements to perform: BAO, RSD, WL ?

The Hard Part First we must what duplicative capabilities are not required on WFIRST in order that that E + L + J - W still meets the NWNH requirements Ask this: – Does E + L + J – W meet the NWNH requirements to perform: BAO, RSD, WL ? – I feel that the recent NRC report has answered this question for us.

The Hard Part First we must what duplicative capabilities are not required on WFIRST in order that that E + L + J - W still meets the NWNH requirements Ask this: – Does E + L + J – W meet the NWNH requirements to perform: BAO, RSD, WL ? – However, if we disagree, we can start dropping capabilities (this is the hard part)

The Easy Part Once we know what capabilities we no longer need – we redesign the mission Such a mission will presumably perform fewer overall tasks, so that more time is available for the remaining tasks, potentially allowing a smaller aperture, smaller/fewer detectors arrays, etc. ( we have to do something to make it cheaper)

The Even Harder Part Now – we have to sell this descoped mission to the community and the mid-decade review. We are walking a narrow path with a cliff on either side – WFIRST may not happen because its costs are incompatible with NASA’s resources – WFIRST may not happen because a descoped mission is insufficiently compelling to justify even the reduced resources it would require