1 Keiichiro Sakagami / JEM PAYLOADS Notice : This technical data is furnished on the condition that it will be used by and.

Slides:



Advertisements
Similar presentations
Orion Telecom Networks Inc VCL-E3 OLTE 34Mbps Optical Line Transmission Equipment Slide 1 Updated : January 1st, , Avenue of Fountains,
Advertisements

Valiant Communications Limited Slide 1 Updated : January, 2006 V aliant C ommunications L imited Telecom Transmission Solutions VCL-E3 OLTE 34Mbps.
JUSTSAP Japan Association YEAR IN REVIEW JUSTSAP-PISCES Symposium Hiloton Wikoloa Village, Novemver 10, 2008 Osamu Odawara Tokyo Institute of Technology.
Training Purposes Only JEM MICROBE-I JMU (Ver. 1.2) 1 Notice : This technical data is furnished on the condition that it will be used by and.
Training Purposes Only JEM EPO 17A JMU (Ver. 1.0) 1 Notice : This technical data is furnished on the condition that it will be used by and.
Training Purposes Only JEM SPACE SEED JMU (Ver. 1.1) 1 Notice : This technical data is furnished on the condition that it will be used by.
Operation Status of MAXI and ISS M.Kohama,H.Tomida,S.Ueno,Y.Adachi,H.Itamoto,M.Ishikawa,K.Kawasaki(JAXA), T.Mihara,M.Sugizaki,M.Serino,M.Matsuoka(RIKEN),H.
Training Purposes Only JEM PLT OV JMU (Ver. 1.0) 1 Notice : This technical data is furnished on the condition that it will be used by and.
C2V2 Technical Requirements and Constraints
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
12-/24-Port Gigabit IEEE 802.3at High Power Injector Hub HPOE-1200G HPOE-2400G.
Training Purposes Only JEM FACET JMU (Ver. 1.1) 1 Notice : This technical data is furnished on the condition that it will be used by and disclosed.
Training Purposes Only JEM FPEF OV JMU (Ver. 1.3) 1 JEM FPEF OV Fluid Physics Experiment Facility (FPEF) Overview Notice : This technical.
Training Purposes Only JEM SAIBO MAINT JMU (Ver. 1.0) 1 Notice : This technical data is furnished on the condition that it will be used by.
Belgian User Support & Operations Centre Ham Video On-orbit Functional Commissioning - B.USOC Contribution ARISS Workshop 3 – 5 April 2014 ESTEC.
Comprehend the history and accomplishments of the Chinese Space Program Comprehend the history and accomplishments of the Indian Space Program Comprehend.
Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold.
Open Source DTN for ISS Payloads Concept Proposal, 05-Jun Open-source DTN communication software for ISS Payloads Kevin K. Gifford BioServe Space.
Training Purposes Only JEM MEIS INC JMU (Ver. 1.0) 1 JEM MEIS INC Marangoni Experiment Inc19/20 Notice : This technical data.
Training Purposes Only JEM MS MT INC JMU (Ver. 1.0) 1 Notice : This technical data is furnished on the condition that it will be used.
Training Purposes Only JEM CERISE JMU (Ver. 1.1) 1 Notice : This technical data is furnished on the condition that it will be used by and.
Training Purposes Only JEM PLT Support Material JMU (Ver. 1.0) 1 Notice : This technical data is furnished on the condition that it will be used.
Training Purposes Only JEM RAD SILK JMU (Ver. 1.1) 1 Notice : This technical data is furnished on the condition that it will be used by and.
National Aeronautics and Space Administration (NASA) Glenn Research Center NASA Glenn Research Center (GRC) Acceleration Measurement and Analysis Projects.
1 MINUS EIGHTY DEGREE LABORATORY FREEZER FOR ISS (MELFI) MSFC Briefing February 2005 John Cornwell
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Preliminary Advanced Colloids Experiment – 2.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama BRIC-17 TIR Overview Aug 28, 2012 Tony Cox EO20.
Johnson Space Center, Houston TX Assembly and Disassembly Training Urine Monitoring System (UMS) 1 Familiarization Material for Assembly Task Training.
MSFC Payload Training bs/kh/ExpPldsTST#1/ 3/18/2016 Page 1 Astroculture-8 (ADVASC) TST #1 April 27, 1998 DTM/Beth Skidmore NASA/MSFC Training Branch Voice.
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 21 & 22.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory EXPRESS Logisitics Carrier (ELC) Operations Overview POIWG #26, August.
