P09712 Commercial Roll Line Shrink Reduction Evan DeCotis Levi Stuck Ryan Dennison Joseph FitzeryCinthia Sanchez.

Slides:



Advertisements
Similar presentations
MONITORING OF SUBGRANTEES
Advertisements

Airbus Production System
STOCK CONTROL Inventory is often referred to as the graveyard of business because over investment in stock is a frequent cause of business failure.
inFire HTC speed Furnace Webinar
Product Receiving, Storing, and Issuing
Greenhouse Functions and Controls Horticulture II.
7 Chapter 7 The University Lab: Conceptual Design Hachim Haddouti.
7 Chapter 7 The University Lab: Conceptual Design Database Systems: Design, Implementation, and Management, Fifth Edition, Rob and Coronel.
Preventing Heat Stress. Disclaimer This training material presents very important information. Your organization must do an evaluation of all exposures,
A VISUAL AID TO PYROMETRY COMPLIANCE (A Guide To An Acceptable TUS Report) February 2010.
Global leaders in sleep and respiratory medicine 1 H4i Launch Training © ResMed 2008 June Introducing the new H4i Launch Training.

AUTOMATIC PARTS WASHER: PROBLEM ANALYSIS BEN BROXTERMAN MBA STUDENT SOUTHWESTERN COLLEGE MGMT 580, SUMMER 2012 WP Inc.
Andreana Crance, Industrial & Systems Engineering Matt Syska, Industrial & Systems Engineering.
Commercial Roll Line Shrink Reduction P09712 Levi Stuck Evan DeCotis Cinthia Sanchez Joseph Fitzery Ryan Dennison.
Development of Laser Fuser Test Bed Project Number: P07501 Justin McMillan.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Fresh Bread and Roll Scaling Room MSD II Final Presentation Erik Webster, Cecilia Enestrom, Kate Gleason, Grant Garbach, Andrew Tsai May 15 th, 2009.
P09713 – FRESH BREAD AND ROLL SCALING ROOM Senior Design Winter
Commercial Roll Line Shrink Reduction P09712 Levi Stuck Evan DeCotis Cinthia Sanchez Joseph Fitzery Ryan Dennison.
Commercial Roll Line Shrink Reduction P09712 Levi Stuck Evan DeCotis Cinthia Sanchez Joseph Fitzery Ryan Dennison.
P09713 – FRESH BREAD AND ROLL SCALING ROOM Week 3 Presentation Senior Design I: Winter Cecilia Enestrom, Kate Gleason, Erik Webster, Grant Garbach,
P09712 Commercial Roll Line Shrink Reduction Evan DeCotis Levi Stuck Ryan Dennison Joseph Fitzery Cinthia Sanchez.
System Implementation
EDGE™ Project Review P Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME), Mark Voss (ME),
Field Lab Sample Processing Sequence. 1)Tare a bag on the balance 2)Weigh the field moist sample, in the bag, record weight. Weigh to at least one decimal.
Presented By: Michael Munaco
Contributed by: Integrated Teaching and Learning Program, College of Engineering, University of Colorado at Boulder.
Solutions Overview SAVE FROM 10 – 50%
Wegmans Frozen Cookie Capacity Increase Final Project Presentation Richard Latham, Bridget Eggers, Tyler Brent, Valeria Gonzalez.
10 Energy Saving Advices. 1- Lowering of the temperature at night Limit the lowering of the temperature at night. If the temperature is reduced too much,
Total Productive Maintenance (TPM)
Solution Overview for NIPDEC- CDAP July 15, 2005.
ENERGY CONSERVATION BUILDING CODE – 2006 PRESENTATION BY VP GUPTA PRINCIPAL CHIEF ENGINEER (ELECTRICAL), BSNL CHENNAI.
DEFINING STEPS TO MSD II TYLER BRENT BRIDGET EGGERS VALERIA GONZALEZ RICHARD LATHAM.
Server Virtualization: Navy Network Operations Centers
Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Levi Stuck Evan DeCotis Kate Gleason Stephanie Rager.
The Systems Proposal What the book calls the “Updated Baseline Project Plan” - no standard name for it Presents the different options to the customer along.
David Cook, P.E. State Maintenance Engineer, SCDOT.
Operational Excellence in Effort Reporting Conference Call: March 14, 2012 Vision Statement: Implement a compliant, streamlined, electronic effort reporting.
Some Sub-Activities within Requirements Engineering 1.Prototyping 2.Requirements Documentation 3.Requirements Validation 4.Requirements Measurements 5.Requirements.
Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Levi Stuck Evan DeCotis Kate Gleason Stephanie Rager.
The Effect of High Concentration of Carbon Dioxide on Plant Growth
2  Mission Statement.  Company’s overall purpose and direction, products, services and values.  Goals.  That accomplish the mission. E.g. 5 year plan.
Eleventh Lecture Hour 9:30 – 10:20 am, Saturday, September 16 Software Management Disciplines Iterative Process Planning (from Part III, Chapter 10 of.
P10712 CHEESECAKE PROCESS IMPROVEMENT Andreana Crance, Kevin Rodas, Rob Santora, Jeremy Smith, Matt Syska.
Project Charters Module 3
The Implementation of BPR Pertemuan 8 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Introduction to Software Development. Systems Life Cycle Analysis  Collect and examine data  Analyze current system and data flow Design  Plan your.
TESTING LEVELS Unit Testing Integration Testing System Testing Acceptance Testing.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
Alex Gee Jon Locke Joe Cooper Kylie Rhoades Clara Echavarria Ice Energy Extraction.
P09712 Commercial Roll Line Shrink Reduction Evan DeCotis Levi Stuck Ryan Dennison Joseph Fitzery Cinthia Sanchez.
BRIDGET EGGERS, RICHARD LATHAM TYLER BRENT, VALERIA GONZALEZ Frozen Cookies Capacity Increase.
WELCOME - As you enter the room… Walk around, Read the posted questions, and Use the colored dots provided to select the four questions that are most important.
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
P09712 Commercial Roll Line Shrink Reduction Evan DeCotis Levi Stuck Ryan Dennison Joseph Fitzery Cinthia Sanchez.
Front-end thermal design methods 1
Oman College of Management and Technology Course – MM Topic 7 Production and Distribution of Multimedia Titles CS/MIS Department.
DETAILED DESIGN REVIEW Matthew Jackson, Derek Kreider, Emily Smith, Tashalynn Taylor December 10, 2013.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
Wegmans Commercial Roll Line Shrink Reduction P09712 Project Leads: Levi Stuck Evan DeCotis
Scenario use cases Szymon Mueller PSNC. Agenda 1.General description of experiment use case. 2.Detailed description of use cases: 1.Preparation for observation.
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
DSLAM Configuration in a Cabinet Heat and Noise testing December 2008.
5-1Capacity Planning William J. Stevenson Operations Management 8 th edition.
Computer Control and Monitoring Today we will look at: What we mean by computer control Examples of computer control Sensors – analogue and digital Sampling.
Part 15 Technician’s Guide & Workbook for Duct Diagnostics and Repair.
P09712 Commercial Roll Line Shrink Reduction
QA Reviews Lecture # 6.
Presentation transcript:

P09712 Commercial Roll Line Shrink Reduction Evan DeCotis Levi Stuck Ryan Dennison Joseph FitzeryCinthia Sanchez

Detailed Design Review Agenda  Meeting Purpose  Discuss systems level/detailed designs and address any issues that feel soft or unsure in our shrink reduction project so we can begin implementation with confidence.  Materials to be Reviewed  Project plan, Data Collection, Concept Development, Project Proposals #1, #2, and #3, Suggestion #1, and Risk Mitigation  Meeting Date  February 13 th, 2009  Meeting Location  RIT Campus, Kate Gleason College of Engineering Building 09, Room 4435  Time: 12pm to 2pm  Project Overview  Customer Needs and Project Specifications  Concept Development  Systems Level and Detailed Design  MSDII Plan  Risk Mitigation

Our Goalsforthis Design Review are to…  Bring all stakeholders up to date with our findings  Suggest four implementation plans to increase the overall effectiveness of the commercial roll line  Set the stage for next quarter

Background Information  Project will resolve issues in producing hotdog and hamburger rolls  Brooks Ave bakery supports all Wegmans stores  Maximum throughput of around 4,500 packages per hour  5% to 10% defect ratio

Customer Needs

Engineering Specifications

Cause and Effect

Data Collection  Hamburger  Hotdog

Data Collection

Problems Related to Defects

List of Potential Projects

Proposal 1: K-roll Speed and Oven Capacity  Run the K-rolls at a speed equal to, or less than, the speed of the oven at all times.  K-roll rate cannot exceed 144 rolls/min  Visible Problems  Data show that line imbalance increases defect percentage  Oven is working at maximum capacity  Queuing before and after Proof Box  Inconsistent bake times and proof times

