The Republic of the Union of Myanmar Ministry of Electric Power

Slides:



Advertisements
Similar presentations
Ministry of Electricity and Energy General Authority for Rural Electricity Rural Energy Access Project OFF GRID RURAL ELECTRIFICATION Summary of The Project.
Advertisements

National Electrification Planning for Myanmar (NEP):
Project ideas for Mozambique Country Context Project 1. Integrated project of electrification using low cost technologies for rural villages and biomass.
1 SINGLE-PHASE METALLIC RETURN TECHNIQUE Presented by Moncef AISSA Senior Engineer STEG-Tunisia March 7, 2006 contributors - E. Cecelsky - A. Ounalli -
Cambodian Energy Sector Development Ministry of Industry, Mines and Energy Vietnam, Ho Chi Minh, 11 November, 2011 Greater Mekong Subregion Fifth Meeting.
Outline of JICA’s Assistance prepared for
Rural Electricity Access by MOLFRD
6 -19 Nov Ministry of Industry Electricity of Vietnam Institute of Energy Participant To Thi NGOC Nov KOICA – Follow- Up Workshop in.
A Bridge to Universal Energy Access
Rural Electrification Institutional Experience: Case of TUNISIA Ahmed Ounalli(*) Director, Strategic Studies Group-STEG Energy Week at the World Bank 6-9.
Policies.
The Ukrainian Municipal Credit Market Development V.G. Кozyr Executive Director of the Ukrainian Municipal Development Fund.
Implementation Road Map for National Electrification Program Draft Final Recommendations Alex Sundakov, September 2014.
1 ALLOCATIONS for the Integrated National Electrification Programme 2009/10 Presentation to the Select Committee on Finance 25 February 2009.
Myanmar: Towards Universal Access to Electricity by 2030 Nay Pyi Taw, January 28, 2015.
Rural Electrification Access by Department of Rural Development
Budget Financing in Myanmar Daw Ni Ni Than Director Treasury Department.
A Nation of Cities. Evolution of the US Economy Transition.
SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM UNDER NESCO.
MiniGrid Group NEP Off Grid Electrification Breakout session.
Presented By: Dr. Thi Thi Soe Deputy Director
WELCOME 1.
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Kayah State Office Priorities and Detailed Description of.
Solar PV Tender Overview Ministry of Livestock, Fisheries and Rural Development Department of Rural Development Place - Sule Shangri-La Hotel Date- 4 -
A PRESENTATION OF PRACTICAL TRAINING ON “400KV GSS “ \
The Republic of the Union of Myanmar Ministry of Electric Power
1 Manufacturer’s Outreach Workshop, Thingaha Hotel, Naypyitaw Myanmar. October
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Ayeyarwady Region Office Priorities and Detailed Description.
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Mandalay Region Office Priorities and Detailed Description.
PROCUREMENT UNDER THE PROJECT National Electrification Project.
Submitted To:- Submitted By:- Mr.
Myanmar: Toward Universal Access to Electricity by Role of Minihydro Xiaoping Wang Senior Energy Specialist World Bank July 30, 2015.
A PRESENTATION On 400KV GSS SURPURA JODHPUR
Performance of the Integrated National Electrification Programme as at 30 June 2008 (4 rd Quarter) Presentation to the Select Committee on Finance 14 August.
Current status & future plans for power system development U Moe Thet, Deputy Chief Engineer Power System Department Myanma Electric Power Enterprise.
This project on Primary sub station of Visakhapatnam port trust at Visakhapatnam. It is 132kv/11kv substation with incoming feeder from APTransco and 11.
Economic Comparison off Grid System. Q1 : Sizing of Solar Panel System Let us consider that one house needs following loads; 10W, 2 lamps for 3 hours.
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Rakhine State Office Priorities and Detailed Description.
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Kayin State Office Priorities and Detailed Desription of.
How IT Transition can feed green growth and energy transition through innovation 25th MAY, 2016 Masaaki Yamamoto New Energy and Industrial Technology Development.
Date - Lieu Introductory Presentation GRET-Chin MFI.
Permanent Solutions to Temporary Loads: An Alternate Approach to Electrical System Design for Short Term and Mobile Industrial Loading Presented by: Eli.
Current Electrified Villages Sagaing Region Townships - 11 Villages - 91 Households Kayin State Townships - 5 Villages Households
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Eastern Shan State Office Priorities and Detailed Description.
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Magway Region Office Priorities and Detailed Description.
Communications channels, tools and methodologies
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
The Republic of the Union of Myanmar Ministry of Electric Power
National Training Programme For C&D Employees (Variant 3-Financial Management ,Store Accounting and Office Admininstration) )
The Republic of the Union of Myanmar Ministry of Electric Power
SUB-STATIONS.
The Republic of the Union of Myanmar Ministry of Electric Power
Off-grid Electrification Department of Rural Development
The Republic of the Union of Myanmar Ministry of Electric Power
Basics of electrical engineering
Figure 1: Administrative Structure of the Czech Republic
AGRICULTURAL COOPERATIVES ACTIVITIES IN MYANMAR
Planning and implementation of Energy efficiency
ESKOM RURAL ELECTRIFICATION EXPERIENCES - LESSONS LEARNT -
The Republic of the Union of Myanmar Ministry of Electric Power
BY Presenter Name: G.V,Reddy DESIGNATION: Sr. General Manager
Installation And Estimation of Service Connection
Yangon Region Rural electrification plan
The Republic of the Union of Myanmar Ministry of Electric Power
The Republic of the Union of Myanmar Ministry of Electric Power
Building Viable African Electricity Networks
Presentation Plan Overview of Kazakhstan’s small business sector
Overview of Electrification Options
Puerto Rico Electric System Challenges Ahead
Presentation transcript:

The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Chin State Office Priorities and Detailed Description of Electrification Plan For Chin State Dated -21.Oct.2015

Electrification Plan after discussion with local goverment We have submitted to the local government for implementation the the NEP with World Bank Loan that we have planned for priority to the villages lists within 2 miles from existing 11 kV lines. Then we have got the message to cooperate with township management committee. Therefore, we have to coordinate with township management committee and village lighting committee for electrification the villages within 2 miles from existing 11 kV lines.

Electricfication Plan for Village of Chin State To be Constructed 11 kV Distribution Line 8 miles 400 V Distribution Line 2.5 miles 11/0.4 kV Distribution Transformer 4 Nos Electricfication Plan for Village of Chin State (Within 2 miles from Exiting 11 kV Distribution Line) Falam District No. of Village - 1 Nos Household - 72 Estimated Cost - 70.58 (Mil kyats) Mindat District No. of Village - 3 Nos Household - 109 Estimated Cost - 207.09 Chin State No. of Village - 4 Nos Household - 181 Estimated Cost - 277.67 (To Kalay) (Cikhar) (Tonzang) (Teedim) (Falam) (Hakha) (Rih Khawdar) (Thanthlang) (Rezuar) (Matupi) (Mindat) (Paletwa) (Sami) (Kanpetlet) (To Saw ) (To Kyauhtoo) (To Gangaw) (To Natchaung)

Detailed Electrification Plan for Chin State (Within 2 miles from Existing 11 kV Distribution Line)   No Districk No of House House hold Popu- lation To be constructed Estimated cost (Mil Kyates) Task by regional Cost for 11 kV Line 11/0.4 kV Transformer 400V Lines (Miles) Estimated Cost (Mil Kyats) mile Material Cost Transport Cost Constr-uction Total kVA Material Trans-port Constru-ction 1. Falam 64 72 311 2 47.82 7.66 2.6 58.08 100 1 11.35 0.80 0.35 12.50 70.58 44.89 Mindat 109 490 6 143.46 22.98 7.8 174.24 150 3 29.4 2.4 1.05 32.85 207.09 1.5 67.335 173 181 801 8 191.28 30.64 10.4 232.32 250 4 40.75 3.2 1.4 45.35 277.67 2.5 112.225

