July 9-11 2014 LEReC Review 9 - 11July 2014 Low Energy RHIC electron Cooling Brian Sheehy Laser and Timing.

Slides:



Advertisements
Similar presentations
Photoinjector Lasers for Ultra-Bright Electron Sources
Advertisements

Overview of Low Energy RHIC e-Cooler (LEReC) project and needed RHIC upgrades Vladimir N. Litvinenko Department of Physics and Astronomy, Stony Brook.
1 “The Gatling Gun” A High Current Polarized Electron Gun System John Skaritka Collider-Accelerator Department Brookhaven National Laboratory.
June 28, 2012 Brian Sheehy Laser and Optical Issues in Gatling Gun Development Brian Sheehy June 28, 2012 I. Laser description for Phase I experiments.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
LEReC Laser Controls & RF Requirements Brian Sheehy 10/31/13 Laser timing Laser design RF and Control Needs.
Optimizing SHG Efficiency
1 Enhancements to the Linac Coherent Light Source.
1 Injector Lasers Overview Sasha Gilevich, SLAC April 29, 2004 Drive Laser Specifications Challenges System Description Laser Procurement R&D Effort UV.
ERHIC Main Linac Design E. Pozdeyev + eRHIC team BNL.
Bill White Drive Laser April 16, Drive Laser Commissioning Experience Reminder of requirements on Drive Laser.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
SLAC XFEL Short Bunch Measurement and Timing Workshop 1 Current status of the FERMI project (slides provided by Rene Bakker) Photoinjector laser system.
Simulation studies of the e-beams for Renkai Li and Juhao Wu 5/20/2014 ALD Review.
Siegfried Schreiber, DESY The TTF Laser System Laser Material Properties Conclusion? Issues on Longitudinal Photoinjector.
The ILC Laser-wire system Sudhir Dixit The John Adams Institute University of Oxford.
DMP Product Portfolio Femtosecond Lasers Trestles Ti:Sapphire lasers …… fs; nm, mW Mavericks Cr:Forsterite lasers
New Electron Beam Test Facility EBTF at Daresbury Laboratory B.L. Militsyn on behalf of the ASTeC team Accelerator Science and Technology Centre Science.
Summary of issues. RF-Gun cavity – Disk and washer (DAW) : very fast RF ageing, 2 MeV is not enough. – Quasi travelling wave side couple structure : Lower.
Low Emittance RF Gun Developments for PAL-XFEL
Compton/Linac based Polarized Positrons Source V. Yakimenko BNL IWLC2010, Geneva, October 18-22, 2010.
High Current Electron Source for Cooling Jefferson Lab Internal MEIC Accelerator Design Review January 17, 2014 Riad Suleiman.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Dmitry Kayran Beam commissioning.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
FLASH Operation at DESY From a Test Accelerator to a User Facility Michael Bieler FLASH Operation at DESY WAO2012, SLAC, Aug. 8, 2012.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
July LEReC Review July 2014 Low Energy RHIC electron Cooling (LEReC) Alexei Fedotov LEReC overview: project goal and cooling approach.
Beam Dynamics and FEL Simulations for FLASH Igor Zagorodnov and Martin Dohlus Beam Dynamics Meeting, DESY.
PULSE LASER WIRE Laser pulse storage in an optical cavity as a beam monitor & an X-ray source Kaori Takezawa Kyoto Univ. 2nd Mini-Workshop on Nano Project.
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
