P. 1Mario Deile – Meeting on Experiment Protection from Beam Failures Protecting TOTEM Mario Deile PH-TOT 12.06.2007.

Slides:



Advertisements
Similar presentations
P. 1Mario Deile – Machine Background Mario Deile Status of the Studies.
Advertisements

Answers/considerations to the questions raised on the last ASSRC meeting on Sept. 24, 2013 The following is my summary from s, private communication.
CLIC collimator survival IWLC 2010 J.L. Fernández-Hernando – ASTeC/Cockcroft Institute (Daresbury Lab.) 21/10/2010 J.L. Fernández-HernandoASTeC/CI21/10/2010.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
BLM review Mario Santana Leitner OUTLOOK ON FLUKA SIMULATIONS FOR UDULATOR DAMAGE AND BLM RESPONSE Mario Santana Leitner, Alberto.
BLM thresholds for MQW magnets V. Raginel, B. Auchmann, D. Wollmann BLM Threshold Working Group meeting, 24/02/2015.
M. Gallinaro - "Physics with the CT-PPS project" - LHC Forward - Sep. 23, Michele Gallinaro LIP Lisbon (on behalf of the CMS and TOTEM collaborations)
GRD - Collimation Simulation with SIXTRACK - MIB WG - October 2005 LHC COLLIMATION SYSTEM STUDIES USING SIXTRACK Ralph Assmann, Stefano Redaelli, Guillaume.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
The First 1 ½ Years of TOTEM Roman Pot Operation at the LHC M. Deile, G. Antchev, I. Atanassov, V. Avati, J. Baechler, K. Eggert, J. Kašpar, F. Lucas Rodriguez,
January 2006Beam dump and injection inhibits / J.Wenninger1 Beam Dump and Injection Inhibits J. Wenninger AB-OP & D. Macina TS-LEA LHC experiments signals.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
PERFORMANCE OF THE MACRO LIMITED STREAMER TUBES IN DRIFT MODE FOR MEASUREMENTS OF MUON ENERGY - Use of the MACRO limited streamer tubes in drift mode -Use.
Running at Low  * and High Lumi Test insertion on 13 October 2011:
Status of the Roman Pot Movement System and the Interlocks Mario Deile
Daniela Macina (CERN) Workshop on Experimental Conditions and Beam Induced Detector Backgrounds, CERN 3-4 April 2008 Experiments protection from beam failures.
First AWAKE dump calculations Helmut Vincke. Beam on dump Muon axis inside and outside CERN Distances: Beam impact point to end of West hall: ~300 m Beam.
ATLAS Forward Detector Trigger ATLAS is presently planning to install forward detectors (Roman Pot system) in the LHC tunnel with prime goal to measure.
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Post Mortem Collimators and Movable Objects Michel Jonker Post Mortem Workshop Cern, 16 & 17 January 2007.
Status of FLUKA Simulations for Collimation BLM Thresholds 6 th BLM Threshold Working Group 10/02/2015 E.Skordis On behalf of the FLUKA team Sixtrack input.
LHC Collimation Project Integration into the control system Michel Jonker External Review of the LHC Collimation Project 1 July 2004.
Requirements from the experiments D. Macina (EN/MEF) Conceptual Design Review LHC Phase II Collimation, CERN April Many thanks for input and discussion.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
Improvements of the ALFA and TOTEM Roman Pot Movement System in TS1 Mario Deile with input from P. Fassnacht, S. Jakobsen, J. Kaspar, S. Ravat for the.
Background Simulations for the LHCb Beam Condition Monitor Overview: ● The LHCb Beam Condition Monitor (BCM) – Purpose, Design and Function – Implementation.
1 Triggering on Diffraction with the CMS Level-1 Trigger Monika Grothe, U Wisconsin HERA-LHC workshop March 2004 Need highest achievable LHC Lumi, L LHC.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
ATLAS-ALFA as a beam instrument Sune Jakobsen (BE-BI-PM and PH-ADO) on behave of the ATLAS-ALFA community LS1 LBOC meeting
IHEP/Protvino for FP420 R&D Collaboration 1 IHEP/Protvino Group: Igor Azhgirey Igor Bayshev Igor Kurochkin + one post-graduate student Tools:
Chamonix 2006, B.Dehning 1 Commissioning of Beam Loss Monitors B. Dehning CERN AB/BDI.
Beam losses in the CLIC drive beam: specification of acceptable level and how to handle them ACE Michael Jonker.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
AWAKE: D2E for Alexey beam properties Silvia Cipiccia, Eduard Feldbaumer, Helmut Vincke DGS/RP.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
1 CAN WE KEEP THE CURRENT SYSTEM FOR LIU BEAMS ? Francesco Cerutti, Alessio Mereghetti, Joao Saraiva LIU-SPS Beam Scraping System Review 2013 Jan 22 contributions.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
HL-LHC WP14 2 nd meeting: Intercepting devices and failure cases to be studied Anton Lechner, Jan Uythoven.
Integration of forward physics detectors into the LSS of the LHC D. Macina (TS/LEA) Technical Support 2004 Workshop.
Fabio Follin Delphine Jacquet For the LHC operation team
y x Vincenzo Monaco, University of Torino HERA-LHC workshop 18/1/2005
C. Bracco, R. Bruce, B. Goddard, C. Wiesner, A. Lechner, M. Frankl
Testbeam Planning Common to all testbeams:
The TV Beam Observation system - BTV
BEAM LOSS MONITORING SYSTEM
Introduction: FCC beam dumping system
First data from TOTEM experiment at LHC
Emmanuel Tsesmelis TS/LEA 26 January 2007
MD2036: UFO dynamics studies and UFO fast detection
Recent Results from TOTEM
Saturday 21st April 00:33 Interlock during ramp on BLM HV
TI8/WIC Incident & UJ87/UA87 Radiation Levels & Analysis
Safe mode transmission
of secondary light ion beams
BEAM LOSS MONITORING SYSTEM
Tuesday TOTEM and transverse loss map (1) OK
Damage Levels V. Kain AB/Co
LHC Injection and Dump Protection
Equipment of experiments directly interfering with the beam operation
Sensitivity tests of BLM_S chamber in PSB dump
Why do BLMs need to know the Quench Levels?
Commissioning of the Beam Conditions Monitor of the LHCb Experiment at CERN Ch. Ilgner, October 23, 2008 on behalf of the LHCb BCM group at TU Dortmund:
The LHC Beam Interlock System
PERFORMANCE OF THE METAL RADIATION MONITORING SYSTEMS
Fri :52 Stable beams fill #2536
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