Proposal 1: K-roll Speed and Oven Capacity  K-roll has the capacity to output over 10,800 rolls/hour  Oven has a maximum capacity of 8,640 rolls/hour  Rolls are queued outside of the Proof Box, before and after proofing  Ideal Proof Box Time – 50 minutes  One K-roll – 55 minutes (10% over-proof)  Two K-rolls – 75 minutes (50% over-proof)  Dry rolls account for a majority of hamburger defects

Proposal 1: K-roll Speed and Oven Capacity  During peak production days, K-rolls should not be allowed to run over 8,640 rolls per hour.  Little to no expense to change the rate of production  Estimated 30% defect reduction possible

Proposal 2: Defect Sorting Accuracy and Training Manual  Improve defect sorting accuracy by creating visual aids  Create a training manual for all employees to refer to as necessary  Will be used as a guide for new employees stationed at the QC station  Visual Problems  Lack of consistency in what is considered a defect  Some defects get through QC and sent to customers

Proposal 2: Defect Sorting Accuracy and Training Manual  Large pictures will allow for easy discrimination between good rolls and bad rolls  Flip book will be placed on a stand right next to the QC station  Very visual

Proposal 3: Proof Box Standardization  Standardize the way trays are loaded and unloaded from racks.  Decrease the amount of time the Proof Box doors are left open.  Add a cover on the tops of each rack  Introduce small-scale visual aids  Visible Problems  Rack loading/unloading variability  No standard procedure or formal flow process to follow  Inconsistent proof times, extra racks outside of Proof Box  Each Oven operator has their own rack

Proposal 3: Proof Box Standardization  Load racks from bottom-up  Unload from top-down  Only one rack in front of Oven  Mark each tray with an “Enter” time before Proof Box  Put new numbers on each Proof Box door  Cover the top rack to reduce dry air blowing directly down

Proposal 3: Proof Box Standardization  Estimated 15% defect reduction  Proof Box doors  Leaving doors open for long periods of time increases chances for dry spots on rolls  Leaving the doors open will also decrease the effectiveness of the Proof Box to maintain proper heat and humidity levels  Top Rack Cover  Empty tray  Rack cover attachment  Plastic/paper cover  Time Stamp  Dry erase board/marker on rack  Colored Stickers/Magnets  A fixed timer on each rack  Visual Aids  Sticker/Magnets on doors  Signs reminding to close doors

Suggestion 1: Proof Temperature and Humidity Standardization Phase One:  Monitor and adjust the Proof Box to maintain a constant temperature and humidity level.  Recommended temperature - 100°F to 105°F  Recommended humidity - 80% to 85% Phase Two:  Implement a better way to insulate the Proof Box  Perform minor improvements on Proof Box  Improve air circulation

Suggestion 1: Proof Temperature and Humidity Standardization Phase One:  Monitor temperature and humidity with a wireless thermo-hygrometer  Display can be placed 100 feet from three different sensors  Will be able to pin-point Proof Box inefficiencies by location and type  All workers will be able to see an abnormality on the display of the thermo-hygrometer

Suggestion 1: Proof Temperature and Humidity Standardization Phase Two:  Based on Phase One data, perform improvements on Proof Box  Pneumatic door closer  PVC Screen to cover door opening  Improve weather stripping on bottom of doors

Risk Mitigation Prop. # Risk SeverityProbability Mitigation 1,2,3 No employee buy-in 97 Employee involvement and feedback 1,2,3 No long-term consistency and commitment 95 In house project responsibility 1,2,3 Implementation delay 93 Adequate Planning 1,2,3 Lack of data collection time 35 1 Cause large-scale schedule modification 33 Work with scheduling personnel 2 Workers may not use visual aids 97 Encourage usage 2 Visuals may distract/slow-down workers 33 3 Workers may not use timers 35 Times must be recorded to ensure timer usage 3 Visuals may distract/slow-down workers 11 S1 Disconnect between phase I and II resources 35 Keep full-time employees heavily involved with project S1 Proof box door modifications may not be feasible 17 S1 Addition of fan in proof may cause disruption to proofing 91Conduct experiments with fans in proof

Q U E S T I O N S