APS Ten-Year Plans th BTA Presentation

Slides:



Advertisements
Similar presentations
APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.
Advertisements

WECC TEPPC Meeting SWAT Update
WECC TEPPC Meeting SWAT Update
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
Arizona Corporation Commission 2008 Biennial Transmission Assessment Workshop I CATS-EHV 2007 Studies Ten Year Snapshot and N-1-1 Jose Silva Salt River.
Arizona Corporation Commission Workshop
Status of Arizona Coordinated Resource Management Efforts.
 2005 Pinnacle West Capital Corporation Palo Verde Hub Participant Meeting May 27, 2005 Arizona Public Service Company Tom Glock – Manager Power Operations.
Special Open Meeting of the Arizona Corporation Commission Energy Workshop February 16, 2001 Arizona Public Service Company Cary B. Deise Director, Transmission.
2/16/2001ACC Energy Workshop – Summer Preparedness 2001 and SS-1 SRP Summer Preparedness 2001 and 2002 Presented to the Arizona Corporation.
1 The ABC’s of Water in Arizona A general understanding of water and the Hydrologic Cycle is necessary to have basis for unlocking more complex topics.
Arizona. Facts About Arizona Arizona's the sixth-largest state in the country covering, 114,006 square miles. Arizona's also is one of the Southwestern.
Coalition Survey Analysis July 18, CountyNumber Greenlee County13 Graham County14 Gila County15 Santa Cruz County16 Apache County17 Navajo County17.
Arizona Transmission System Overview November 18, 2014 Tribal Solar Working Group 1.
APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.
Colorado Plateau - Geography Arizona Geography GCU 221.
2006 BTA 8/5/ SSC-1 ACC BTA Requirements SRP’s Ten Year Plan Presentation Chuck Russell Salt River Project June 6, 2006 Phoenix, Arizona Arizona.
APS Deer Valley Facility Phoenix, Arizona June 18, AM -12 PM
Adding to the Fleet Ensuring SRP’s Long Term Generation Reliability May Millies, Manager - Power Generation Services.
Arizona Corporation Commission 2010 Biennial Transmission Assessment Workshop June 3 & 4, 2010 Brian K. Keel Manager, Transmission System Planning Salt.
Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos BTA Workshop May
1 STEP Southwest Transmission Expansion Plan. 2 Southwest Transmission Expansion Plan (STEP) Subregional planning group formed in November of 2002 Coordinates.
Kinder Morgan Silver Canyon Pipeline Kinder Morgan Silver Canyon Pipeline Business Overview ACC Workshop NOI February 13, 2004.
5/23/08ACC 5 th BTA Workshop – Phoenix - SWAT – RE Kondziolka 1 SWAT Subregional Planning Group Update Arizona Corporation Commission Fifth Biennial Transmission.
Virtual Tour March PHOENIX ACTIVE MANAGEMENT AREA ~~ Virtual Tour ~~ arizona department of water resources – phoenix ama Physical SettingPhysical.
 2005 Pinnacle West Capital Corporation Special Open Meeting of the Arizona Corporation Commission 2005 Summer Assessment March 18, 2005 Arizona Public.
Successful Transmission Planning & Development in the West Kelly Barr Manager, Regulatory Affairs & Contracts Salt River Project Phoenix, Arizona June.
Warm-Up Mon, Aug 17 Draw the Arizona flag in the output section of your interactive notebook. Try to figure out what each symbol/color on the flag means.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
Arizona By T. Csatlos. State Capitol Phoenix America’s fifth-largest city still has real cowboys and rugged mountains and the kind of cactus most people.
