The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.

Slides:



Advertisements
Similar presentations
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 6, 2012.
Advertisements

Double Chooz: Outer Veto
Steve Hahn, CDF Meeting - October 7, CDF Operations Summary Shutdown progress  Work finishing up in west and east bores COT  Loose cables SVX 
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
Beam Position Monitors MICE CM Harbin January, 2009.
1 Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting June 20, 2007.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
The Design of MINER  A Howard Budd University of Rochester August, 2004.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 20, 2011.
XEC Hardware Status MEG Review Meeting 2010 Liquid Xenon Group.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Nov
Studies of radiation hardness of ECAL modules 1Yu. Guz 2013/05/28.
Proton Source Repairs Dan Bollinger 2/1/10. Cockcroft-Walton accelerators FNAL has 2 Cockcroft-Walton Pre-accelerators (Pre-acc) that provide beam to.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
1 TPC online  offline calibration November 2002.
Electronic Detector status and run organization Logistics and organization Updates on the electronic detector since last year run Conclusions.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
The Design and Performance of the MINER A Detector Howard Budd, University of Rochester Technology and Instrumentation in Particle Physics 2011.
Luminosity Monitor UKNF Meeting 7 June 2010 Paul Soler, David Forrest Danielle MacLennan.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep 26, 2011.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar
MINERvA Main INjector ExpeRiment for -A is the symbol for the neutrino. The beam that is sent to MINERvA is made out of neutrinos. In chemistry, an A stands.
Fast Timing Mtg April 15 th 2009 Mike Albrow Fast Timing studies at Fermilab : Test beam plans notes from meeting April 15 th 2009 MTest May Wed 27 th.
CEDAR Support Structure Peter Sutcliffe 24 th January 2011.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 17, 2011.
1 HBD Update: DC Meeting June 2006 Thomas K Hemmick for the HBD Crew…
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
1 Zero Degree Calorimetry for CMS Had EM e +,  - Michael Murray for CMS.
HAPPEX DAQ / ADC Tests Luis Mercado UMASS 4/17/09.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
MINER A Main INjector ExpeRiment for v-A Active segmented scintillator detector: 5.87 tons Nuclear targets of C, Fe and Pb, Water, Helium.
MINER A Main INjector ExpeRiment for v-A Active segmented scintillator detector: 5.87 tons Nuclear targets of C, Fe and Pb.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Arnd Meyer (RWTH Aachen) July 21, 2003Page 1 Data Taking July 14 – 20 Day∫L dt (del)∫L dt (rec)Efficiency Mon 956nb nb % Wed 111nb nb.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jan 25, 2016.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar 30, 2015.
Status of HRS Detectors Barak Schmookler DVCS - 12/19/20131.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 8, 2016.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Dec 9, 2013.
CMS ROC Report Patricia McBride May 26, 2005.
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
Presentation transcript:

The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013

MINERvA Shifts Running weekday day shifts for about 5 – 8 hours –Since the CROC-E installation, only the experts have been operating DAQ –All FEBs & PMTs (front end boards) operating Will run 24 hour shifts when start we get NuMI beam –However, we cancel non day shift if there is no NuMI beam. 2

CROC-E Upgrade Old CROCs were replaced by the CROC-E boards Jun –All CROC-Es work, no problem seen –We are able to take data –We are getting Run Control working so that a non-expert (i.e. shifter) can take data –Couple of days of work needed to get the system fully operational including online monitoring. With old CROCs, the DAQ needed 3 computers. The CROC- E DAQ is fast enough that the DAQ needs only 1 computer 3

New DAQ Computers Will be replacing 3 DAQ computers with 4 DAQ computers. –Right now, we are reading out the CROC-E with the old DAQ computers –1 st install 2 computers in DAQ rack, later 2 in VETO rack Jun 27 we are planning on installing 2 new computers in DAQ rack. 4

PMTs Our PMT Box test stand in Lab G is full operational. –Tests cross talk & light tightness of PMT boxes Previously, we pulled tubes off the detector with the HV varying problem – HV varies volts around its set value, but only does this periodically. PMTs get HV through a Cockcroft-Walton on the base. In fact for the last 2 years it has been our only PMT box failure –Taken 3 PMT boxes with this problem & replace their inner part (base and cables), but not the PMT –2 pass test stand QC, third needs further investigation –PMT varying problem does not show up on the test stand 5

PMTs Jun 27, we plan on replacing 2 PMT boxes with these PMT boxes to see if they are fixed. –1 st row east side, outer detector (OD), –Easiest place to install, can be done while looking at what you are doing. –Its OD so that if the HV varies, not such a problem –Boxes are fairly easy to replace if there is a problem. –Also important as training for people to replace PMT boxes on detector. Steve Chappa, Roberto Davila, & Kevin Kuk 6

Muon Monitor 4, MM 4 The on-off valve for the gas line to MM 4 and the gas line to MM 4 are installed so that He can flow to the hadron monitor and MM 1, 2, & 3. –When gas system comes for MM 4, gas to MM 4 can be turned on without affecting MM 1, 2, & 3. This work can be done in access tunnel. The MM 4 electronics rack should get its ORC on Jun 26 Need 3 readout bundles, each consisting of 30 RG174 cables to be installed in the alcove. –These are begin built on site –2 should be installed and cabled in the alcove this week –3d cable should be made at the end of this week & Install early next week in alcove. 7