ERHIC design status V.Ptitsyn for the eRHIC design team.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Alex Zaltsman Power Amplifiers and LLRF.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Laser System Upgrade Overview
Laser system for ILC diagnostics Sudhir Dixit: The John Adams Institute (Oxford)
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
M. Hosaka a, M. Katoh b, C. Szwaj c, H. Zen b M. Adachi b, S. Bielawski c, C. Evain c M. Le Parquier c, Y. Takashima a,Y. Tanikawa b Y. Taira b, N. Yamamoto.
PAC07, Albuquerque, NM, June25-29, 2007 Fiber-Based Drive Laser Gain-switched seed ErYb-doped fiber amplifier Frequency-doubler 1560nm 780nm.
Bill White Commissioning October 9, 2006 Drive-Laser Commissioning Status and Plans Requirements Where do we stand today?
Electron Sources for ERLs – Requirements and First Ideas Andrew Burrill FLS 2012 “The workshop is intended to discuss technologies appropriate for a next.
Workshop for advanced THz and Compton X-ray generation
Drive Laser Introduction ‘ir’ master oscillator power amplifier chain (MOPA) uses standard chirped pulse amplification scheme (CPA) third harmonic generation.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Jorg Kewisch, Dmitri Kayran Electron Beam Transport and System specifications.
The Next Generation Light Source Test Facility at Daresbury Jim Clarke ASTeC, STFC Daresbury Laboratory Ultra Bright Electron Sources Workshop, Daresbury,
February 17-18, 2010 R&D ERL Brian Sheehy R&D ERL Laser and laser light transport Brian Sheehy February 17-18, 2010 Laser and Laser Light Transport.
Laser-Undulator Compact X-ray source (LUCX) POSIPOL2006 Workshop at CERN 1/23 Experimental Plan of X-ray Generation using Optical Resonator using Optical.
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
Sasha Gilevich, Alan Miahnahri Drive Laser 11/4/2004 Agenda General Information Project Status Transport Tubes Design.
J. Corlett. June 16, 2006 A Future Light Source for LBNL Facility Vision and R&D plan John Corlett ALS Scientific Advisory Committee Meeting June 16, 2006.
CLIC DB injector facility, photo-injector option studies LCWS, Granada, September 26 th -30 th,2011Steffen Döbert, BE-RF  CLIC DB injector  Thermionic.
F Sergei Nagaitsev (FNAL) Webex meeting Oct ICD-2 chopper requirements and proposal #1.
Free Electron Laser Studies
Status of the SPARC laser and “dazzler” experiments
Drive-Laser Commissioning Status and Plans
ILC/ATF-2 Laser System Sudhir Dixit (JAI, Oxford)
E- source R&D update ILC source laser project Faraday rotation experiment A. Brachmann 05/07/07 SLAC R&D meeting.
Drive laser specifications:
Tunable Electron Bunch Train Generation at Tsinghua University
PSB rf manipulations PSB cavities
Two color FEL experiment
Advanced Research Electron Accelerator Laboratory
Two-bunch self-seeding for narrow-bandwidth hard x-ray FELs
LASER SYSTEM STATUS G.Gatti , A. Ghigo , C.Vicario , P.Musumeci ,
Drive Laser Facility Layout Drive Laser Architecture Technical Issues
INJECTOR (WBS 1.2.1) Jym Clendenin, SLAC April 23, 2002
Drive laser specifications:
Drive Laser Commissioning Status
LCLS Injector Laser System Paul R. Bolton, SLAC April 24, 2002
Injector Drive Laser Technical Status
Presentation transcript:

July LEReC Review July 2014 Low Energy RHIC electron Cooling Brian Sheehy Laser and Timing

July Outline Scope High Level System Description Parameters Procurements Relocated equipment –used/borrowed/repurposed –Moved to make space Equipment installation location and conventional facilities requirements Timeline Summary 2

July Scope Provide laser pulses to the photocathode in the electron gun –synchronized with the 704 MHz accelerating RF –flexible macrobunch patterns tailored to complement ion bunch lengths and separations at different ion bunch energies (next slide). –Pulse width 50 psec FWHM, temporal shape TBD by beam dynamics simulations.  Flat top  Gaussian –Transverse shaping or truncated Gaussian spatial profile –Noise stabilization 3

July Scope: flexible timing, pulse pattern 1.42 nsec 30 electron bunches 120 ion bunches in the ring Overlap 30 e - bunches with each ion bunch e - bunch separation 1/ RF(gun)

July Scope: flexible timing, changing periods 5 Need to maintain synch between ions, electrons and accelerator RF over a range of orbital periods 9 MHz system tunes at 120 x  Harmonic number for MHz must vary Gun need only tune over a range of 

July High Level Systems Description 704 MHz fiber-coupled 1040 nm seed source, locked to RF –For temporal flat-top: mode-locked 10 psec FWHM –‘Gaussian’: electro-optically modulated CW laser Electro-optic modulation to select pulse pattern Multi-stage Yb-doped fiber & fiber rod amplifier Frequency-doubling to 520 nm in noncritically phase-matched Lithium triborate (LBO) crystal Temporal and transverse shaping –Pulse stacking for flat-top pulse 6

July System Description: seed source options 7 EOM 1 Amplifier chain Narrow bandwidth CW laser 100 MHz Pulser & PLL 9.1 MHz Pulser EOM 2 EOM = Electro-optic modulator PLL = phase-locked loop Fiber coupling 10 psec mode- locked laser & PLL (if flat top) ‘Gaussian’

July System Description, amplifier & doubling 8 A similar 150 Watt amplifier at Cornell (Zhao et al JOSA B 31, 33 (2014)

July Parameters 9 REQUIRED AT PHOTOCATHODE (GREEN): 1.6 MeV2 MeV gamma total charge per ion bunch QnC 3.0 # e- bunches/ion bunch 30.0 Q/ebunchpC laser pulse 1% QE nJ 23.8 ion bunch rep rateMHz average rep rateMHz average currentmA avg laser 1%QEW peak power 10 psec FWHMkW 2.4 peak power 50 psec FWHMkW 0.5 LaserIRGreen energy/pulsenJ average powerW pulse width (FWHM)ps flat top107(stack to 50 ) Gaussian7050 peak powerkW flat top5531 (4.4 after stacking) Gaussian M intensity noise (rms)%12 jitter wrt RF (rms)psec11 Assumes 40% conversion efficiency Plenty of overhead in power capability for shaping, transport, QE degradation.

July Procurements Laser Modulator and amplifier$240,000 Frequency Doubling module$20,000 Transport fibers$10,000 fiber launch system with stabilization feedback$10,000 transport and control optics$6,000 transport and control optomechanics$3,500 diagnostics: cameras & lenses$6,000 diagnostics: power meters$5,000 diagnostics: photodetectors$4,000 materials for pulse generators$20,000 10

July Relocated Equipment Laser room from Coherent electron cooling experiment will be used for LEReC laser room as well –Some reuse of transport path will also be possible Some reuse of existing 700 MHz laser system may be possible 11

July Location in LEReC 12 Laser Room Laser room location relative to the CeC experiment, also at 2 o’clock ~ 30 meter transport length

July Timeline Finalize pulse shape requirement: July 2014 Oscillator/modulator/preamp procurement December 2014 Amplifier design October 2014 Amplifier component procurement complete January 2015 Amplifier Construction complete March 2015 Operation for gun tests in bldg 912 Summer

July Summary Fiber rod based laser system with flexible pulse pattern 1 um fundamental, frequency doubled in LBO Fiber transport from 2 o’clock laser building to LEReC gun Available for gun tests in bldg 912 summer

July Backup

July Backup: parameters in upgrade case 16 REQUIRED AT PHOTOCATHODE (GREEN): 1.6 MeV2 MeV5 MeV gamma total charge per ion bunch QnC # e- bunches/ion bunch Q/ebunchpC laser pulse 1% QE nJ ion bunch rep rateMHz average rep rateMHz average currentmA avg laser 1%QEW peak power 10 psec FWHMkW peak power 50 psec FWHMkW LaserIRGreen energy/pulsenJ average powerW pulse width (FWHM)ps flat top107(stack to 50 ) Gaussian7050 peak powerkW flat top5531 (4.4 after stacking) Gaussian M intensity noise (rms)%12 jitter wrt RF (rms)psec11 Assumes 40% conversion efficiency Overhead of 5x or more in power capability