3101 Wilson Boulevard | Suite 700 | Arlington | Virginia 22201 | Telephone: (703) 684-1125 w w w. s t a n l e y a s s o c i a t e s. c o m ASC-IMMOS Pricing.

Slides:



Advertisements
Similar presentations
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Advertisements

Section 2 Production Chapter 3 Analysis of Indirect Costs Chapter 4 FPIF Contracts.
Private Boat Ramp Permit Application Harold Mills District 1 September 23, 2014 Environmental Protection Division Environmental Protection Division.
1 Basics of Government Contracting. Federal Procurement Background The U.S. Government is the world’s largest purchaser of goods and services 2.
Contract Types and Appropriate Incentives. 1 Jo Cunningham Distinguished Member of Laboratory Staff Sandia National Laboratories Session #3, 1:00pm -
Contract Types. Forms of Contracts Completion – A product is delivered –Cost or Fixed Price –Product must be delivered –Contract completed on delivery.
The Factor Price Equalization Theorem Assumptions: there are two countries using two factors of production producing two products; competition prevails.
1 Course outline II n Product differentiation n Advertising competition n Compatibility competition Heterogeneous goods.
Hospitals HAS Revenue Philanthropy and grants Global budgets Charges Per diem.
Profit Maximization Profits The objectives of the firm Fixed and variable factors Profit maximization in the short and in the long run Returns to scale.
Further short-term decisions
Discussion of Virtual Divestitures: Will They Make a Difference? By Bert Willems Steve Puller, Texas A&M.
Engineering Project Management Spacecraft Design Tuesday, January 21, 2003 M. McGrath.
15-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e CHAPTER 15 Project Procurement.
For any firm one of three conditions hold at any given moment: The firm is making positive profits The firm is suffering losses The firm is just breaking.
Introductions Mike Dement Multi Management Services
1 QUALITY ASSURANCE EVALUATOR TRAINING ADVISORY & ASSISTANCE SERVICES CONTRACTS.
Introductory to the “Basics” of Contract Types and Their Impact in the Management of Government Property Presented by: Fay K. Schulte, CPPM.
Chapter 27: Natural Monopolies: (De)Regulation? Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 13e.
Dryden Flight Research CenterNovember 8, Aerospace Ground Equipment Support Services Price Proposal & Evaluation Linda Gaugler Mathematician (Lead)
BBI2O – Functions of a Business HUMAN RESOURCES. Function of HR Management 1.Evaluating the Labour Market 2.When do you need an employee? 3.The application/interview.
Boreal Renewable Energy Development Ferriter Scobbo & Rodophele PC Outback Engineering Richard C. Gross, Inc. March 12, 2009 Notus Clean Energy LLC Wind.
Contract Types PAO Approved SPR Contract Types
1 9/21/2015For Official Use Only Negotiation Sensitive Business Clearance for XX Program XX Jan XX.
 $10.65 x 40 = $  $ x 50 = $21,
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force Base Conversion Directorate Presented by Lt. Col. Daniel Welch AFCEE/BC.
Increasing, Diminishing, and Negative Marginal Returns Labor (number of workers) Marginal Product of labor (beanbags per hour) –1 –2.
Pre-Proposal Conference NASA Langley Research Center October 26, 2009.
PURCHASING BASIC QUESTIONS TO ASK YOURSELF:  WHAT IS THE ESTIMATED COST OF THE SUPPLY OR SERVICE?  IS MY DEPARTMENT AUTHORIZED TO BUY THIS? (IE. IT RELATED.
Report Timberlane Food Service Program. Program’s Financial Status As of 2/28/2013 the program has a loss of ($94,652) Whitson’s Original Projection.
State Rates Advisory Committee: Various Rate Updates December 2005 State of Montana Helena, Montana Davis Deshaies, LLC.
YOUR PROPOSAL CAN LEAD TO CONTRACT AWARDS
September 21, 2015 VIRGINIA CRIMINAL SENTENCING COMMISSION Fee Waivers for Training Seminars and Guidelines Manuals.
Felix Sanchez Estimating the Budget and Cost (Part 1) Project Management for ARA Engineers and Scientists Developing a Bottoms Up Estimate.
TIDEWATER GOVERNMENT INDUSTRY COUNCIL How to Analyze Party Obligations Under a Contract By Damien Walsh and Beverly Arviso.
HPC Training and Consulting 1 Training  Technical support  Training  Weekly tutorials on selected topic  Graduate Student Forums  Bootcamps – getting.
Economics concepts(1): wants : want is desire; demand is a desire supported by the ability($$$$$) to satisfy the desire: unlimited wants : for what.
Diagnostic Imaging Center of Macomb Business Plan.
Monopolies!!! Are they good for society?. Monopoly Characteristics: 1. Number of Firms = 1 2. Variety of Goods = None 3. Barriers to Entry = Complete.
2 Year Schedule FTES Projections. Assumptions ΔCourse list supplied by Area Coordinators ΔFTES calculated from ΔContact Hours ΔAccounting Method (Weekly,
RFP – Clauses & Fee Structure Mark A. York, MSFOC Contracting Officer.
3101 Wilson Boulevard | Suite 700 | Arlington | Virginia | Telephone: (703) w w w. s t a n l e y a s s o c i a t e s. c o m ASC-IMMOS Pricing.
ICAO PKD Implementation Financing Requirements May 18, 2004.
Priced Proposal Training October/November 2015 DEPARTMENT OF TRANSPORTATION.
Click on Next to continue Fixed Price Contracts Cost Reimbursable Contracts Time and Materials Next Involves setting a fixed total price for a defined.
3101 Wilson Boulevard | Suite 700 | Arlington | Virginia | Telephone: (703) w w w. s t a n l e y a s s o c i a t e s. c o m C4ISR/ISEA/Fleet.
1 Comprehensive Tactical Infrastructure Maintenance and Repair (CTIMR) Area 3 Pre-Proposal Site Visit HSBP1015R0040 Sectors EL PASO / BIG BEND, TX
3101 Wilson Boulevard | Suite 700 | Arlington | Virginia | Telephone: (703) w w w. s t a n l e y a s s o c i a t e s. c o m Consolidated.
Introduction to MIS1 Copyright © by Jerry Post Introduction to MIS Appendix 11 Creating a Business Plan.
1. 2 Managing Risk and Reward by Contract Type Breakout Session # 501 Beverly Arviso, CPA, Fellow, CPCM, CFCM, Arviso, Inc. Tuesday, July 31, :30-3:45.
1 Pasadena Community Access Corporation FY 2015 Operating Budget June 9, 2014.
Block 7 Project Procurement Management. ► The processes required to acquire goods and services from outside the organization ► Purchasing  Procurement.
1 For Official Use Only 6/12/2016 Business Clearance for XX Program XX Jan XX.
3101 Wilson Boulevard | Suite 700 | Arlington | Virginia | Telephone: (703) w w w. s t a n l e y a s s o c i a t e s. c o m ASC-IMMOS Pricing.
Virginia A. Faust, AICP NC Department of Commerce, Division of Community Assistance With funding provided by the Appalachian Regional Commission 2006 Recreating.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Life Cycle of Federal Acquisition
DLL Clean Technology Financing Lighting Projects and our Vendor Partner John Ceschan 5/2/16.
Unit 3 : Reading Quiz # 9 : 6 points
15 Monopoly.
Contract Clearance for
Contracting Officer Podcast Slides
CPFF,CPIF,CPAF FPIF FFP,FPIF FFP CPFF FPIF,FPAF FFP FP (EPA)
CPFF CPIF CPAF FPI(F) FPAF FFP
Cost Concepts and Design Economics
Costs, Revenue and Profit
[Organization Name] Five-Year Business Plan to
Profit-Maximizing Level for Mini-Z
Omnibus IV Procurement Overview Michael D’Alessandro
Delta Water Supply Project
Presentation transcript:

3101 Wilson Boulevard | Suite 700 | Arlington | Virginia | Telephone: (703) w w w. s t a n l e y a s s o c i a t e s. c o m ASC-IMMOS Pricing Summary

2 Opportunity Summary  Contract Type: Cost Plus Fixed Fee with Firm Fixed Price CLINs where applicable.  5 Year Contract (Base Year, 4 Option Years)  CLIN Structure (Per Contract Year) –15 CPFF CLINs –31 FFP CLINs –22 Cost Reimbursable CLINs  Total Proposed Price: $117.9M  Net Profit: 7.68%

3 ASC-IMMOS Proposed Pricing

4 Net Profit Discussion  AWRDS Option Year 4/WMMS/WMMS-D Current Pricing –CPFF CLINs: 43% ($12,107,062) –FFP CLINs: 50% ($14,089,902) –Cost CLINs: 7% ($2,121,531) –Net Profit as Proposed: 8.52%  ASC-IMMOS Proposed Pricing –CPFF CLINs: 67% ($79,084,812) –FFP CLINs: 29% ($33,683,416) –Cost CLINs: 4% ($5,181,808) –Net Profit as Priced: 7.68%

5 Pricing Assumptions  Staffing Optimized to Enhance Competitive Position –Reduced current staffing levels by 13 FTEs due to economies of scale between all systems –5 FTEs will be “reinstated” if Surge Support CLIN is funded  Overtime Not Priced Based on RFP Restrictions –Site Operations positions priced at straight 40 hour work week –If funded, overtime will equal approximately 11 FTE’s  Staff Ramp Down in Option Years –No out year SCR’s have been identified, reduced staff by 12 FTE’s in each Option Year –Expecting SCR’s to be identified and funded based on historical system support

6 Pricing Approval Form