Electrification Plan after discussion with local goverment We have submitted to the local government for implementation the the NEP with World Bank Loan that we have planned for priority to the villages lists within 2 miles from existing 11 kV lines. Then we have got the message to cooperate with township management committee. Therefore, we have to coordinate with township management committee and village lighting committee for electrification the villages within 2 miles from existing 11 kV lines.
Electricfication Plan for Village of Chin State To be Constructed 11 kV Distribution Line 8 miles 400 V Distribution Line 2.5 miles 11/0.4 kV Distribution Transformer 4 Nos Electricfication Plan for Village of Chin State (Within 2 miles from Exiting 11 kV Distribution Line) Falam District No. of Village - 1 Nos Household - 72 Estimated Cost - 70.58 (Mil kyats) Mindat District No. of Village - 3 Nos Household - 109 Estimated Cost - 207.09 Chin State No. of Village - 4 Nos Household - 181 Estimated Cost - 277.67 (To Kalay) (Cikhar) (Tonzang) (Teedim) (Falam) (Hakha) (Rih Khawdar) (Thanthlang) (Rezuar) (Matupi) (Mindat) (Paletwa) (Sami) (Kanpetlet) (To Saw ) (To Kyauhtoo) (To Gangaw) (To Natchaung)
Detailed Electrification Plan for Chin State (Within 2 miles from Existing 11 kV Distribution Line) No Districk No of House House hold Popu- lation To be constructed Estimated cost (Mil Kyates) Task by regional Cost for 11 kV Line 11/0.4 kV Transformer 400V Lines (Miles) Estimated Cost (Mil Kyats) mile Material Cost Transport Cost Constr-uction Total kVA Material Trans-port Constru-ction 1. Falam 64 72 311 2 47.82 7.66 2.6 58.08 100 1 11.35 0.80 0.35 12.50 70.58 44.89 Mindat 109 490 6 143.46 22.98 7.8 174.24 150 3 29.4 2.4 1.05 32.85 207.09 1.5 67.335 173 181 801 8 191.28 30.64 10.4 232.32 250 4 40.75 3.2 1.4 45.35 277.67 2.5 112.225
Detailed Electrification Plan for Falam District (Within 2 miles from Existing 11 kV Distribution Line) No Township Name of Village To be Electrified No of House House hold Popu- lation To be constructed Estimated cost (Mil Kyates) Task by regional Cost for 11 kV Line 11/0.4 kV Transformer 400V Lines (Miles) Estimated Cost (Mil Kyats) mile Material Cost Transp- Ort Cost Constr-uction Total kVA Mate-rials Trans-port 1. Falam La thi 64 72 311 2 47.82 7.66 2.6 58.08 100 1 11.35 0.80 0.35 12.50 70.58 44.89
Location Map of Electrification Plan for Falam District (Within 2 miles from Existing 11 kV Distribution Line) La thi Village 11/0.4 kV(100 kVA) Parte Village Ngasit vaa mini Hydropower (500kVA) 2 miles Legend Ngasit vaa mini Hydropower (500kVA) 11 kV Line 11 kV Line (2 Mile) 11/0.4 kV TR (100 kVA) Legend
Detailed Electrification Plan for Mindat District (Within 2 miles from Existing 11 kV Distribution Line) No Town ship Name of Village To be Electrified No of House House hold Popu lation To be constructed Estimated cost (Mil Kyates) Task by regional Cost for 11 kV Line 11/0.4 kV Transformer 400V Lines (Miles) Estimated Cost (Mil Kyats) mile Mater-ials Cost Trans- port Construc-tion Cost Total kVA Materials Transport Constru-ction 1. Mindat Kyawl Taw 24 122 2 47.82 7.66 2.6 58.08 50 1 9.80 0.80 0.35 10.95 69.03 0.5 22.445 Baw(3) 20 125 Pye 65 243 109 490 6 143.46 22.98 7.8 174.24 150 3 29.4 2.4 1.05 32.85 207.09 1.5 67.335
Location Map of Electrification Plan for Mindat District (Within 2 miles from Existing 11 kV Distribution Line) Pye Village 11/0.4 kV( 50 kVA) Kyaw Taw Village 11/0.4 kV( 50kVA) Baw (3) Village 2 miles Legend 11 kV Line 11 kV Line 6 Miles 11/0.4 kV TR ; 150 kVA
Electrified Connection The Statement of Fiscal Yearly Budget and Electrified Connection for Chin State No Fiscal Year State/Region Capital Budget for ESE (mil Kyats) Capital Budget for DRD (mil Kyats) Electrified Connection ON Grid Off Grid Total Cost For 11 kV Line & 11/0.4 TR TotalCost for 400 V Line Total Village (Nos) Consumer 1 2014-2015 Estimate (RE+BE) 147.51 62.05 209.56 1149.96 4 344 68 6225 2 2015-2016 Estimate (RE+BE) 275.59 98.65 374.25 430.40 5 152 79 2139 3 2016-2017 Budget Estimate (RE+BE) 1970.53 509.77 2480.3 2977.20 17 1334 516 14886 Grand Total 1699.03 665.19 2364.23 4557.56 26 1830 663 23250
Main Materials List Transported to Falam District Office Sr No Description Quantities Transported Site 1 11/0.4 kV ,100 kVA Transformer 1 No Falam District , PMO Office 2 10 meter Iron Pole 95 Nos 3 ACSR 95/15 mm-sq 3863 kgs 4 11 kV Pin Insulator with Sindle 285 Nos 5 11 kV Disc Insulator with fiting Clamp 60 Sets 6 Surge Arrestor , Disconnection Switch , Fuse 1 Sets 7 Other Material 1 Lot
Main Materials List Transported to Mindat District Office Sr No Description Quantities Transported Site 1 11/0.4 kV ,50 kVA Transformer 3 Nos Mindat District , PMO Office 2 10 meter Iron Pole 285 Nos 3 ACSR 95/15 mm-sq 11590 kgs 4 11 kV Pin Insulator with Sindle 855 Nos 5 11 kV Disc Insulator with fiting Clamp 174 Sets 6 Surge Arrestor , Disconnection Switch , Fuse 3 Sets 7 Other Material 1 Lot