p. 1Mario Deile – Meeting on Experiment Protection from Beam Failures Protecting TOTEM Mario Deile PH-TOT

p. 2Mario Deile – Beam Damage Levels: Roman Pot: Window Bottom foil of Roman Pot window Fluka simulation by E. Dimovasili: Accident Scenario: A nominal bunch (1.1x10 11 p) through the bottom RP window Beam dimensions according to high beta optics at XRP3 (β*=1540 m):  x = 30  m,  y = 80  m  worst case scenario old design; now 150  m

p. 3Mario Deile – Temperature increase in the central bin along the beam axis normalized to one nominal LHC bunch (1.1 x protons) Melting of Inconel 718  6.3 x p window length = 3.4 cm Damage Levels: Roman Pot: Window Impact on transverse window: z = 150  m  no problem Mechanical stress effects not included! full bunch on window edge

p. 4Mario Deile – Damage Levels: Roman Pot: Window Normal running (7 TeV): RP at 10  ; -   = 1540 m: narrow beam: RP220:  x = 0.03 mm,  y = 0.08 mm (scenario of the study above) wider at RP147:  x = 0.24 mm,  y = 0.17 mm 43 bunches: asynchronous beam dump: at most 1 bunch can hit the RP. (? To be checked) Seems OK for bunches up to 6 x p. -   = 90 m: wide beam: RP147:  x = 0.4 mm,  y = 0.3 mm RP220:  x = 0.4 mm,  y = 0.6 mm  much less concentrated 156 bunches: asynchronous beam dump: how many bunches can hit the RP ? -   = 2 m, 0.5 m: wide beam: RP147:  x = 0.3 mm,  y = 0.5 mm RP220:  x = 0.1 mm,  y = 0.3 mm 2808 bunches: asynchronous beam dump: at most 8 bunches can hit the RP. (?) Potentially dangerous even for small bunches. “Safe beam” (10 10 p total): OK for RP window. Injection (450 GeV): RP retracted  less risk another Fluka simulation: 1 full bunch (1.1 x p)   T ~ 200ºC OK “safe beam” (10 12 p):  T ~ 2000ºC ??? Problem:  T does not scale linearly with the charge (specific heat depends on T). What is the impact of the bunching scheme ? (1 big bunch vs. several small ones with distance  t and same total charge)

p. 5Mario Deile – Damage Levels: Roman Pot: Silicon Detectors Thin detectors (300  m): damage by heat very unlikely. Displacement damage by non-ionising energy loss: independent of HV expected hardness at 450 GeV and 7 TeV:  max ~ 5 x p/cm 2 Fluence of 1 full bunch (area within 3  beam ): worst case scenario: thin beam at   = 1540 m:  1 bunch = 6 x p/cm 2 damage limit:  max /  1 bunch = 8 bunches standard scenario: thick beam at   = 0.5 m:  1 bunch = 9 x p/cm 2 damage limit:  max /  1 bunch = 58 bunches Fluence of safe beam at injection (10 12 p total),   = 11 m, E = 450 GeV:  safe beam ~ 3 x p/cm 2 <  max OK RP detectors will be retracted with HV off at injection.

