The New Science Building Texas A&M International University Laredo, TX Nicole Griffith.

Slides:



Advertisements
Similar presentations
Concrete Construction Part 1
Advertisements

Eric M. Wetzel Carollo Engineers, Inc. Bentley Be Inspired Awards November 13, 2012.
PowerPoint ® Presentation Chapter 4 Flatwork Flatwork Applications Site Preparation Concrete Reinforcement Flatwork Procedures Joint Control Bleedwater.
© 2012 Autodesk Presenter’s First and Last Name Presenter’s Title AutoCAD ® Architecture 2013 What’s New Image courtesy of Wilson Architects.
STEM Center Delaware County Community College – Media, PA Thesis Final Presentation Dan Saxton Mechanical Option.
Arch 330 Fall 2008 FORMWORK AND REINFORCING FOR CONCRETE.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 22 Forming Systems.
WORKSHEET 4 CONCRETE. Q1 a) what are the two main properties that concrete must have? (i) strength b) how do we achieve them? by using an acceptable water.
Chapter 3. Obtaining Silica-Fume Concrete  Specifying Silica Fume and SFC  Proportioning SFC  Producing SFC.
Integrating Steel Presented By: Hala Ali Nabil Mohamed Ali By: John Jurewicz Web Address: articles/tools_ articles.html Topic.
Optimizing “Big Box” Construction Lauren Hughes Josh Hogan Kevin Hanson Joseph Garrott Rose-Hulman Institute of Technology.
Proportioning of Concrete Mixtures
Batching, Mixing, and Handling. Ordering or Specifying Concrete Alternative (1) Common: When the owner requires the concrete supplier to assume responsibility.
Street and Local Roads Inspection and Acceptance of Alternative Pavements.
Masonry Details.
Topic : MIX DESIGN OF CONCRETE Properties of concrete Submitted To: DR. AYUB ELAHI Submitted By: SOHAIB NASEER 2K9-scet-29/CIVIL M.ZAEEM FAKHAR 2K9-scet-03/CIVIL.
Chapter 12 Concrete Construction Part 2 1CE 417, King Saud University.
University Health Building Thesis Final Presentation
Concrete Construction
CONSTRUCTING A FIVE CABIN LATRINE
INTRODUCTION AS PROJECT MANAGEMENT COMPNAY (August 2012)
Chapter 11 Pricing Concrete Work. Objectives Upon completion of this chapter, you will be able to: –Describe the job factors and the labor and management.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Course No: CE 4000 INVESTIGATION ON THE PERFORMANCE OF BAMBOO REINFORCED CONCRETE BEAMS Supervised By: MUHAMMAD HARUNUR RASHID Presented By: MOHAMMAD TAREQ.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
More on Categories, Families, Types, and Instances Domain Knowledge in BIM Slides are made based on Autodesk BIM Curriculum, Greenwold, S., and D. Driver.
© 2012 Autodesk Autodesk® Revit® Structure: From Design to Detailing and Fabrication to Construction Allen Levy Applications Specialist.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Image courtesy of: Ryder Architecture Limited Building Information Modeling BIM-Based Parametric Modeling: More on Families and Parameters Slides are made.
Army National Guard Readiness Center Arlington, VA Arne Kvinnesland Construction Management AE Senior Thesis Final Presentation, Spring 2010 The Pennsylvania.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
Concrete Technology Ch8: Proportioning Concrete Mixes Lecture 14 Eng: Eyad Haddad.
Wilsdorf Hall Materials Science Engineering & Nanotechnology Building University of Virginia Leaha Martynuska Construction Management Option Senior Thesis.
CHAPTER 3 Resolution and Design. Predesign Phase Programming –Functions to: Guide Inform Inspire the project designer –Not a ‘grocery list’ –Not a ‘wish.
Concrete Countertops. Cast in place Pre – Cast Overlay.
Strategies for IT Adoption in the Building Industry © 2002 Prof. C.M. Eastman & Dr. R. Sacks 3-D Parametric Modeling of Buildings.
© 2012 Autodesk Autodesk Structural Curriculum 2013 Unit 5: Advanced Structural Analysis & Coordination Advanced Structural Analysis & Coordination.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Match Existing, Really? This is a very common requirement It makes sense, as who would “avoid matching existing” ? As I hope to point out, we need more.
What are they? How can I do them too? Construction + Materials IV: Construction Documents.
© 2011 Autodesk SE4247 – Modelling for Construction Ralph Pullinger Structural Technical Specialist, Autodesk, AEC Division (Northern Europe)
© 2014 Autodesk What’s New in Autodesk ® Advance Steel 2015 Presenter Name Presenter Title.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
M&M Precast, Inc. Project: I-66 Highways for Life Location: Rt. 50 Ramp (East) off I-66 – Fairfax, Virginia VDOT Project No.: (FO) , M501 FHWA.
© 2012 Autodesk AB1851 Optimizing the Design Development Stage using Revit Architecture Douglas Bowers, AIA, LEED AP BD+C Doug Bowers Consulting, LLC.
1.Click on the link below, this will open your web browser 2.Use “Extended Display” to project the.
Presentation Objective Delivering Value-Added Solutions
Mastering Autodesk Revit MEP 2016
SCHOOL OF FOREST RESOURCES BUILDING
RIBA Plan of Work 2013.
Grunenwald Science and Technology Building
Mastering Autodesk Revit MEP 2016 CHAPTER 21: Creating Devices
(Additional materials)
Cast in Place 2 way Flat slabs Basically joists in both directions
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Batching, Mixing, and Handling
Always Advancing Pervious
Biobehavioral Health Building, University Park, PA
Chapter 3 Resolution and Design.
Implementing Revit and Putting ACE BIM and CAD Standards
What is CONCRETE SLUMP TEST –
Justin Pennycoff AE Senior Thesis 2008 Construction Management
Lehigh Valley Heritage Center
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
Mastering Autodesk Revit MEP 2016 CHAPTER 19: Creating Equipment
Coppin State University
RIBA Plan of Work 2013.
Fiber Reinforced Polymer Systems
Presentation transcript:

The New Science Building Texas A&M International University Laredo, TX Nicole Griffith

The New Science Building 3 Story Cast-in-Place Concrete Structure 80,000 S.F. Estimated Cost of $18 Million Houses Science Labs, Classrooms, Offices Features a Planetarium and the Dean’s Office Tower

The New Science Building Owner: Texas A&M University System General Contractor: Constructors & Associates, Inc. San Antonio, TX Construction Began June 2003 Main Building Completed December 2004 Planetarium Complete May 2005 by Owner

Thesis Overview 4D Modeling Structural and Construction Feasibility Review of the Planetarium Concrete

CM Depth 4D Modeling

Reasons for Using 4D Modeling Complicated Schedule Setup Makes Sequencing and Level of Detail Difficult to Maintain Unique Structure of the Planetarium Can Make Visualizing the Construction Process Difficult 4D Modeling is a Key Technology Vitally Important to the Construction Industry

4D Modeling Create 3D Model of the Structure Using Autodesk Revit 7.0 Export into AutoCAD 2004 format Export into Common Point 4D Link to Structure Schedule

4D Modeling Revit is a Parametric Modeling Tool Model using Building Components Unique Structures, Such as the Planetarium, can be Difficult to Represent Must be Exported into AutoCAD First in Order to Export into Common Point Looses Detail, Difficult to Control Layers

Revit Model

AutoCAD Model

Common Point 4D Model

Results Multiple Sequencing and Level of Detail Errors Discovered in the Structure Schedule Using a 4D Model Could Have Eliminated Problems that Resulted Due to Confusion from the Construction Schedule

Sequencing Error

Inconsistent Sequence

Sequencing Error

CM Depth/Structural Breadth Structural and Construction Feasibility Review of the Planetarium Concrete Structure

The Planetarium

Planetarium Concrete Architectural Concrete Structural Base As-Cast Smooth Finish No Further Finishing After Formwork Removal Plastic-Laminated Plywood Formwork Result was Unacceptable to the Owner Variations in Color Inconsistent Texture Surface Imperfections (Lift Lines, Air Pockets) Visible Formwork Joints

Planetarium Concrete Investigate Both the Project Specifications as well as Standard ACI Specifications Look for Inconsistencies, Areas for Concern Review and Suggest Alternate Formwork Review and Suggest Alternate Concrete Mix Design/Specifications Review and Suggest Alternate Concrete Placement Methods

Standard Specifications Perform Slump Tests on Trial Batches at Highest & Lowest Expected Ambient Temperatures Not Specified or Performed for Project Poured in mid-July Creates Cause for Concern

Project Specifications No Fly Ash No Form Ties Mock-Ups & Pre-Installation Meetings Not Implemented Due to Time Constraints Small Samples Submitted Instead Well-Sealed Formwork Joints Not Properly Constructed

Formwork Conventional Forms Most Economical for This Type of Project Simple, but Proper Construction is Important Non-Reactive Form Release and Other Agents Smooth Finish is Not Optimal for Appearance Elevates Visibility of Surface Defects

Formwork

Resulting Recommendations Use Plywood Formwork with a Textured Plastic Liner Use a Non-Reactive Form Release Agent That Will Not Affect the Appearance of the Concrete Finish

Resulting Recommendations Consider the Use of Fly Ash in the Design of the Architectural Concrete Fly Ash Contains Properties That May Help Resolve the Problems Encountered Be Sure That Any Additives, Such as Water Reducing Agents and Curing Compounds, Will Not Alter the Finished Appearance of the Concrete

Resulting Recommendations Maintain Similar Temperatures for Concrete, Rebar, Formwork, and Any Other Affected Materials at all Times When Concrete is Being Poured to Eliminate Color and Texture Variations and Lift Lines

Resulting Recommendations Provide a Large-Mass Mockup of the Architectural Concrete Using Same Materials and Methods of Placement to Ensure the Quality of the Final Product Be Sure to Pour the Concrete for the Mockup at the Same Temperature as is Expected for the Actual Pour

Resulting Recommendations Coordinate all Interested Parties, Particularly the Concrete Contractor and Steel Erector, Before the Production of Shop Drawings, to Ensure That All Parties Are Aware of Others’ Requirements for Construction so that Delays and Additional Costs Can be Avoided

Conclusions Use a 4D Model to Eliminate Problems That May Result Due to Confusion from the Construction Schedule, Sequencing, and Level of Detail Errors Reconsider the Concrete Mix Design, Formwork Type, and Placement Requirements of the Planetarium Architectural Concrete in Order to Achieve the Desired Finish

Questions?

Acoustical Breadth Planetarium Acoustical Analysis

Acoustical Analysis Owner’s Representative Had Concerns Regarding the Acoustical Quality of the Planetarium The Planetarium Space Itself The Effect of Mechanical Room Noise Adjacent to the Planetarium Space

Reverberation Time Performed on Planetarium Space Results Were Acceptable – Hz Acoustical Quality Was Much Poorer During Construction

STC Calculation Performed for the Mechanical Room Walls Result Was STC Rating of 42 – Acceptable Well-Constructed Insulated Walls