2009 SOUTHEAST ARIZONA TRANSMISSION SYSTEM STUDY REPORT 6 th BTA Workshop Carnegie Library, Phoenix, AZ By TEP on behalf of SATS Participants June 3-4,
APS Ten-Year Plans th BTA Presentation John Lucas Manager Transmission Planning May 22, 2008.
BTA Workshop May 22, 2008 Ten-Year Transmission Plan for the Santa Cruz Water & Power Districts Association (“Santa Cruz”) 10/26/2015K.R. Saline & Assoicates,
Arizona Corporation Commission Energy Workshop February 16, 2001.
APS Overview Richard Nicosia. APS Snapshot Largest and longest serving electric utility Operations dating back to th largest employer headquartered.
03/22/07 ACC Open MeetingSummer Preparedness SRP Summer Preparedness 2007 Mike Hummel Manager – Supply & Trading and Gary Harper Manager - System.
Arizona Corporation Commission Power Plant & Transmission Siting Summary ACC Staff Presentation October 30,
The Big Picture Cover Arizona April 15, Gains In Coverage Nationally Q1 2014Q3 2014Q Number gained coverage since baseline (Q Q3 2013)
Arizona Phoenix Grand Canyon State. Jan Brewer God Enriches (Ditat Deus)
1 Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos ACC Meeting Oct
ACC Summer Preparedness Hearing Tucson Electric Power & UNS Electric March 22, 2007 Ed Beck Superintendent Transmission & Distribution Planning.
Reliability Must-Run Analysis 2006 – th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
12/15/ SS-1 Arizona Corporation Commission Special Open Meeting Gary Harper Manager, System Operations July 23, 2004 Phoenix, Arizona.
APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 SRP Attachment K APS Attachment E SRP Facility – Scottsdale, AZ December 15 th, 2015.
Dynamic Signal Workshop January 14, 2016 APA Office Phoenix, Arizona 1.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
SDG&E Transmission Improvements Jim Avery Chief Development Officer.
Arizona Chapter 2 Frameworks Powerpoint Travel Destinations 4th hour S. Ashby.
N-1-1 Contingency Analysis & Relay Protection 4 th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006.
GLG 103 Lab 11 Geology of Arizona. Arizona’s Physiography.
Arizona Extreme Contingency Analysis 2009 & th BTA Presentation Jonathan Stahlhut, Ph.D. Transmission Planning Engineer, APS May 22-23, 2008.
3/18/ FUTURE LINES EXISTING LINES FUTURE 500kV SUBSTATIONEXISTING 500kV SUBSTATION ATTACHMENT A SALT RIVER PROJECT 500kV SYSTEM January 23,
APA Customer Bubble Charts Work in Progress Updated January 25, 2016 (a.m.) (Contact: John Underhill ) 1.
TEP RMR Workshop Presentation1 Workshop on ACC RMR study submitted with 2004 ten year plan Tucson Electric Power January 15, 2004 Ed Beck Supervisor Transmission.
APS/SRP 2 nd Quarter Stakeholder FERC Order 890 APS Attachment E SRP Attachment K APS Deer Valley Facility Phoenix, Arizona June 21, AM -12 PM.
Navajo Transmission System
APS Deer Valley Facility Phoenix, Arizona June 22, AM -12 PM
Assistant Governors.
APS Resource Management February 10, 2017
Status of Arizona Coordinated Resource Management Efforts
Arizona State song: The Arizona March Song State flower: Saguaro
Deliverability Maps for 2017 Peaking Capacity RFP
Arizona Geography GCU 221.
ColumbiaGrid Planning Meeting FERC Order 1000 Activities June 7, 2018
Date 5 November 2017, afternoon, Nor West wind direction,
MANAGED AQUIFER RECHARGE FOR THE ARIZONA DESERT:
Arizona Map Activity.
Nogales DC Tie Capacity
READ 180 Update Mid-Year
Presentation transcript:

APS Ten-Year Plans 2006-2015 4th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006

APS EHV & OUTER DIVISION 115/230 KV TRANSMISSION PLANS 2006 - 2015 PAGE TO NAVAJO CRYSTAL FOUR CORNERS 500KV J/O 5 K V MOENKOPI TO CALIF. 345KV TO MEAD / To GLEN MARKETPLACE 500KV J/O SELIGMAN CANYON (WAPA) FLAGSTAFF COCONINO ROUND VALLEY YAVAPAI VERDE 2 circuits FLAGSTAFF (APS) 2009 230KV FLAGSTAFF BAGDAD WILLOW (WAPA) CHOLLA LAKE ) SECOND KNOLL 2009 ( A S R ( A P P ) CORONADO PRESCOTT W A W P A ( ) VV1 2009 PREACHER RACEWAY 2010 GAVILAN 2012 PEAK CANYON 2009 TS5 WEST 2012 MAZATZAL O WING 5 K V J / PHOENIX PINNACLE PALO VERDE- PEAK HASSAYAMPA LIBERTY LIBERTY 2012 J/O RUDD KYRENE JOJOBA KNOX 500KV REDHAWK DESERT J/O T GILA RIVER/ B D BASIN TO CALIF. CASA 500KV N.GILA PANDA GRANDE GILA BEND SANTA T B D YUMA ROSA SAGUARO TAT MOMOLI ORACLE SAN MANUEL YUCCA JUNCTION LEGEND EXISTING 500 KV LINES TUCSON ADAMS EXISTING 345 KV LINES EXISTING 230 KV LINES POWER PLANT EXISTING 115 KV LINES PLANNED 500KV LINES NUCLEAR POWER PLANT MURAL PLANNED 345KV LINES PLANNED 230KV LINES PLANNED 115KV LINES 115KV & ABOVE SUBSTATION (EXISTING) NORTH 12/1/05 June 6, 2006 4th BTA 230KV & ABOVE SUBSTATION (FUTURE) Transmission Planning J/O JOINT OWNSHIP Substation locations and line routings depict an electrical connection only and do not reflect any assumed physical locations or routing.

PHOENIX METROPOLITAN AREA TRANSMISSION PLANS 2006-2015 To Navajo 2006-2015 To New To Prescott Waddell Raceway GAVILAN PEAK 500KV 2010 AVERY 2009 CAREFREE HWY. TBD 2010 TS6 W . A D P R TO 2010 500kv (SRP) TBD A GLEN J/O M A I CANYON P (WAPA) TO A CHOLLA A P W 345KV 2010 2 - Circuits 2 - Circuits TS1 2009 TS5 TBD J/O 2010 2011 TS2 TBD TO SRP W Y . SRP PALO WESTWING F PINNACLE PEAK VERDE 1 7 REACH - I TO PALO VERDE SURPRISE TBD DEER LONE PEAK VALLEY BELL RD. J/O APS/SRP CACTUS D . R EL SOL AGUA D ALEXANDER SUNNYSLOPE L FRIA E F I GLENDALE . W Y H C 1 7 F T I - L I BETHANY HOME RD. MCDONALD RD. WHITE TANKS 2007 PALM VALLEY MEADOWBROOK (APS) BUCKEYE I - 10 FWY. COUNTRY CLUB W A P A LIBERTY/TS4 LINCOLN ST. RUDD WEST PHOENIX I - 10 FWY. OCOTILLO TO PALO VERDE 500KV SUPERSTITION FWY. . BASELINE RD.. W Y KYRENE F KNOX TO BROWNING BASELINE RD.. APS EXISTING 500KV LINES 230KV SUBSTATION (EXISTING) 1 - (SRP) 500kV APS EXISTING 345KV LINES I APS EXISTING 230KV LINES 230KV SUBSTATION (FUTURE) TO UNDERGROUND 500kV GENERATING SITE & GILA BEND APS PLANNED LINES 230KV SUBSTATION TO JOJOBA 230KV JOINT OWNSHIP J/O Transmission Planning June 6, 2006 4th BTA OTHER COMPANY LINES TO SANTA ROSA Substations locations and line routings are approximate 500KV 345KV

Changes from 2004 to 2006 Project Status 2005 Gavilan Peak 230kV Completed TS3 230/69kV substation Named Palm Valley 2006 Rudd-Palm Valley-TS4 230kV Changed to I/S date of 2007 2006 Flagstaff 345/69kV interconnection Changed to I/S date of 2009 2006 Jojoba cut-in of TS4-Panda 230kV Changed to I/S date of 2011 South East Valley 500kV project - Hassayampa-Pinal West & Pinal West-Santa Rosa-Browning Removed from APS plan - APS no longer participating 2007 PV Hub-TS5 500kV Changed to I/S date of 2009 and added interconnection options (AVGS & HQJNT) June 6, 2006 4th BTA

