Internal Use Only / 12/2 08:34:29 P3F1 GRW102 breaker off: V:8.466755 A:8255.734 P:68.44KW V:328(Primary) A:267(Primary) GRW102A 08:34:29.

Slides:



Advertisements
Similar presentations
SYNCHRONOUS MACHINES.
Advertisements

HT/LT Substation at RBI, Bangalore
ELECTRICAL INSTALLATION PLANNING
IntegraPower Features and Models. L1L2L3 T1T2T3 RS-232 cable to PC TB1 connections: Remote ON/OFF Remote indicator light Y-  Control Bypass contactor.
T h e K i n e t i c T h e o r y. E x p l a i n s t h e e f f e c t s o f t e m p e r a t u r e a n d p r e s s u r e o n m a t t e r.
EXAMPLE 1 Relate side length and angle measure Draw an obtuse scalene triangle. Find the largest angle and longest side and mark them in red. Find the.
Lecture 26 Distribution Systems Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Lecture Notes 4 Per Unit System
QUALIFY FOR M D R T IS THE SHORTEST WAY TO BECOME.
Phase Difference = Phase Difference = 0.05.
Unit Transformer Unit transformer are step up transformer which is connected to generating house & step up voltage from 15kV voltage to 132 voltage level.
Unit 27 Three-Phase Circuits
EXAMPLE 1 Relate side length and angle measure Draw an obtuse scalene triangle. Find the largest angle and longest side and mark them in red. Find the.
Mrs. Rivas Practice 6-2 to 6-5 Worksheet. Mrs. Rivas.
Proving Triangles are Congruent (NOTES)
By A.D.Thirumoorthy Tamil Nadu Electricity Board India.
Power Plant Construction and QA/QC Section 7.4 – Hydroelectric Generators, Transformers and Controls Engineering Technology Division.
Antenna Electrical Infrastructure Selection of OMT Design for the EVLA X-band Receiver Bob Broilo Electrical Engineer.
UPS sizing rev Show information... Navigation links: Move the cursor across the links and wait for the “hand” symbol - then click left mouse key.
Verigy V93000 Service Training Appendix B Autotransformer E8005A.
6-5 Traits and Probability Punnett squares – a grid system for predicting all possible genotypes resulting from a genetic cross A Aa a Pg 183.
Lab 13 – Complex Power EE 188L. Instantaneous Power Time domain.
Sepam case studie EN 2007_01.ppt1 Installation single-line diagram G M Transformer 63KV / 6.3KV 10MVA Generator 2MVA 30A / 5s 6A continuous 1 CSH 30A /
EXAMPLE 1 Standardized Test Practice SOLUTION Let ( x 1, y 1 ) = ( –3, 5) and ( x 2, y 2 ) = ( 4, – 1 ). = (4 – (–3)) 2 + (– 1 – 5) 2 = = 85 (
1 / Internal Use Only  廠務系統狀態 : ( /05~03/06)  作業項目 :  Issue : 1. 台電歲修: 3/9( 六 ) 08:00~17:00. Facility Daily Report 03/06 * 相關廠務 Data 檔案: W:\
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
Electrical Engineering
1 / Internal Use Only  廠務系統狀態 : ( /25~08/27)  作業項目 : 1. 8/27 GRW102 、 202 電力移設至 P3F-1 Panel 2. 8/27 GRW202 、 204 變壓器對調電力結線  Issue : Facility.
1 Complex Algebra and Load Power EE341 Ali Keyhani Circuit Theory Lecture #3.
Hao Zhu Dept. of Electrical & Computer Engineering University of Illinois, Urbana-Champaign ECE 498HZ: Power Distribution System Analysis.
HIGH VOLTAGE UNION Vacuum Circuit Breaker 110 kV VRS-110 Series ВЫСОКОВОЛЬТНЫЙ СОЮЗ
Economic Comparison off Grid System. Q1 : Sizing of Solar Panel System Let us consider that one house needs following loads; 10W, 2 lamps for 3 hours.
1 主讲:郑萍 高级工程师, 执业药师 化学化工学院 2 液相色谱分析是在经典的液体柱色谱 基础上,引入了气相色谱的理论;在技 术上采用了高压泵、高效固定相和高灵 敏度检测器,实现了分析速度快、分离 效率高和操作自动化,这种柱色谱技术 被称做高效液相色谱法。
-Basic Circuits -Power Distribution -Fusing/Protection.
NEUTRAL CURRENT IS NOT ZERO
TR Red Rock Subtation 8P22 8P25 8P28 8P21 8P24 8P27 8P20 8P23 K5 345kV Bus 1 345kV Bus 2 PT 115kV 10/31/2005, At Red Rock Substation, the switching.
Corresponding Parts in Congruent Triangles. Corresponding sides and angles Corresponding AnglesCorresponding sides AB C R S T AB RS BC ST AC RT.
Hao Zhu Dept. of Electrical & Computer Engineering University of Illinois, Urbana-Champaign ECE 498HZ: Power Distribution System Analysis.
PMC-592 HMI's Front Panel Operation
The National Debt increases an average of $1. 85 billion per day
Module B4 Per Unit Analysis
Per-Unit System.
VH Series How to Compete Against…
Modeling.
Synchronising Controls Overview by Robert Breadon
Basic Logging for 90%+ of your needs!
METER SPECIFICATIONS.
پیگیری اپیدمی ابولا در غرب آفریقا تجربیات و عبرت ها
מיחזור במערכת החינוך.
GC setup. GC setup SPLIT Injections Split ratio 24:2 Split ratio 25:1 Split ratio 100:1 28 ml/min 2 ml/min 24 ml/min Split ratio 25:1 28 ml/min 2 ml/min.
Factor By Grouping GCF Factoring twice!.
Why does power factor matter Make-up of distribution capacitor banks
Exercise 8 Power systems.
Warm Up.
سامانه مدیریت آزمایشگاه‌های دانشگاه یزد
Electrocorder Power Loggers
Exercise 8 Power systems.
Exercise Session 3 Power systems.
Dynamic Response Unit step signal:
Acetylcholine, Run 17, 148->87 m/z
Warm up Are they congruent, if so, tell how AAS Not congruent
1st Quarter 2013 VRL Report Gentry Tubbs
Module B4 Per Unit Analysis
Warm up Are they congruent, if so, tell how AAS Not congruent
*** Series 3RS Version 1, ***
All about right triangles
Geometry Thurs. 9/25/14 Complete Warm-ups (See slide below)
BETONLINEBETONLINE A·+A·+
Perpendicularity of a Line & a Plane
ROCK STAR GUYS MEMBER CARD D.PACKIA VINSLIN KVA.
Presentation transcript:

Internal Use Only / 12/2 08:34:29 P3F1 GRW102 breaker off: V: A: P:68.44KW V:328(Primary) A:267(Primary) GRW102A 08:34:29

Internal Use Only / GRW205A 12/2 08:34:29 P3F1 V: A: P:59.43KW V:312.4(Primary) A:243.1(Primary) P:64.03(Primary) 08:34:29

Internal Use Only / 12/2 08:34:29 P3F2 V: A: P:30.05KW V:276(Primary) A:177(Primary) GRW101A 08:34:29

Internal Use Only / 12/2 08:34:29 P3F2 V: A: P:72.24KW V:359.1(Primary) A:242.3(Primary) P:69.21(Primary) GRW201A 08:34:29

Internal Use Only / GRW204A 12/2 08:34:29 P3F2 V: A: P:64.09KW V:342.2(Primary) A:230.8(Primary) P:66.15(Primary) 08:34:29

Internal Use Only / GRW209A 12/2 08:34:29 P3F3 V: A: P:56.123KW V:310.7(Primary) A:224.9(Primary) P:58(Primary) 08:34:29

Internal Use Only / P3F-4 NFB 600A Normal P3F-3 NFB 600A From TPC 22.8KV P3F-1 NFB 600A P3F-2 NFB 600A MGCB 22.8KV P3F-4 NFB 600A GCB2 22.8KV TR=750 KVA MPB 400V/1250A GCB2 22.8KV TR=350 KVA MLB 220V/1000A GCB3 22.8KV TR=750 KVA MRB 220V/2000A GCB1 22.8KV TR=2,000 KVA MPA 380V/3200A 202A NFB 400A 203A NFB 400A 101A201A NFB 400A 204A NFB 400A 102A NFB 400A (R/T) (R/S)(S/T) (R/S) (R/T) NFB 400A EP-2500* 1 EP-2700*1 EP-2500* 1 EP-2700*1 EP-2500* 1 205A (R/T) 206A (R/S) 207A (S/T) 209A (R/T)

Internal Use Only / 08:34:29 P3F1 V: A: P:68.44KW V:328(Primary) A:267(Primary) GRW102 P3F1 V: A: P:59.43KW V:312.4(Primary) A:243.1(Primary) P:64.03(Primary) GRW205 P3F3 V: A: P:56.123KW V:310.7(Primary) A:224.9(Primary) P:58(Primary) GRW209 P3F2 V: A: P:30.05KW V:276(Primary) A:177(Primary) GRW101 GRW201 P3F2 V: A: P:72.24KW V:359.1(Primary) A:242.3(Primary) P:69.21(Primary) P3F2 V: A: P:64.09KW V:342.2(Primary) A:230.8(Primary) P:66.15(Primary) GRW204

Internal Use Only / R T S 30% S Phase 22.8KV*15=342KVA S phase /380=900A S phase peak30% KV*21=478.8KVA S phase peak 30% /380=1260A =360A