p. 6Mario Deile – Damage Levels: T2 (GEMs) No dedicated accident studies available Melting: unlikely but not studied Ageing: GEMs were tested up to  = 1.4 x p/cm 2 without performance loss. Fluence of 1 full bunch at 14 m from IP5:   = 0.5 m:  1 bunch = 2.4 x p/cm 2 : OK   = 1540 m:  1 bunch = 1.9 x p/cm 2 : OK Fluence of safe beam at injection:  safe beam ~ p/cm 2 T2 will be off during injection. General problem for studies of injection phase: Optics properties for   = 11 m needed.

p. 7Mario Deile – Damage Levels: T1 (CSCs) No dedicated accident studies available Melting: unlikely but not studied [main material: 30 mm honeycomb (Nomex)] Ageing: tested by CMS for same gas mixture (NIM A515: , 2003) up to 0.4 C/cm or 1.3 x p/cm 2 without significant performance deterioration.  tested fluence is of same order of magnitude as the one of a full bunch.

p. 8Mario Deile – Problem Diagnostics During injection: all detectors off  diagnostics only from - BLMs - BPMs - radiation monitors fixed in various places on the RP During normal running: - trigger rates from T1, T2, RP (individual detectors and track coincidences) details of trigger scheme still in preparation; RP trigger rates to be calibrated w.r.t. BLM rates; - detector currents (read-out frequency still unclear; not on kHz level); - radiation monitors, BLMs, BPMs.

p. 9Mario Deile – Protection Strategy 1.Protection of T1, T2 - Detectors placed inside CMS  hopefully protected by CMS’s BCMs at z = 1.9 m, r = 4 cm and z = 14.4 m, r = 5 – 29 cm (near T2); to be investigated and to be discussed with CMS - HV on  injection inhibit 2.Protection of RP - RP has to be out except for “stable beam” or “unstable beam”: ensured by interlock system via “user_permit” (first CIBU) - HV on  injection inhibit - Wish: RP movement controlled by collimator supervisor system (agreement still to be concluded) ensures that RP stay always in the shadow of collimators - rate too high  retract RP: threshold still undefined; beam dump due to high detector rate not foreseen in the beginning. Option for beam dump via “user_permit” (second CIBU) reserved for later.

p. 10Mario Deile – Expected Roman Pot Rates Estimated signal + background rates  gives an idea about orders of magnitude of possible retraction thresholds  * = 1540 m, L = cm -2 s -1 : Single plane rate (2 vertical + 1 horizontal – overlap): ~ 100 kHz  * = 90 m, L = cm -2 s -1 : Single plane rate (2 vertical + 1 horizontal – overlap): ~ 400 kHz  * = 0.5 m, L = cm -2 s -1 : Single detector rate (1 horizontal): ~ 200 MHz (unusable) Local track coincidence rate: ~ 4 MHz Background estimates difficult  Only experience will teach the real rates.

p. 11Mario Deile – Interlock Actions TOTEM has 2 CIBUs: RP position Detector information (e.g. rate), unused in the beginning, corresponding “user_permit” kept permanently “high” (UPS) Dumps the beam and inhibits injection if RP is IN and the mode forbids it. Drives the RP out if it is IN and the beam is not stable. [graphs © D. Macina]

p. 12Mario Deile – Software Interlock: Injection Inhibit Prevent injection when RP is IN and existing beam should not be dumped, e.g. during normal running; Detector HV is on. To be implemented as a software interlock.

p. 13Mario Deile –

p. 14Mario Deile – Total Fluence after 1 fb -1 Charged Hadrons: Averaged over horizontal detector: = 0.7 x cm -2 Maximum in the diffractive peak (protons with E  7 TeV): averaged over 2 x 2 mm 2 bin: F max, 2x2 = 6 x cm -2 extrapolated to detector edge (10  mm = 1.2 mm from beam centre): F max = 3 x cm -2 Damage factor of 7 TeV protons is 1/10 of 1 MeV neutrons  equivalent 1 MeV neutron fluence: F equ = 3 x cm -2 Detectors can survive F equ, det ~ 1 x cm -2 corresponding to 3 fb -1 Neutrons: much lower than charged hadrons: Averaged over horizontal detector: = 0.1 x cm -2 Maximum (over 4 x 2 mm 2 ): F max = 2 x cm -2

p. 15Mario Deile – Control of Roman Pots Collimator Supervisory System (one or two per LHC point) Collimator Supervisory System (one or two per LHC point) Beam Permit CCC Applications Ethernet Controls Network Data Base Actual Machine Parameters Data Base Critical Settings Machine Timing Machine Timing Distribution LHC tunnel Underground, low radiation area Surface support building Control room Synchronisation Fan out Local Ethernet Segment Motor Drive Control PXI Position Readout and Survey PXI Roman Pots Michel Jonker,