1 JEM PAYLOADS Off Console Plan Yoshio Toukaku / JAXA Kensuke Teranishi / JAMSS January 31, 2013 Notice : This technical data is furnished on the condition.
JMU Notice : This technical data is furnished on the condition that it will be used by and disclosed to the receiving Cooperating agency and its.
Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM Biotechnology Specimen Temperature Controller (BSTC) Functional.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama TIR overview for UBNT.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Live Video.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG #34 July 23, 2013 Tim Horvath Payload Ops Director
Page No. 1 ISS_CM_019 (Rev 01/2011) Sponsoring Org/Office Code: MIO/OC Name of Forum: POIWG Date: 07/27/2011 Increment Manager/Melissa Owens Increment.
Note: The first status check should occur on the launch flight day prior to crew pre-sleep. This is the only feedback the Glacier team has that the Glacier.
POIWG 1/26/2015 Mana Vautier This presentation is intended solely for the audience to which it is directed. MISSION AND PROGRAM INTEGRATION (MAPI)
EMCS Inc 13 Operations Gary Moore EMCS Ops Lead (256)
OC Team Ops Notes. Jenn Whitworth I2 PRO What are Ops Notes? Ops notes are the OC team’s (OC, Paycom, PRO, CPO)
1 Space Test Program - Houston 4 Payload Overview POIWG, 26 Jul 2012.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Obsolescence Driven Avionics Redesign (ODAR) Status POIWG #31, January.
Splinter Utilization Planning Discussion Notice : This technical data is furnished on the condition that it will be used by and disclosed to the receiving.
1 Notice : This technical data is furnished on the condition that it will be used by and disclosed to the receiving Cooperating agency and its contractors.
February 14, 2013 POIWG Technical Overview CR / HM-3430 Ku Forward Capability.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Payload Operations and Integration Function Overview Payload Operations.
GRAVI2 POIWG #34, July 24 th 2013 Abdul Basit Mohammad N-USOC-NOT-ABM-028, Abdul Basit Mohammad1.
1 Increment 37/38 JAXA Utilization Overview Payload Operations Integration Working Group (POIWG) #33 January 29th – 31th, 2013 Inc37 Lead JEM PAYLOADS.
JAXA Rodent Experiment Requirements Futoshi MATSUNAGA (JAXA IS)
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Date: March 3, 2011 Originator: Tricia Pittman/EO20.
NASA – MSFC, Huntsville, Alabama Muscle Atrophy Research and Exercise System (MARES) Operations Summary Part I/II Karen Somers EO20/ Operations Lead
POIWG #37 in Huntsville January 28th, 2015
ESA Payload Operations Overview: MSL August 07, 2009 / POIC-MSFC.
1 Increment 33/34 JAXA Utilization Overview Payload Operations Integration Working Group (POIWG) #32 in Huntsville, July 24th – 26th, 2012 Takefumi Sakaguchi.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG #35 January 27-31, 2014 Ann Bathew EO03/Operations Directors.
This document is the property of EADS SPACE. It shall not be communicated to third parties without prior written agreement.Its content shall not be disclosed.
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
CPCG-HM Overview POIWG July 26, 2012 Brittney Macon 1.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Obsolescence Driven Avionics Redesign (ODAR) Status POIWG #32, July.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
POIC Data Management POIWG, June 22-25, 1999 G.K./Ops/POIWG/June_99/POIWG_Data_Flow_6_99 1 Onboard Payload Data Flow Capabilities Gary Knickerbocker POIF.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Radiation Environment Monitor Kevin Hargrave EO
MOL Mission Operations Laboratory MOL Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Increment 12 On-Orbit Operations.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Japanese Experiment Module (JEM) Airlock Overview Jimmy Whitaker ISS.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
ISS Institutional DTN Overview for CCSDS
LSG Capabilities LSG nomenclature: WV - Work Volume AL - Air Lock
Presentation transcript:

