Outstanding Issues & Action Items 1.Obligations to Honor Ancillary Services Commitments 2.Variable ERCOT Bias 3.Sign reversals of the Regulation Signal.

Slides:



Advertisements
Similar presentations
IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
Advertisements

January 9, 2013 BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC.
Proposal on Ancillary Service Deliverability Requirements QMWG January 6, 2012.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
ERCOT Update on PUCT Posting changes DEWG Meeting 11/27/07 Matt Mereness.
March 13, 2013 Day-Ahead Market (DAM) Clearing Process follow-up from February WMS Matt Mereness, ERCOT Manager DAM & CRR.
Loads Acting as a Resource Relationships with QSEs and LSEs
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
PDCWG Report to ROS August 12, 2010 Sydney Niemeyer.
NSRS deployment April John Adams ROS – May 12, 2005.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
Frequency Response Standard. ERCOT Governor Droop.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
Section 5.9 – added export language Each ERS Generator site must have an interconnection agreement with its TDSP prior to submitting an ERS offer and must.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
NPRR 097 DSR and Small Capacity / Low Operating Level Issues for Compliance Monitoring.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
Frequency Control Task Force Report to WMS March 22, 2006.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Analysis of ERCOT Regulation Service Deployments during 2011 David Maggio Market Enhancement Task Force Meeting 3/29/
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
Graph Trend Definitions Telemetered SCE: Sum of all QSE’s Telemetered SCE (uses “Left” scale). Regulation Deployed: Sum of all Regulation Ancillary Service.
Application of High Sustainable Limit With PRR 666/676 WMS November 15, 2006 Ino Gonzalez ERCOT Settlements.
PDCWG Report to ROS David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy.
Discuss Options to Improve Market Visibility to RTBES Presented by: Matt Mereness Friday, October 27, 2006.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) August 8, 2012 PDCWG August 9, 2012 ETWG/QMWG.
2003 State of the Market Report ERCOT Wholesale Electricity Markets.
Resource Parameters Needed for LFC NATF WebEx Meeting 05/11/2010 Dave Maggio Operations Engineer, Supply Integration and Grid Applications.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
PDCWG 8/25/2015 GTBD Bias Analysis ERCOT Market Analysis and Design PDCWG August 25, 2015.
BAL-001-TRE-01 ERCOT CPS2 R2 Waiver Regional Variance April 16, 2009 Sydney Niemeyer.
PDCWG Report to ROS Sydney Niemeyer Chair NRG Energy Don Blackburn Vice Chair Luminant Energy.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
14 Minute Ramp Period Testing Workshop June 30, 2009.
PRR525 SCE Method Comparison ERCOT Compliance December 3, 2004.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Document number Anticipated Impacts for FRRS Pilot Program ERCOT TAC Meeting September 7, 2012.
1 Nodal Stabilization Market Call December 27, 2010.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
Operations Update ERCOT Board Meeting March 18, 2003.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
ERCOT Update on Day-Ahead Extract and other PUCT Posting changes DEWG Meeting 10/29/07 Matt Mereness.
Operations Update Kent Saathoff TAC Meeting March 6, 2003.
PRR 525 Update Prepared by ERCOT Compliance December 2005.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
QSE Managers Working Group Report to WMS September 19, 2007.
1 Compliance Update April Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
Text reason for Deviation from Defined High Sustained Limit/Low Sustained Limit John Adams January 5, 2010 Nodal Advisory Task Force.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
TAC Report to the ERCOT Board
Current FRRS Language & Explanation of Posted Data
Market Notice Regarding Off-line Units
David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
Presentation transcript:

Outstanding Issues & Action Items 1.Obligations to Honor Ancillary Services Commitments 2.Variable ERCOT Bias 3.Sign reversals of the Regulation Signal

Obligations to Honor Ancillary Services Commitments The Ancillary Service Obligations from the schedule submitted prior to the close of the Adjustment Period are binding commitments of the QSE to ERCOT. If ERCOT issues Resource-specific OOME or Resource-specific Balancing Energy Dispatch Instructions to a QSE that causes the QSE to be unable to Supply its Ancillary Service Obligation(s), the ERCOT shall issue a verbal Dispatch Instruction that: (1)Relieves that QSE from having to provide the specific Ancillary Service(s) for specific intervals and the reason or, (2)Retracts the Dispatch given to the QSE so that the QSE may come back into compliance with their Ancillary Service Obligation(s).

Cat 2 & 4 deployments The RRS deployment supersedes the Category 2 or 4 deployments –VDI granted only if RRS was deployed –VDI temporarily relieve them from their Category 2’s and 4’s During RRS deployment.

2. Variable ERCOT Bias During ROS discussions on PRR 586, ERCOT was requested to investigate implementing a variable bias. ERCOT Bias calculated by averaging observed performance of Measurable Events over 2 periods –May 1st to September 30th –October 1st to April 30th

Alternative Options Considered 1.Sum QSE telemetered bias 2.Estimate Bias based on unit mix 3.Average Bias over smaller periods Any significant variance in the bias term requires additional tuning of other parameters. A bias that could change with system conditions would be difficult to maintain

1. Sum QSE telemetered bias QSE required to telemeter frequency bias of portfolio generation resources in accordance with Protocols § –The sum of individual bias does not reflect total performance Most bias values provided are fairly accurate Some QSE currently are not submitting a bias value. Data failure could lead to wide variances in ERCOT bias

2. Estimate Bias based on unit mix Build logic in EMMS that varies bias based on unit type and generic droop for each type. –Actual droop characteristic unknown –Available capacity (unit at HSL or LSL) changes actual individual response. –Data failure could lead to wide variances in ERCOT bias –Any significant variance in the bias term requires additional tuning of other parameters.

3. Average Bias over smaller periods Change Monthly based on previous performance –Reduces sample set May need 3+ years of response to have adequate number of Measurable events Rolling average would encompass peak and off- peak conditions

Current Bias Setting Although the bias term is static, ERCOT AGC adjusts the amount of control over different system conditions in 2 ways: 1.Magnitude of frequency deviation –Small deviations ~ bias/3 –Medium deviations ~ bias/2 2.Operator action

Frequency Desk Procedures Adjustment of Requested ACE % Allows operator to scale bias –Control = ACE% * |bias*ΔF| Normally set to 100%. Procedures direct operator to adjust the setting to –Prevent Oscillation or under control (2.5.1 (1)) –Maintaining ERCOT CPS > 100 (2.4.3 (1))

3. Reversals of the Regulation Signal ROS FCTF indicated counting the times the Regulation signal changed direction may be valuable in evaluating secondary frequency control 3 months data collected 1/8/06 18:30 – 20:30 –514 reversals over the day, 56 over the 2 hours.

Summary AugustOctoberDecember minimum maximum average stddev