US 25 Corbin to London Citizens Advisory Committee Meeting December 2011.

Slides:



Advertisements
Similar presentations
U.S. Route 30 Environmental Impact Statement & Phase I Design Report Community Advisory Group Meeting Thursday May 8, 2008.
Advertisements

Oregon 62: I-5 to Dutton Rd. (Medford) Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
PUBLIC MEETING May 12, 2011 P U B L I C I N V O L V E M E N T Project Status PHASE III Construction PHASE II Contract Plan Preparation & Land Acquisition.
Great Western Corridor Feasibility Study
Tracy Lovell, PE A FOCUSED APPROACH TO SAFETY. Provide a Transportation System  Safe  Efficient  Environmentally Sound  Fiscally Responsible.
Alachua County BoCC Meeting November 8, Project Background and Location Study Purpose Study Activities Bridge Alternatives Evaluation Schedule.
New I-65 Interchange at Worthsville Road Welcome!.
U.S. 33 Northern Connector Alternative
US 25 Corbin to London Citizens Advisory Committee Meeting #2 March 2012.
From KY 89 at the northern city limits of McKee to the recently improved section of US 421 just north of the Jackson-Rockcastle County line. Six-Year Highway.
Environmental Assessment Public Meeting
Paula J. Trigg, County Engineer Public Works and Transportation Committee May 7, 2014 MODERNIZATION PROJECTS EXPANSION PROJECTS PROPOSED HIGHWAY.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
AGENDA  PROJECT HISTORY  NORTHERN SECTION UPDATE  SOUTHERN SECTION OVERVIEW  INTERCHANGES  PROJECT SCHEDULE  UPCOMING ACTIVITIES  OPEN DISCUSSION.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
S.R. 144 Intersection Improvement and Road Reconstruction Project Tuesday, October 11, :30pm Presentation Neil A. Armstrong Elementary School 1000.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
Old Policy – which no one ever seem to have heard of.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
County Reports Arizona Association of County Engineers June 2008.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
The purpose is to explore methods to improve the safety, capacity, and mobility of Falling Springs Boulevard, US 60, and adjoining roads.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
U.S. 31 at C.R. 400 South Intersection Improvement Clifty Creek Elementary School May 22, 2014, 6:00 p.m.
Rural Transportation Planning Eunice Fitzpatrick Transportation Planner Kentucky River ADD Hazard, KY.
S.R. 930 and Green Street Intersection Improvement Project Tuesday, May 22, :00 p.m. Presentation Park Hill Learning Center Auditorium New Haven,
Project Overview O CTOBER 27 TH, 2009 Presented to:
Anchorage Metropolitan Area Transportation Solutions Freight Advisory Committee (FAC) Freight and Land Use: Making the Connection December 15, 2010 Ms.
Orange County Traffic Signal System Consolidation of Services Study Commission Meeting September 8, 2005.
STA Safety Project PID #76439 December 12, 2006.
Fred Luna, SBCAG Paul Martinez, Caltrans District 5 April 3, 2013 SBCAG North County Subregional Committee State Route 246 Passing Lanes.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Phase I Engineering and Environmental Studies Project Development Flowchart US Route 45; IL Route 132 to IL Route 173 and Millburn Bypass CSS
Public Open House - July 10, 2007 WELCOME. Objective of Tonight’s Open House Provide background information on the project Introduce primary work elements.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
US 25 Corbin to London Citizens Advisory Committee Meeting #3 May 2012.
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Using GPS To Locate Collisions Lessons Learned Division of Traffic Accident Surveillance Section.
September 14, 2015 Transportation Board of Directors John M. Terry Assistant Director- Engineering SR-160 from SR-159 to Mountain Springs Phase 2 Final.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
How a Project Becomes a Project Michelle Ellias DOT SW Region Programming Engineer DNR/DOT Meeting December 4, 2012.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
Oregon’s All Roads Transportation Safety (ARTS) Program Zahidul Siddique, Ph.D., PE, PTOE Oregon Department of Transportation October 26, st International.
US Route 33 Access Management Study Purpose- Determine feasibility of converting US 33 from Hamilton Road in Franklin County to Carroll in Fairfield County.
Oregon Department of Transportation This program works with communities, law enforcement and internal ODOT partners regarding all aspects of transportation.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 6 October 6, 2015.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
PURPOSE & NEED Categorical Exclusion Training Class.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
INDOT Office of Traffic Safety Manager, Mike Holowaty
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
S.R. 30A / U.S. 98 / Panama City Beach Parkway
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Interlocal Cooperative Agreement FY 20
Presentation transcript:

US 25 Corbin to London Citizens Advisory Committee Meeting December 2011

Project Design Team Members David Fields – KYTC Project Manager – Manchester District Office Randy Gnau – Municipal Engineering Company Brad Gregory – Municipal Engineering Company Randall Thomas - HMB Professional Engineers

2006 Kentucky Transportation Cabinet Scoping Study  Highway Geometries  Type of Roadway Facility (Rural/Urban)  Vehicle Crash History  Traffic and Level of Service (Current & Future)  Resource Agencies  Environmental Concerns

Crash History  Between 1/1/01 to 12/31/05 – 809 Vehicle Crashes  208 Injuries & 9 Fatalities  46% of all Crashes Along the Route were Rear End  At 4 Spots the Rear End Crashes are 70% or Higher

Scoping Study Summary  Study Goals – To Develop a Purpose & Need Statement  “The primary goals of this project are to address highway capacity and growth needs in Laurel County, improve safety by providing an improved route that complies with current design standards, and provide an alternative route during incidents or closures on I-75.”

Scoping Study Project Recommendations  5 Separate Priority Improvement Recommendations  Focus on Recommendations 4 & 5  Expanding US 25 between US25E & KY 1006 (Levi Jackson Road)  Develop an Access Management Plan  Coordinate with London and Laurel County  Establish an Advisory Team

US 25 / 25E / 25W Intersection  In October 2007 a Phase I Engineering Study was Completed for this intersection by KYTC D-11  Several Intersection Configurations were evaluated  Lengthening Auxiliary Lanes  Adding Turn and Thru Lanes  Improving Radii  Adding Acceleration Lanes  All Configurations Still Produced a L.O.S. of “F”  Grade Separated Interchange Needed

Project Limits End Project Begin Project

Where Do We Go From Here?

Typical Project Development

Project Schedule & Funding  Current funding is for the Design Phase  Preliminary Engineering Complete – Fall 2012  Public Hearing – Summer 2013  Environmental Document Approval – Winter 2014  Detailed Engineering Design Begins on Preferred Alternate

Citizen Advisory Group We Want You!

Citizen Advisory Group  We need you to be our eyes and ears during this process  This Project is for the Citizens of Laurel County  This project needs to meet your needs and concerns

US 25 - Project Flow 1 st Citizen Advisory Group meeting 1 st Public Meeting 2 nd Citizen Advisory Group meeting 3 rd Citizen Advisory Group meeting 4 th Citizen Advisory Group meeting 2 nd Public Meeting 5 th Citizen Advisory Group meeting 6 th Citizen Advisory Group meeting Public Hearing

1 st Public Meeting 1 st Public Meeting  January/February  Open Format  Detailed Maps of the existing area  Fact Finding  We need your Help!

Thank You! Brad Gregory – Municipal Engineering Co David Fields – KY Transp0rtation Cabinet - Manchester