1 Keiichiro Sakagami / JEM PAYLOADS Notice : This technical data is furnished on the condition that it will be used by and disclosed to the receiving Cooperating agency and its contractors and sub contractors only for the purposes of fulfilling the cooperating agency’s responsibilities under the Space Station Intergovernmental Agreement (IGA) and Memorandum of Understanding (MOU). It shall not be used for any other purpose, nor disclosed or retransferred to any other entity or government without prior written permission of the Japan Aerospace Exploration Agency (JAXA). JAXA Increment 19/20 JAXA Increment 19/20Overview 17A Crew/PL Ops Meeting March 26, 2009 “JJ” “JJ”

2 CONTENTS  JAXA PL RACKS OVERVIEW  INCREMENT OVERVIEW  KEY MILESTONE  JAXA PL OPS STRUCTURE, ROLES & RESPONSIBILITIES  BACKUP CHARTS

3 Saibo Rack JPM1A2 Starboard Port Aft Forward JAXA PAYLOAD RACKS (Saibo, Ryutai) JAXA PAYLOAD RACKS (Saibo, Ryutai) Clean Bench (CB) Cell Biology Experiment Facility (CBEF) Saibo Rack (for Life Science) Fluid Physics Experiment Facility (FPEF) Image Processing Unit (IPU) Solution Crystallization Observation Facility (SCOF) Protein Crystallization Research Facility (PCRF) Ryutai Rack (for Material Science) ER 5 JPM1F1 ER 4 JPM1F5 MELFI JPM1D4 Ryutai Rack JPM1A3

4 Payload Power Distribution Box (PPDB) P-PDB receives main power from a Power Distribution Unit and distributes power to JAXA ISPR Components and Experiment Facilities. AAA/SD Utility Interface Panel Utility Interface Panel provides following communication interfaces: 1553B, Ethernet, FDDI, and video. Maintenance Switch Panel (MSP) The MSP is used for redundant safety interlock. It is used to protect the crew during maintenance or installation activities. Utility DC to DC Converter Unit (UDC) UDC receives 120Vdc safing power from a Power Distribution Unit and provides 28V DC Power to experiment equipments such as Micro-gravity Measurement Apparatus. Clean Bench (CB) CB provides a closed work space for aseptic operation in order to perform life science and biotechnology experiments. Cell Biology Experiment Facility (CBEF) CBEF provides a controlled environment for studying fundamental phenomena of life in the space environment, using cells, tissues, small animals, plants, or microorganisms. PEF Access Port PEF Nozzle is penetrated into the PEF Access Port when the rack has fire. PEF Access Port for CBEF PEF Nozzle is penetrated into the PEF Access Port when the CBEF has fire. PEF Access Port for CB PEF Nozzle is penetrated into the PEF Access Port when the CB has fire. Saibo Rack

5 Protein Crystallization Research Facility (PCRF) AAA/SD Utility DC to DC Converter Unit (UDC) UDC receives 120Vdc safing power from a Power Distribution Unit and provides 28V DC Power to experiment equipments such as Micro-gravity Measurement Apparatus. Utility Interface Panel Utility Interface Panel provides following communication interfaces: 1553B, Ethernet, FDDI, and video. Payload Power Distribution Box (PPDB) P-PDB receives main power from a Power Distribution Unit and distributes power to JAXA ISPR Components and Experiment Facilities. Image Processing Unit (IPU) IPU receives video data from cameras monitoring various experiments and from the Video Control Unit. IPU records, plays back, compresses, and outputs the data to the high rate data link for transmission to the ground. Solution Crystallization Observation Facility (SCOF) SCOF and PCRF provides opportunities for fundamental studies of crystal growth of various solutions and proteins. Fluid Physics Experiment Facility (FPEF) ) FPEF enables users to investigate the effects of the marangoni convection of the moderate temperature. Maintenance Switch Panel The MSP is used for redundant safety interlock during maintenance or installation activities. PEF Access Port PEF Nozzle is penetrated into the PEF Access Port when the rack has fire. Storage *Now FPEF silicon oil filter is installed on this position. Ryutai Rack

