Puerto Rico Electric Power

Slides:



Advertisements
Similar presentations
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Advertisements

Antitrust/Competition Commercial Damages Environmental Litigation and Regulation Forensic Economics Intellectual Property International Arbitration International.
State of the Arizona Energy System Examining the current state of Arizona’s energy mix in the context of the Clean Power Plan.
1 AEP Perspectives on Development and Commercialization of CCS Technology for Natural Gas Power Generation Matt Usher, P.E. Director – New Technology Development.
OHIO ENERGY POLICY PROGRESS & REVIEW UCEAO 6 th Annual Conference Securing Ohio’s Energy and Economic Future THE BEST OF TIMES, THE WORST OF TIMES: ADVANCED.
Arizona Electric Power Cooperative, Inc.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
1.  What is a Renewable Energy Credit (REC)?  What are they used for?  Who uses them?  How is REC ownership tracked?  What is the Renewable Portfolio.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
Johnthescone The IPCC Special Report on Renewable Energy Sources and Climate Change Mitigation.
Triennial Plan 2: Legal Framework. About Us  Efficiency Maine is an independent trust – Accounts and administrative responsibilities transferred from.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
Energy Business Solutions Michigan IRP Working Group Meeting June 10, 2005.
Governor’s Conference on Energy Federal/State/Local Role in Permitting & Regulating Energy Projects October 16, 2013.
Renewable Energy: Legal and Policy Issues Frank Prager Vice President, Environmental Policy Xcel Energy November 20, 2009 Frank Prager Vice President,
Regulatory Flexibility Committee Competitive Procurement September 18 th Joe Kerecman Director Government and Regulatory Affairs
1 Reforming the Energy Vision (REV) “Utility of the Future” Tom Mimnagh Consolidated Edison Co of New York New York Energy Week April 23, 2015.
Applications and Benefits of Energy Storage Maui, Hawaii June 16, 2010 Garth P. Corey, Consultant Sandia National Laboratories Sandia is a multiprogram.
Electric Reliability and the Clean Power Plan Branden Sudduth Director, Reliability Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Smart Power Generation in Jordan, IPP3 and IPP4 Case study.
Colorado Renewable Requirements, Policies, and Projects James Tarpey, Esq. Commissioner Colorado Public Utilities Commission 1560 Broadway, Suite 250 Denver,
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
The Regulatory Assistance Project 177 Water St. Gardiner, Maine USA Tel: Fax: State Street, Suite 3 Montpelier, Vermont.
Lisa Linowes 2010 Mid-America Regulatory Conference Consumer Forum June 6 - 9, 2010 Kansas City, Missouri Wind Energy: An Assessment.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
OVERVIEW OF ISSUES DR AND AMI HELP SOLVE Dr. Eric Woychik Executive Consultant, Strategy Integration, LLC APSC Workshop on DR and AMI.
Arizona Corporation Commission Energy Workshop February 16, 2001.
THE MIX: FACTS, FIGURES, AND THE FUTURE INDEPENDENT ENERGY PRODUCERS ANNUAL MEETING SEPTEMBER 26, 2013 William A. Monsen MRW & Associates Oakland, California.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
Balanced Portfolio for Reliable Electricity System YES Inc. Brief Assessment.
Chelan County PUD PURPA Hearing Fuel diversity Fossil fuel efficiency Chelan County PUD November 19, 2007.
Investing Our Energy In You Traverse City Light & Power Electric Generation TCL&P Study Session December 1, 2009.
October, 2015 PREPA’s Transformation A Path to Sustainability.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Utah Geothermal Power Generation Workshop Regulatory Issues August 17, 2005 Presented by Becky Wilson Utility Economist Utah Public Service Commission.
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th, 2010.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
Environmental Benefits of Renewable Portfolio Standards in an Age of Coal Plant Retirements September 10 th, 2015 Energy Policy Research Conference Denver,
The Effect of Environmental Regulation upon the Electric Power Industry: A Rating Agency Perspective 23rd February 2005 At the California Public Utility.
Generation Subcommittee, Day Two Arne Olson Energy & Environmental Economics, Inc. (E3) Presented to: Subcommittee on Generation Resources Boise, Idaho.
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
Edward Randolph Director, Energy Division California Public Utilities Commission September 30, IEP Conference.
Power Supply Transformation IEPA 2013 Annual Meeting September 27, 2013 January 2013.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
RETI 2.0 Objectives The Clean Energy and Pollution Reduction Act of 2015 (Chapter 547, Statutes of 2015) increases the RPS to at least 50 percent of retail.
WECC Reliability Study Requests Byron Woertz, Manager—System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
1 Water Department FY 2014 Sources and Uses FY 2014 Sources Retail Sales$54,788,834 Wholesale Sales646,250 Other Operating Revenues145,000 Non-Operating.
SFPUC IRP Presentation to CEC April 18, INTEGRATED RESOURCE PLANNING SAN FRANCISCO PUC JAMES HENDRY SAN FRANCISCO PUC.
Institutional Support Vladimir Koritarov Argonne National Laboratory April 2016.
Pasadena Water & Power Integrated Resource Planning “IRP” April 18, 2016 Leesa Nayudu, Resource Planning Manager.
Imperial Irrigation District 2016 Integrated Resource Plan: Imperial Irrigation District April 18th, 2016.
Energy Partners Presentation to Pharmaceutical Industry Association June 13, 2008.
Assessment of the Economic Impact of Greening Vehicular Transport in Barbados Winston Moore (PhD) and Stacia Howard Antilles Economics November 2015.
Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31,
Clean Power Plan EW Tim Wilson Director of Energy Supply Services.
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
CCU Update integrated resource plan May 17, 2016
2017 Integrated Resource Plan
Opportunities in the Changing Energy System
Integrated Distribution Planning Process
City Council April 30, 2018 Item 13
Janine Migden-Ostrander Principal Regulatory Assistance Project
Puerto Rico Electric System Challenges Ahead
Presentation transcript:

Puerto Rico Electric Power Integrated Resource Plan: A vision of New Infrastructure Development for PREPA’S Transformation December 15th, 2015

Core Objective and Agenda This presentation provides a summary of the key recommendations of the Integrated Resource Plan (IRP) proposed for PREPA for the period from 2016 to 2035 and the underlying analysis and assumptions, especially focused in: The IRP report at PREPA’s website (http://www.aeepr.com/Aeees/ley57.asp) also includes: Generation expansion plan Transmission expansion plan Renewable penetration for multiple years, transmission study details, distributed generation. Complementary Studies: Demand Forecast Fuel Forecast Fuel Infrastructure Demand Response Environmental Compliance 2

What is an Integrated Resource Plan? An Integrated Resource Plan (IRP) is: A long term planning assessment, typically covering a 20 year period, by which an electrical service company finds the optimal plan to: Supply the current and forecasted electrical demand Meeting regulatory requirements Reliability criteria The least cost possible Usually subject to public review and final regulatory approval. Essential to effectively plan any decision to replace, retire, or build new generation. 3

PREPA’s IRP PREPA’s IRP: A requirement of Act 57 – 2014: PREPA must present an IRP to the Puerto Rico Energy Commission (PREC) by July 2015. An essential part of the restructuring process that PREPA is currently undergoing. 4

PREPA’s IRP According to Act 57 – 2014, PREPA’s IRP shall include the following, among others: Evaluation of supply resources to satisfy Puerto Rico’s energy demand over a 20 year planning horizon Current generation system evaluation, including improvements, replacements, and retirements, if necessary Interconnection of renewable energy projects to meet law requirements, including distributed generation and utility scale producers Compliance with environmental regulations Energy source diversification, stabilize energy costs, improve system reliability and stability Electric transmission system capacity and reliability Evaluation of energy efficiency (EE) and demand side management (DSM) programs 5

PREPA’s IRP Main issues affecting PREPA’s IRP: Environmental compliance: MATS Rule Clean Power Plan (CO2) Regulatory compliance PREC rules, as per Act 57-2014 PREPA’s restructuring process Forbearance Agreement with creditors Business Plan System costs, reliability, and safety Renewable sources integration Generation, transmission and distribution infrastructure Fuel diversification Energy demand forecast 6

Portfolio Selection Metrics The performance of the portfolios under various futures was assessed based on the following main metrics: Cost Metrics Capital Cost Total System Costs (Fuel, O&M, annualized CapEx, Purchased Power) Operations Metrics Reliability (LOLH / Reserve) Curtailment (inability to accept renewable generation) Environmental and Compliance Metrics CO2 (Clean Power Plan and GHG New Source Standard) Other pollutants (SOX, NOX, FPM) 7

PREPA’s IRP Recommended Main Projects 1st Five Years Driver Site Project COD Fuel Cost MATS Compliance AOGP and related Gas Port Jul-17 -- 373.6 Aguirre Steam 1 Conversion Oct-16 Gas 38.4 Aguirre Steam 2 Conversion Aguirre CC 1 Dual Fuel Conversion Gas/Diesel 24.1 Palo Seco New Palo Seco F Class (359MW) Jan-21 Diesel 369.3 Unit Retirements FY21, FY27, FY31 135.6 Additional T&D Investments FY16-FY20 262.4

PREPA’s IRP Recommended Main Projects Next 10 Years Driver Site Project COD Fuel Cost Energy Efficiency, CPP & Improvements Aguirre Aguirre CC 1 Repowering Jul-21 Gas 185.2 Aguirre CC 2 Repowering Jul-22 New Aguirre 1 H Class (393 MW) Jul-26 397.7 New Aguirre 2 H Class (393 MW) Jul-27 Costa Sur New Costa Sur 5 H Class (393 MW) Jul-30 New Costa Sur 6 H Class (393 MW) Jul-31

Puerto Rico’s Electrical System G 602 Palo Seco Power Plant 400 San Juan Power Plant San Juan Combined Cycle 440 115 kV G 247 Cambalache G 42 Vega Baja 38 kV 230 kV 1400 MW G 2 Culebra G 220 Mayagüez G 42 Daguao 1500 MW 1900 MW G 42 Yabucoa G 6 Vieques G 990 Costa Sur Power Plant G 507 Ecoeléctica Power Plant G 42 Jobos G 900 Aguirre Power Plant G 454 AES Power Plant Aguirre Combined Cycle G 592

Renewable Energy Portfolio Standard Compliance 20% Penetration A 20% RPS Sensitivity was carried out for 2035 under all Futures: This implies 23% renewable penetration and that 68% of the peak could be supplied from renewable for Future 1 to 3. Futures 1 to 3 11

Renewable Integration Curtailment If nothing is done to renew PREPA’s generation fleet, the situation is much worst, paying up to $250 million in curtailment penalties in a year for power NOT served. 12

PREPA’s IRP Benefits Environmental compliance: MATS Rule Clean Power Plan (CO2) 20% Renewable energy integration Fuel diversification through use of natural gas and significant reduction in oil fuel dependency Modern, highly efficient and flexible generation fleet Modern and Reliable T&D System Stable electricity cost and reliable power 6

PREPA’s IRP Benefits Main issues affecting PREPA’s IRP: Environmental compliance: MATS Rule Clean Power Plan (CO2) 20% Renewable energy integration Fuel diversification through use of natural gas and significant reduction in oil fuel dependency Modern Generation Fleet and T&D System More stable electricity cost and reliable power 6

Thank You!