MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.

Slides:



Advertisements
Similar presentations
Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
Advertisements

The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 6, 2012.
Steve Hahn, CDF Meeting - October 7, CDF Operations Summary Shutdown progress  Work finishing up in west and east bores COT  Loose cables SVX 
Linac Status Eric Prebys DOE Review, Proton Source Breakout Session July 21,2003.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
NuMI MINOS The MINOS Far Detector Cosmic Rays and their neutrinos are being collected now. How does this work, and of what use is this data? Alec Habig,
1 Timescales Construction LCR MICE Beam Monitoring counters + DAQ My understanding Jan 07 Feb 07 Mar 07 Apr 07 May 07 Jun 07 Jul 07 Aug 07 Sep 07 ISIS.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
Detector Systems For May/June Run MICE Video Meeting April 24, 2008.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
The Design and Performance of the MINER A Detector Howard Budd, University of Rochester Technology and Instrumentation in Particle Physics 2011.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Luminosity Monitor UKNF Meeting 7 June 2010 Paul Soler, David Forrest Danielle MacLennan.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
MINERvA Main INjector ExpeRiment for -A is the symbol for the neutrino. The beam that is sent to MINERvA is made out of neutrinos. In chemistry, an A stands.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 17, 2011.
Tracker Timing and ISIS RF Edward Overton 1. At CM32… 2 Had done some preliminary checks on the ISIS RF. Was beginning to think about how to handle the.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
Update on the GRINCH Detector SBS meeting, 21 Oct 2015 T. Averett, W&M JLab, NC A&T, JMU, Glasgow Timing-based gas Cherenkov detector PMT array-510 tubes.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
MINER A Main INjector ExpeRiment for v-A Active segmented scintillator detector: 5.87 tons Nuclear targets of C, Fe and Pb, Water, Helium.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jan 25, 2016.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar 30, 2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 8, 2016.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Dec 9, 2013.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
HF Test station at P5 A.Mestvirishvili.
Presentation transcript:

MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013

MINERvA Shifts As last week, running weekday day shifts for about 5 – 8 hours –Since the CROC-E installation, only the experts have been operating DAQ –All FEBs (front end boards) & PMTs operating Will run 24 hour shifts when start we get NuMI beam –However, we will cancel non-day shifts if there is no NuMI beam. 2

CROC-E Upgrade Old CROCs were replaced by the CROC-E boards Jun 12-13; all CROC-Es work, no problem seen: –Detector being read out with no light-tight problems –With old CROCs, the DAQ needed 3 computers. The CROC-E DAQ is fast enough that the DAQ needs only 1 computer Some minor problems in online monitoring: –gmBrowser (online monitor program) needs rebuild with version of ROOT matching new DAQ –Two light injection (LI) boxes need two serial connections. New single readout computer only has one; various solutions being discussed Networking upgrade caused no problems 3

New DAQ Computers Will be replacing 3 online DAQ computers with 4 new DAQ computers –Right now, we are reading out the CROC-E with the old DAQ computers –Geoff Savage has installed two computers in DAQ rack, later will add another two in VETO rack –New computers cannot be powered on for unattended operation until ORC for rack is approved Also, Geoff is working on upgrading computers in 12 th floor control room –4 new computers in hand –Need configuration and installation of software before usable in control room 4

PMTs Our PMT Box test stand in Lab G is full operational. –Tests cross talk & light tightness of PMT boxes Previously, we pulled tubes off the detector with the HV varying problem – HV periodically varies volts around its set value PMTs get HV through a Cockcroft-Walton on the base In fact for the last 2 years it has been our only PMT box failure –Taken 3 PMT boxes with this problem & replace their inner part (base and cables), but not the PMT –2 pass test stand QC, third needs further investigation –PMT varying problem does not show up on the test stand (though may be matter of PMT box orientation) 5

PMTs Last Thursday, we replaced 2 PMT boxes with these PMT boxes to see if they are fixed –1 st row east side, outer detector (OD), –Easiest place to install; can be done while looking at what you are doing. –Its OD so that if the HV varies, not such a problem –Boxes are fairly easy to replace if there is a problem. –Also important as training for people to replace PMT boxes on detector. Steve Chappa, Roberto Davila, & Kevin Kuk Replacement went fairly easily, but did knock adjacent FEB which had to be reseated 6

Muon Monitor 4 Gas lines and HV cables have been run to MM 4 –Upstream portion of gas delivery still needs work Need 3 readout bundles, each consisting of 30 RG174 cables to be installed in the alcove. –1 bundle installed; 2 others being assembled and/or need installation –Hope to have al cables in place by end of this week Last Wednesday had first ORC review of MM 4 electronics rack; plan to address issues noted by Steve Chappa and have final review next week First SWIC scanner to have Ethernet readout 7