6 INCREMENT 17 OVERVIEW Inc 17 was the first increment to conduct experiments in Kibo. Initial checkout for Saibo/Ryutai rack was completed and some Japanese experiments were successfully performed. In addition to JAXA PL racks, MELFI and ERs were transferred from USlab to JPM. FPEF/Marangoni ExpSaibo/CBEF Checkout JAXA PL Racks Checkout with Greg

7 INCREMENT 18 OVERVIEW Ice Crystal Experiments are going well. From this increment, we are going to start Life Science Experiments (Rad Gene & LOH and Dome Gene). A series of CGSE CO2 T/S was performed and now we think CGSE can supply CO2 to Saibo Rack. In addition to JAXA PL racks, MELFI and ERs are in operations. SCOF/Ice Crystal Rad Gene and LOH Dome Gene

8 INCREMENT 19/20 OVERVIEW More than 10 experiments are planned in the JPM using both Saibo/Ryutai Racks. Microbe-IRad SilkSpace SeedJAXA PCG FACETMarangoni Exp 3 SEDA-APMAXISMILES More than 10 experiments are planned in the JPM using both Saibo/Ryutai Racks. Moreover, from this increment, we will start the first operations on JEM External Payloads (both JAXA and NASA PLs). More than 10 experiments are planned in the JPM using both Saibo/Ryutai Racks. Moreover, from this increment, we will start the first operations on JEM External Payloads (both JAXA and NASA PLs). In addition to JAXA PL racks, MELFI and ERs are getting into full swing. There may be some simultaneous operations constraints based on the JEM stage analysis. The number of crewmember will be increased.

AprMayJunJulAugSepOct Biological Rhythms (FE2) 17S Undock (4/5) 32PUndock (4/20) 33PDock (4/26) 2J/A Dock (6/15) 2J/A Undock (6/26) 19S Dock (5/29) Facet Cell Setup/MLT On Cell Rotation Undock DockCrew Activity EPO3/ Moon Score Biological Rhythms (FE1) EPO3 Biological Rhythms CBEF/CB Maintenance FPEF Experiment Cell Setup /MLT On Marangoni CB/CBEF CL-UP JAXA PCG Canister Attachment 34P dock (7/26) Sanita PADLES Removal Saibo Maintenance Microbe Rad Silk 17A Dock (8/8) 17A Undock (8/17) MEU Attachment / Detachment Swab FPEF Experiment Cell Setup 18S Undock (10/11) Canister Detachment HTV1 Berth (9/8) HTV1 Undock (10/7) PADLES Setup PEU Attachment Short Exp Watering / MELFI Sample Replacement ELT C/O EPO3/Dewey’s Forest Setup EPO3/ Moon Score JAXA-CM1/CM2 HDTV C/O Ryutai Rack Saibo Rack Small PL PADLES CM 18S Relocate (7/20) 34PUndock (9/29) 33PUndock (7/17) 20S Dock (10/2) Space Seed MLT Off VRU Exchange SEDA-AP MAXI SMILES JAXA Utilization Overview (Based on Final OOS Input) Increment 19/20 External PL KEY MILESTONES

10 JAXA Payload Ops Conductor (JPOC) Rack Officer (BIO/FISICS) User Integrator (BIO/FISICS) J-FLIGHT JFCT (FLAT,CANSEI, J-PLAN, J-COM, Tsukuba-GC, SENIN, ARIES, KIBOTT) POICSSIPC/MCRSSIPC/UOA (Cadre) Rack Operator (BIO/FISICS) Technical Support* (BIO/FISICS) JEM Pressurized Payload Operations NASA/POIC Cadre POD JAXA System/Payload Safety * SSIPC/ESR JEM Payload Officer (JEM PAYLOADS) JAXA PL OPS STRUCTURE (Inc 19/20) Payload Ground System Officer* *IPU-G Operator *On-call New PL FCTs for JAXA Exposed Payload Operations JEM Exposed Payload Operations Exposed Facility Payload Officer (ExPO) MAXI Operator SEDA-AP Operator SMILES Operator (after Flt HTV1) Technical Support* (SEDA-AP, MAXI, SMILES)

