Lance Cunningham, Ph.D., PE November 2015. Frisco, TX 2.

Slides:



Advertisements
Similar presentations
NERC Footnote b / 12 – Load Loss
Advertisements

Goshen Area Bus Reconfiguration
Critique of Proposal to Designate SAPS-Shrew as CRE Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) June 4, 2009.
Discussion: Use of RAPs in system operations Kris Dixit 1.
West Texas Congestion Chad Thompson Congestion Management Working Group August
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
Real-Time Transmission Congestion Management & Market Effects
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
SUBSTATION MODELING: PROTECTION AND AUTOMATION
CITY OF LAKE WORTH, FLORIDA UTILITIES DEPARTMENT A Look at our Electric Utility A Plan For The Future.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
Transmission Reliability Performance Metrics November 5, 2009 © 2009 Blue Arc Energy Solutions, Inc. All Rights Reserved.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Proposed Revision to the Shadow Price Cap and Power Balance Penalties in SCED Same Transmission Element.
Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
ERCOT MARKET EDUCATION
West to North CSC Location Scenario 3b WMS August 20, 2008.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
VRT Study Update José Conto ERCOT System Planning.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
Curtis Crews, Reliability Services Texas Reliability Entity, Inc. Changes in Relay Misoperations Reporting.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
Chad Thompson, ERCOT Special ROS PGRR011 Workshop October 21 st, 2011 SCED Overview and Results.
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
April 28, 2008 Constraint Competitiveness Tests, an Overview Congestion Management Working Group.
CMWG Update to WMS Report of CMWG Meeting of M Wagner Edison Mission Marketing & Trading.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
Slack Bus Change and Impact to Market Market Analysis, ERCOT QMWG Sep. 4, 2015.
Nodal MIS Portal Project MIS Functions to Support EDS 3, Release 5 September 11, 2007.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
Utility Engineers, PC.  Generation  Transmission  Distribution.
DREAM November Meeting. Agenda Introduction and Expectations Path to becoming a Resource Node – ERCOT Registration process for non-modeled resources –
July 10, 2008 ROS Early Delivery Systems Status – R6.3 2 Hour Test John Dumas and Jeff Gilbertson.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
2% Shift Factor rule and associated price discrepancies Kris Dixit 1.
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
1 State Estimator performance. 2 State of Technology Many metrics have been proposed for measuring State Estimator performance.. PI = min Σ( Z – h i (x))^
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
NDSWG Report June 16, NDSWG Report Regular meeting held May 16 in Taylor Telemetry / State Estimator Update Naming Convention Electrical Bus Designation.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
Congestion Management Work Group Update WMS I Flores, S Reedy—ERCOT M Wagner--PSEG TX.
Scheduling and Operating Transmission Devices in the Nodal Environment.
RMS Update to TAC November 1, RMS Activity Summary RMGRR057, Competitive Metering Working Group Name Change (VOTE) Update on RMS Working Group and.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
CMWG Update to WMS Report of CMWG Meeting of M. Wagner Edison Mission Marketing & Trading Thanks to ERCOT Staff for Graphics See ERCOT.
Discussion on FGR Settlement Protocol Language David Maggio CMWG February 17, 2014.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Special thanks to Dr. Kai Van Horn Dept. of Electrical and Computer Engineering.
Proposal for Consideration Regarding Holistic Solution to Congestion Irresolvable in SCED Issue:How do you identify when constraint is irresolvable Proposal:Adopt.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
6/21/2007 TPTF: Baselines 1&2 WP and CI Baselines 1 and 2 White Papers and Change Items Diran Obadina.
Texas Nodal Electrical Buses and Outage Scheduling.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Nodal Planning Go Live Austin, TX February 3, 2011
Information Needed By All Market Participants To Facilitate Transmission Congestion Studies In ERCOT Presented to the ERCOT ROS by Shannon Caraway, P.E.
NPRR833 Workshop: Contingency Processing in CRR, DAM and SCED
Phase Angle Limitations
Review of Abnormal MCPEs
ISO/IOU T&D Interface Update Thomas Bialek PhD, PE Chief Engineer
Removal of Fraser RAS from RAS Databse
Distributed Energy Resources (DER) Experiences at CenterPoint Energy
Removal of Fraser RAS from RAS Databse
Presentation transcript:

Lance Cunningham, Ph.D., PE November 2015

Frisco, TX 2

Transmission Modeling 3

4

Distribution Substation 5 This document and that is confidential, commercially-sensitive, proprietary, and/or public power utility competitive and financial information in accordance with the provisions of Texas Government Code, Section , , and/or , and may be protected from required public disclosure. Load Serving Transformers

Distribution Circuits 6 The distribut- ion system is much more complex. FRISCO Panther Creek Roman Juarez Bridges Yellow might equal blue

Distribution Operations 7 Pole top switches to balance circuits, back- feed or sectionalize for problems, etc.

Direction ….. ? 8 If the direction is to reflect all distributed resources back to their respective transmission buses, then all is done.

Direction ….. ? 9 If the direction is to model all distributed resources to a distribution bus AND to compute a “distribution based locational marginal price” ……. Then the following modeling and operational parameters need to be overcome.

Distributed Resources modeled at the distribution level 10 How should an effective “Transmission Constraint Shadow Price Cap in SCED” be reflected to the distribution level?  Existing N-1 Constraint Violation Caps o 345 kV: $4,500/MW o 138 kV: $3,500/MW o 69 kV: $2,800/MW o <69 kV: $????

Distributed Resources modeled at the distribution level 11 How should the “Texas Two Step” locational market power test be applied at the distribution level? DERs modeled in ERCOT and receiving price signals from SCED should be subject to the Constraint Competitiveness Test in SCED (Protocols section 3.19)  Non-Competitive Constraint Definition A contingency and limiting Transmission Element pair or group of Transmission Elements associated with a GTC that is not determined to be a Competitive Constraint under the process defined in Section 3.19, Constraint Competitiveness Tests.

Current CIM and Planning Models 12 CIM # of Switches CIM # of breakers CIM # of Settlement Points 33,92813, Planning Case # of Loads Planning Case # of Substations with Loads Planning Case # of Buses with an Area Loads 5,6493,1643,782

13 Additional modeling considerations  1,000 DERs could result in 1,000 more modeling points  More SCADA points communicating with ERCOT  Define distribution level contingencies?  More automatic distribution switching schemes o Automatic load rollover schemes o Automatic sectionalizing schemes  Outage scheduling of distribution level equipment  Potentially longer SCED solution times Distributed Resources modeled at the distribution level

14 How much time AND money do we want to take for implementation? Generally, that is directly related to the level of complexity.  How much personnel & equipment?  Regulatory impacts?  Staffing impacts?