SUMMER 2015 DEFERRED MAINTENANCE MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT
MOLALLA HIGH SCHOOL HVAC REPAIRS 2015 REPLACED BELTS ON A/C UNIT 3 REPAIRED GYM UNIT COMPRESSOR REPAIRED COOLING TOWER PUMP REPAIRED GIRLS LOCKER ROOM UNIT ECONOMIZER REPLACED VARIABLE SPEED DRIVE IN A/C UNIT 1 REPLACED BELTS ON A/C UNITS 1 AND 2 REPLACED SHAFT ON A/C UNIT 2 REPLACED SUPPLY MOTOR FOR RTU 8 REPLACED RETURN MOTOR, BEARINGS, AND SHAFT FOR RTU 2 REPLACED COMPRESSOR ON DRY SYSTEM IN CANOPY AREA REPAIRED PUMP ON RTU 8
HIGH SCHOOL NEW STEAM OVEN AND FILTER SYSTEM
HIGH SCHOOL OLD BOOSTER HEATER AND NEW BOOSTER HEATER
NEW LED FIXTURES FOR STAFF/ATHLETIC PARKING LOT AT HS
MOLALLA ELEMENTARY CARPET
HALLWAY AND LIBRARY
POD AND HALLWAY
MES PAVING UPPER PARKING LOT AND WALKWAYS
SEALED BUS LANE AT MES
MIDDLE SCHOOL EIGHTH GRADE WING EXTERIOR BLINDS FOR TEMP. CONTROL
MIDDLE SCHOOL BOYS LOCKER ROOM PAINTING
MIDDLE SCHOOL GIRLS LOCKER ROOM BEFORE
AND AFTER
NEW SIDEWALK AT MULINO-AROUND THE FRONT TO THE WEST ENTRANCE
MULINO DRAINAGE WORK PREP
MULINO DRAINAGE WORK AFTER
RURAL DELL HALLWAYS PAINTING
NEW SINKS AND FAUCETS AT RURAL DELL
RURAL DELL LOCKER ROOM REMODEL FOR SUPPORTED ED CLASSROOM
ROOFING AT RURAL DELL
RURAL DELL AND CLARKES NEW PRESSURE TANKS
CLARKES BOILER TRANSFORMER BEFORE AND AFTER REPLACEMENT
New phone system handsets
Main server at district office and intercom speaker
Football field homecoming 2015