11 JEM PAYLOADS (JEM Payload Officer) JPOC (JAXA Payload Ops Conductor) Makoto Furukawa Kyoichi Arakane BIO (BIology Ops Lead) FISICS (FluId ScIence and Crystalization Science Ops Lead) Daisuke MasudaWaka NishikawaRyoichi Kumagai Kensuke Teranishi Satoshi “Gucci” Kawaguchi Takuya Takami Yuki Kawai PL OPS MANAGER Toru Mori JAXA PL Inc Manager JAXA Inc Scientist Hideo Usui Takahiro Sato Keiji Murakami Takao Wakatsuki Misako Nomura Hideki Nagata Aakane Imamura Kenji Noguchi Kenta Kinoshita Shusuke Ochiai Takehiko IshikawaShimpei TakahashiKunihiro “Kuni” Matsumoto Keiichiro “JJ” SakagamiRyoji Kobayashi RO (Rack Officer) OP (Operator) RO (Rack Officer) Chie Inoue Yusuke Ohkawa Kazue Ueyama Chikara “Rickey” Harada Kuniko “Nicky” Okada Hideyuki Watanebe Yuusuke WarashinaYuhei SuzukiHiroya KoikeMakoto WatanabeYuuta Iwahana Go Hyakutake Yukiko Abe Exposed Payload Lead Position Lead for Inc. 19/20 Increment Lead JEM Payload FCT Members (for Inc 19/20) As of January, 2009 Exposed Payload Ops Team Masayuki Goto

12 JEM Payload FCT Members (for Inc 19/20) As of January, 2009 JEM PAYLOADS (JEM Payload Officer) JPOC (JAXA Payload Ops Conductor) Makoto Furukawa Kyoichi ArakaneKensuke Teranishi Takuya Takami PL OPS MANAGER Toru Mori JAXA PL Inc Manager JAXA Inc Scientist Keiji Murakami Takao Wakatsuki Kenji Noguchi Takehiko IshikawaShimpei TakahashiKunihiro “Kuni” Matsumoto Keiichiro “JJ” SakagamiRyoji Kobayashi Chikara “Rickey” Harada Kuniko “Nicky” Okada Hideyuki Watanebe Go Hyakutake Exposed Payload Lead Position Lead for Inc. 19/20 Increment Lead Pressurized Payload Ops Team Masayuki Goto MAXISEDA-APSMILES ExPO (Exposed Payload Officer ) Daichi SAKOH OP (Operator)

13 ROLES & RESPONSIBILITIES

14 JAXA PAYLOAD OPERATIONS TEAM User Operations Area (UOA)

15 BACKUP CHARTS HOSC/SSIPC NEW GATEWAY JAXA ACTIVITY OV (INC 19/20) RACK TOPOLOGY IN THE JPM

16 HOSC/SSIPC NEW GATEWA Y All Ku band 150.0Mbps IPU realtime video: 43.0Mbps PDH Data: 0.5Mbps Mid Rate Data of Payload: 3.0Mbps HDTV : 27.0Mbps It is impossible to downlink realtimely. 23.5Mbps MSFC TKSC Receive Capability:23.5MbpsTrans-Pacific GW OCSPDSS Present ICD >43.0Mbps 23.5Mbps BACKGROUND (1)It took too long time to complete Fluid Physics Experiment because the video to downlink from the IPU was more than we expected. (2)The HDTV System has been developed. (3)Bandwidth of all Ku band became 150Mbps. (4)Trans-Pacific goes down in price. Demand

17 (1)To downlink the video of the IPU in realtime to SSIPC at the maximum rate (43 Mbps). (2)To downlink the HDTV in realtime to SSIPC Purposes for new Gateway are... MSFCTKSC Receive Capability:23.5Mbps Trans-Pacific GW PDH & Mid Rate >43.0Mbp s IPU or HDTV new GW PDSS OCS HOSC/SSIPC NEW GATEWAY

18 APS PLAN OF NEW GATEWAY JEM IPU Bitstream MPC Bitstream PDH MAXI SMILES US LAB MPC Bitstream PEHG HCOR Ch.2 Ch.6 APID 1200,1201 APID XXXX APID YYYY Ch.8 HRFM APID 1210 Ch.2 JSC VCID 26 VCID 18 Pkt b/s HDTV User IPU User PL User MAXI User SMILES User VCID 18 VCID 26 VCID 26? VCID 26? APID 1210 APID 1200, 1201, XXXX, YYYY New Gateway APID 1210 In March 2009, the New Gateway will be installed and tested for communication interface. In April 2009, the New Gateway will start to be operated for JAXA payload. Note For JAXA Commercial in March, the HDTV will reach JSC.