Detailed Electrification Plan for Falam District (Within 2 miles from Existing 11 kV Distribution Line)   No Township Name of Village To be Electrified No of House House hold Popu- lation To be constructed Estimated cost (Mil Kyates) Task by regional Cost for 11 kV Line 11/0.4 kV Transformer 400V Lines (Miles) Estimated Cost (Mil Kyats) mile Material Cost Transp- Ort Cost Constr-uction Total kVA Mate-rials Trans-port 1. Falam La thi 64 72 311 2 47.82 7.66 2.6 58.08 100 1 11.35 0.80 0.35 12.50 70.58 44.89

Location Map of Electrification Plan for Falam District (Within 2 miles from Existing 11 kV Distribution Line) La thi Village 11/0.4 kV(100 kVA) Parte Village Ngasit vaa mini Hydropower (500kVA) 2 miles Legend Ngasit vaa mini Hydropower (500kVA) 11 kV Line 11 kV Line (2 Mile) 11/0.4 kV TR (100 kVA) Legend

Detailed Electrification Plan for Mindat District (Within 2 miles from Existing 11 kV Distribution Line)   No Town ship Name of Village To be Electrified No of House House hold Popu lation To be constructed Estimated cost (Mil Kyates) Task by regional Cost for 11 kV Line 11/0.4 kV Transformer 400V Lines (Miles) Estimated Cost (Mil Kyats) mile Mater-ials Cost Trans- port Construc-tion Cost Total kVA Materials Transport Constru-ction 1. Mindat Kyawl Taw 24 122 2 47.82 7.66 2.6 58.08 50 1 9.80 0.80 0.35 10.95 69.03 0.5 22.445 Baw(3) 20 125 Pye 65 243 109 490 6 143.46 22.98 7.8 174.24 150 3 29.4 2.4 1.05 32.85 207.09 1.5 67.335

Location Map of Electrification Plan for Mindat District (Within 2 miles from Existing 11 kV Distribution Line) Pye Village 11/0.4 kV( 50 kVA) Kyaw Taw Village 11/0.4 kV( 50kVA) Baw (3) Village 2 miles Legend 11 kV Line 11 kV Line 6 Miles 11/0.4 kV TR ; 150 kVA

Electrified Connection The Statement of Fiscal Yearly Budget and Electrified Connection for Chin State No Fiscal Year State/Region Capital Budget for ESE (mil Kyats) Capital Budget for DRD (mil Kyats) Electrified Connection ON Grid Off Grid Total Cost For 11 kV Line & 11/0.4 TR TotalCost for 400 V Line Total Village (Nos) Consumer 1 2014-2015 Estimate (RE+BE) 147.51 62.05 209.56 1149.96 4 344 68 6225 2 2015-2016 Estimate (RE+BE) 275.59 98.65 374.25 430.40 5 152 79 2139 3 2016-2017 Budget Estimate (RE+BE) 1970.53 509.77 2480.3 2977.20 17 1334 516 14886 Grand Total 1699.03 665.19 2364.23 4557.56 26 1830 663 23250

Main Materials List Transported to Falam District Office Sr No Description Quantities Transported Site 1 11/0.4 kV ,100 kVA Transformer 1 No Falam District , PMO Office 2 10 meter Iron Pole 95 Nos 3 ACSR 95/15 mm-sq 3863 kgs 4 11 kV Pin Insulator with Sindle 285 Nos 5 11 kV Disc Insulator with fiting Clamp 60 Sets 6 Surge Arrestor , Disconnection Switch , Fuse 1 Sets 7 Other Material 1 Lot

Main Materials List Transported to Mindat District Office Sr No Description Quantities Transported Site 1 11/0.4 kV ,50 kVA Transformer 3 Nos Mindat District , PMO Office 2 10 meter Iron Pole 285 Nos 3 ACSR 95/15 mm-sq 11590 kgs 4 11 kV Pin Insulator with Sindle 855 Nos 5 11 kV Disc Insulator with fiting Clamp 174 Sets 6 Surge Arrestor , Disconnection Switch , Fuse 3 Sets 7 Other Material 1 Lot

THANK YOU