Changes from 2004 to 2006 Project Status 2007 TS5-TS1 230kV Changed to I/S date of 2009 2008 TS1-TS2-Palm Valley 230kV w/TS2 I/S of 2012 Changed to I/S date of 2010 w/TS2 I/S date of 2011 2008 RY-AV 230kV 2009 PP-TS6-AV 230kV 2009 Second Knoll 500/69kV Interconnect moved from CO-SK line to CO-CH line 2010 TS5-RY 500kV Changed to I/S date of 2012 2010 WW-RY 230kV Changed to I/S date of TBD 2012 Gila Bend-TS8 230kV Replaced with PV Hub-N.G. 500kV June 6, 2006 4th BTA

Changes from 2004 to 2006 Project Status 2013 WW-ES 230kV Changed to I/S date of TBD TBD Mazatzal 345/69kV Changed to I/S date of 2011 2009 VV1 500/69kV New Project 2010 TS9-PP 500kV 2012 N.G.-TS8 230kV TBD Yucca-TS8 230kV TBD SR-Pinal South 230kV June 6, 2006 4th BTA

Conceptual Projects TransWest Express Transmission from Wyoming to Arizona and/or southern Nevada Access coal and wind resources in Wyoming Three AC alternatives Looking at 500kV and 765kV options One DC alternative Developing through open stakeholder process Compliments other planned projects Cost range $2B-$5B June 6, 2006 4th BTA

Conceptual Projects: TransWest Express Project June 6, 2006 4th BTA

Conceptual Projects 230kV west of White Tank Mountains Large developments planned for the area immediately to the west of the White Tank Mountains 230kV line(s) between TS5 substation and Buckeye substation Working with developers, gov’t agencies, and any identified stakeholders to stay ahead of the growth. June 6, 2006 4th BTA

PHOENIX METROPOLITAN AREA TRANSMISSION PLANS 2006-2015 ALEXANDER J/O APS/SRP 2010 AVERY 2009 To Prescott GAVILAN PEAK W A P 2 - Circuits 345KV TO GLEN CANYON (WAPA) CHOLLA PHOENIX METROPOLITAN AREA TRANSMISSION PLANS 2006-2015 TS6 Transmission Planning GLENDALE APS EXISTING 500KV LINES APS EXISTING 345KV LINES APS EXISTING 230KV LINES UNDERGROUND APS PLANNED LINES 230KV 500KV 230KV SUBSTATION (EXISTING) 230KV SUBSTATION (FUTURE) GENERATING SITE & 230KV SUBSTATION JOINT OWNSHIP OTHER COMPANY LINES J/O CAREFREE HWY. T B D ( S R ) BETHANY HOME RD. Substations locations and line routings are approximate 345KV 2 1 TBD SURPRISE AGUA FRIA EL SOL DEER VALLEY RUDD TO PALO VERDE WEST PHOENIX 2007 PALM VALLEY 2010 2012 TS2 TS1 2009 WESTWING LIBERTY/TS4 BUCKEYE TO GILA BEND To Navajo W A P PALO VERDE TS5 500KV To New Waddell WHITE TANKS (APS) 2009 2010 TO PALO VERDE 500kv J/O L I T C H F E D R . Raceway P M A TBD BELL RD. I - 10 FWY. BASELINE RD.. I - 1 7 F W Y . SUPERSTITION FWY. MCDONALD RD. PINNACLE PEAK CACTUS OCOTILLO KYRENE 500kV TO JOJOBA KNOX (SRP) TO BROWNING TO SANTA ROSA REACH LONE PEAK SUNNYSLOPE MEADOWBROOK LINCOLN ST. COUNTRY CLUB 2010 J/O TBD SRP SRP W Y . K P Y E L A L V N S U June 6, 2006 4th BTA