Deming’s Red Bead Experiment

Slides:



Advertisements
Similar presentations
The Great Blue Bead Company Quality Is Our Priority Based on a term project by Elizabeth A. Hoffman.
Advertisements

Control Charts for Variables
Operations Management Statistical Process Control Supplement 6
BPT2423 – STATISTICAL PROCESS CONTROL
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall8-1 Chapter 8: Statistical Quality Control.
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 11 Statistical Thinking and Applications.
CD-ROM Chap 17-1 A Course In Business Statistics, 4th © 2006 Prentice-Hall, Inc. A Course In Business Statistics 4 th Edition CD-ROM Chapter 17 Introduction.
Chapter 18 Introduction to Quality
Chapter 10 Quality Control McGraw-Hill/Irwin
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 11 Statistical Thinking and Applications.
Chapter 7 Analysis of ariance Variation Inherent or Natural Variation Due to the cumulative effect of many small unavoidable causes. Also referred to.
1 BA 275 Quantitative Business Methods Residual Analysis Multiple Linear Regression Adjusted R-squared Prediction Dummy Variables Agenda.
The Process of Management selected comments by W. Edward Deming.
Rev. 02/24/06SJSU Bus David Bentley1 Chapter 11 – Statistical Thinking and Applications “Red bead experiment”, random vs. non-random variation,
Chapter 19 Data Analysis Overview
Chapter 11 Statistical Thinking and Applications MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 9 Statistical Thinking and Applications.
Rev. 09/06/01SJSU Bus David Bentley1 Chapter 10 – Quality Control Control process, statistical process control (SPC): X-bar, R, p, c, process capability.
1 BA 555 Practical Business Analysis Review of Statistics Confidence Interval Estimation Hypothesis Testing Linear Regression Analysis Introduction Case.
X-bar and R Control Charts
1 1 Slide Slides by Spiros Velianitis CSUS Overview of DS 101.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Statistical Applications in Quality and Productivity Management Sections 1 – 8. Skip 5.
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna 17-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 17.
There are no two things in the world that are exactly the same… And if there was, we would say they’re different. - unknown.
Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.
Statistical Process Control Chapters A B C D E F G H.
Business Statistics: A Decision-Making Approach, 6e © 2005 Prentice-Hall, Inc. Chap 17-1 Business Statistics: A Decision-Making Approach 6 th Edition Chapter.
© 2003 Prentice-Hall, Inc.Chap 13-1 Business Statistics: A First Course (3 rd Edition) Chapter 13 Statistical Applications in Quality and Productivity.
Understanding Variation in Your Charts Module 5. What is the state of Statistical Control? A stable mean over time with only random variation about that.
Name: Angelica F. White WEMBA10. Teach students how to make sound decisions and recommendations that are based on reliable quantitative information During.
Variables Control Chart Chapter 10. Variables Control Chart Dr. Walter Shewhart ( ) –Father of Statistical Process Control –Inventor of Control.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 9 Statistical Thinking and Applications.
© 2002 Prentice-Hall, Inc.Chap 15-1 Statistics for Managers Using Microsoft Excel 3 rd Edition Chapter 15 Statistical Applications in Quality and Productivity.
To accompany Quantitative Analysis for Management, 9e by Render/Stair/Hanna 17-1 © 2006 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 17.
Chapter 10 Quality Control.
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
Regression Analysis Week 8 DIAGNOSTIC AND REMEDIAL MEASURES Residuals The main purpose examining residuals Diagnostic for Residuals Test involving residuals.
Measure : SPC Dedy Sugiarto.
Statistical Process Control04/03/961 What is Variation? Less Variation = Higher Quality.
1 …continued… Part III. Performing the Research 3 Initial Research 4 Research Approaches 5 Hypotheses 6 Data Collection 7 Data Analysis.
Example 13.2 Quarterly Sales of Johnson & Johnson Regression-Based Trend Models.
Business Statistics, A First Course (4e) © 2006 Prentice-Hall, Inc. Chap 14-1 Chapter 14 Statistical Applications in Quality and Productivity Management.
Engineering Statistics KANCHALA SUDTACHAT. Statistics  Deals with  Collection  Presentation  Analysis and use of data to make decision  Solve problems.
Statistical Process Control Production and Process Management.
1-1 Copyright © 2014, 2011, and 2008 Pearson Education, Inc.
1 SMU EMIS 7364 NTU TO-570-N Control Charts Basic Concepts and Mathematical Basis Updated: 3/2/04 Statistical Quality Control Dr. Jerrell T. Stracener,
Quality Control  Statistical Process Control (SPC)
McGraw-Hill/IrwinCopyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 17 Process Improvement Using Control Charts.
10 March 2016Materi ke-3 Lecture 3 Statistical Process Control Using Control Charts.
Chapter 17 Process Improvement Using Control Charts Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Chapter 16 Introduction to Quality ©. Some Benefits of Utilizing Statistical Quality Methods Increased Productivity Increased Sales Increased Profits.
1 Doing Statistics for Business Doing Statistics for Business Data, Inference, and Decision Making Marilyn K. Pelosi Theresa M. Sandifer Chapter 13 Time.
Yandell – Econ 216 Chapter 17 Statistical Applications in Quality Management Chap 17-1.
QUALITY CONTROL CHAPTER 8.
Statistical Thinking and Applications
EXCEL: Multiple Regression
RED BEAD EXPERIMENT
Modeling in R Sanna Härkönen.
Statistical Process Control
Statistical Process Control (SPC)
Statistics for Managers Using Microsoft Excel 3rd Edition
CONTROL CHARTS 1. These charts are used for process control. Statistical device used for control of repetitive process. 2. Developed by Dr. W.A. Shewart.
Data Analysis for Managers
BA 275 Quantitative Business Methods
Statistics for Business and Economics
Statistical Thinking and Applications
Statistical Thinking and Applications
I WANT TO BE A CONTROL FREAK !
Presentation transcript:

Deming’s Red Bead Experiment Slides by Spiros Velianitis CSUS “….. Stupidly simple….. The messages learned are not”

Summary Slide Red Bead Experiment Exercise Use of STATGRAPHICS to analyze the results Variation Common vs. Specific (Assignable) Causes Stable and Unstable Processes Lessons Learned from the Red Bead Experiment

Red Bead Experiment Exercise (step 1) Background I need 4 students to represent factory workers One is “middle management” Three are newly hired “Factory Workers” Teacher is the CEO Factory workers will be employed for 10 days on probation In order for the factory to be cost effective, workers must produce no more than 8 defective (red bead) items out of 50 items produced per day Here is our work day Factory Workers – Produce daily products Middle management – Records daily production defects (red beads) After the 10 day production Top management, middle management, and consultants (class) will construct a time series plot of the number of defects (red beads). We will look for trends

Red Bead Experiment Exercise (step 2) Management Decisions We will allow our factory workers to work for one more week (5 days of production) Necessary management decisions are made (class does not know what we decided) Here is our work day for week 3 Factory Workers – Produce daily products Middle management – Records daily production defects (red beads) After another 5 day production Extend the time series plot of the number of defects (red beads) to include the last 5 production defects We will look for trends We will examine the time series plot

Red Bead Experiment Exercise (step 3) Statistical analysis we will perform (identification tools) Stationary Constant Mean Constant Variance Time Series Plot Independence (Random) Runs Up and Down Test Normality Shapiro-Wilks Test In STATGRAPHICS we wil Test stationary: DTD: Describe -> Time-Series -> Descriptive Methods Test Independence: Runs Up and Down Test Tables Options (3 T’s): select “Tests for Randomness” Test Normality: DDF: Describe -> Distribution Fitting -> Fitting Uncensored Data Tables Options: select “Tests for Normality”

Lessons Learned (slides that follow

VARIATION COMMON Numerous small causes of variability that are inherent to any system, operate randomly or by chance SPECIFIC Assignable, have relatively large effects on process, occur occasionally or sporadic

Common vs. Specific (Assignable) Causes The variation in the quality of the production output is due to either common causes or specific (assignable) causes. Common causes: normal or natural variations in process outputs that are due purely to chance. No corrective action is necessary when output variations are due to common causes. Specific (Assignable) causes: Variation in process outputs that are due to special circumstances or factors (machine tools wearing out, incorrect machine settings, poor-quality raw materials, operator error, etc.)

Stable and Unstable Processes A process is Stable when variation made up of only common causes In an Unstable process (process is not in statistical control), variation is made up of both common causes and specific causes Identification Tools are used to find if specific causes of variation exist within a process

Lessons Learned from the Red Bead Experiment Variation is an inherent part of any process Only management can change the process Identification tools (time series plots, non parametric runs up and down test, and the Shapiro-Wilk test) can help us identify specific variation Workers work within a system over which they have little control. The system determines their performance. The work standard set by management may have no relationship to the capability of the system.

Summary Slide Red Bead Experiment Exercise Use of STATGRAPHICS to analyze the results Variation Common vs. Specific (Assignable) Causes Stable and Unstable Processes Lessons Learned from the Red Bead Experiment