19 JAXA Maintenance JAXA Payload hours: Red:<=1hrs Yellow:1–4hrs Green:>=5hrs WEEKS (beginning) 8/88/8 8/17 5/175/ Wk 7 5/18 Wk 8 5/25 Wk 9 6/1 Wk 10 6/8 Wk 15 7/13 Wk 17 7/27 18S dock 3/27 17S undock 4/5 20S dock 10/2 18S undock 10/11 RS EVA Shuttle/Soyuz Dock/Undock Progress Dock/Undock JEMRMS Ops Marangoni EXP HTV Ops Rad Silk Area PADLES PROX C/O JAXA PCG Holiday ICS C/O Holter ECG CGSE OPS 33P dock 4/26 33P undock 7/10(TBD) RS EVA #22 6/5 34P undock 9/29 FACET CommercialEPO2MELFI ISS CDR (Gennady Padalka) FE-1 (Mike Barratt) JEMRMS THC A HEPA R&R ATCS Sample MELFI Dewar 1, 2, -95C and Dewar +2 OPS in JPM ATCS Sample CGSE(Ar) Hatch Seal Inspect JPM/JLP MESHCVR/IMV GRILL/DIFFUSER CLN (Weekly) 32P undock 4/21 34P dock 7/26 26 PEPS AuditPEPS QDMAPEPS Hatch Seal Inspect Area Dosimeter Wk 6 5/11 Wk 11 6/15 Wk 12 6/22 Gas Trap Ops ELPS Check Space SeedMicrobe Wk 16 7/20 PROX C/O#4 PROX C/O#3 CBEF/CB Maintenance Commercial EPO3 ATCS Refill JAXA Activity OV (as of JAN 21, 2009) JAXA PCG Wk 18 8/3 Wk 20 8/17 27 Wk 26 9/28 Wk 27 10/5 HTV 9/8 19S dock 5/29 Exp18 FE-2 (Tim Kopra)Exp18 FE-2 (K. Wakata)FE-2 (Nicole Stott) FE-5 (Frank DeWinne) FE-4 (Robert Thirsk) FE-3 (Roman Romanenko) 18S reloc 7/20 RS EVA #23 6/10 THC B HEPA R&R Windows InspectFire Alarm Indct C/O Gas Trap Ops PEPS QDMA CBEF/CB Cleanup Rad Silk SAIBO RYUTAI Others SYSTEM PAYLOAD JAXA P/L Maintenance 10/8 Microbe 2J/A17A HTV Road to 2J/A HTV Ops Maintenance US P/L in JEM HREP [Ground] SDRAMSAMSUSOS Maintenance Biological Rhythms(FE-2) HDTV Road To 2J/A Ext P/L ICS Voice Func C/OICS C/O [Ground] SEDA-AP and MAXI C/O & Ops [Ground] P/L Stowage Rcn Biological Rhythms(FE-1) P/L Stowage Recon SMILES C/O & Ops [Ground] Wk 1 4/6 Wk 24 9/14 Wk 25 9/21 Wk 2 4/13 Wk 3 4/20 Wk 4 4/27 Wk 5 5/4 Wk 13 6/29 Wk 14 7/6 Wk 19 8/10 Wk 22 8/31 Wk 21 8/24 Wk 23 9/7 FACET Space Seed HDTV C/O Marangoni EXP X2R8:7/6-9

20 RACK TOPOLOGY IN THE JPM NASA allocation Hard / Soft Dummy panel System Rack Stowage location *This rack is configured according to Inc19,20 IDRD (draft).