AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.

Slides:



Advertisements
Similar presentations
HCAL Front End Boards HCAL – Technical Meeting Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.
Advertisements

Optical Fiber Calibration System and Adaptive Power Supply Jiri Kvasnicka, Ivo Polak, Jaroslav Cvach Prague, Institute of Physics Gerald Eigen,
LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague1 LED notched fibre system at AHCAL Calibration system for SiPM Ivo Polák 1.Notched fibre.
Calice, UT ArlingtonJiri Kvasnicka, FZU, Prague1 LED notched fiber system Jiri Kvasnicka 1.Introduction 2.Test setup and fiber layout on HBU0.
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka, Ivo Polak Institute of Physics (FZU), Prague June 11, 2011TIPP 2011, Kvasnicka1 The.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
Optical calibration system for EUDET AHCAL module Jaroslav Cvach IPASCR 1.Calibration system for SiPM photodetectors 2.QRLED driver photoelectron spectra.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka Institute of Physics, Prague June 11, 2011TIPP 2011, Chicago1 Under.
AHCAL Electronics. Status EUDET Prototype Mathias Reinecke for the DESY AHCAL developers EUDET Electronics/DAQ meeting London, June 9th, 2009.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
AHCAL Electronics. Front-end electronics and DAQ Mathias Reinecke CALICE meeting Hamburg March 21st, 2013.
Second generation Front-end chip for H-Cal SiPM readout : SPIROC DESY Hamburg – le 13 février 2007 M. Bouchel, F. Dulucq, J. Fleury, C. de La Taille, G.
AHCAL Electronics. Status and Outlook Mathias Reinecke AHCAL main Meeting D ESY Hamburg, Dec. 16th, 2014.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
AHCAL – DIF Interface EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
LCWA, ALCPG 2009 Albuquerque, NM Ivo Polák, FZU, Prague1 Calibration system of CALICE AHCAL detector Ivo Polák 1.Two calibration light distribution.
AHCAL updates: SPIROC and DIF Mathias Reinecke, Felix Sefkow CALICE/EUDET electronics meeting London, January 10, 2008.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
AHCAL Status. Electronics and DAQ Mathias Reinecke CALICE meeting Argonne ANL, Mar. 19th, 2014.
HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System.
Organization for Micro-Electronics desiGn and Applications HARDROC 3 for SDHCAL OMEGA microelectronics group Ecole Polytechnique CNRS/IN2P3, Palaiseau.
Detector Interface (DIF) Status CALICE meeting – DESYDec Mathias Reinecke.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
AHCAL electronics. Status Module Production an Power Pulsing Mathias Reinecke AHCAL main meeting DESY, Dec. 10th, 2013.
AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
Mathias Reinecke CALICE week Manchester DIF development – Status and Common Approach Mathias Reinecke for the CALICE DAQ and Front-End developers.
Visit to CALICE ECAL testbeam (by Shinshu) at DESY, 16 th – 19 th October 2012 Samir Arfaoui & Erik van der Kraaij 30 th October 2012.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers HCAL main meeting, DESY.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
Mathias Reinecke AHCAL Main Meeting Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
AHCAL Electronics. integration status and open issues Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
Annual EUDET, OCT6,2008 Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers for AHCAL EUDET annual meeting, NIKHEF 1.Introduction 2.QRLed.
GLD ECAL Beam Test at DESY - Plan and outlook - Satoru Uozumi (Shinshu) Jan Japan-Korea Joint Shinshu Univ.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
Front end electronics for the Tile HCAL prototype Felix Sefkow DESY CALICE Collaboration ECFA workshop Durham September 1, 2004.
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
JRA3 Institute of Physics ASCR Prague
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
Kenneth Johns University of Arizona
LED notched fibre system short HBU0 party with QMB6
on behalf of the AGH and UJ PANDA groups
Baby MIND Collaboration Meeting #2
CALICE meeting 2007 – Prague
HCAL task status report
Integrated LED calibration
LED notched fibre system at AHCAL Calibration system for SiPM
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
UK ECAL Hardware Status
CALICE meeting 2007 – Prague
Status of the EUDET Prototype
Scintillator HCal Prototype
Presentation transcript:

AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010

Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 2 Outline > Hardware Developments  HCAL Base Board (HBAB)  HCAL Analogue Board (HAB)  HCAL Testboard > System Commissioning  Cable Interfaces  Safety > Circuit Details  Slow Control Loading  Analogue Readout Path > Light Calibration System (ASCR Prague) > System Setup

Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 3 System Electronics Setup > Two types of HBABs realized: ‘Left’ and ‘Right’. > One HBAB reads out up to 108 detector channels (SiPMs).

Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 4 HCAL Analogue Board (HAB) Analogue Line Drivers Temperature Monitor Analogue Test Output (Gain=0.5 in 50  ) Reference Voltage Slow-Control Settings (Param. Shift Reg) ASIC Connector to HBAB (18 channels) 576 Boards produced.

Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 5 HCAL Base Board (HBAB) Detector Interface (SiPMs) POWER (Sub D) & DAQ (SCSI) Interfaces Type Def. HAB Bypass Jumper LED System Control (2 diff lines) 100 boards produced (50 of each type)

Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 6 SiPM to HBAB interconnection Coaxial cable interconnection (Bias-V on cable shield)

Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 7 HCAL Testboard CMB Control POWER Input Charge Injection 18 SiPM Inputs (SiPM Bias+Signal) HAB Test Outputs (SRIN, TCALIB) DAQ Interface Charge Injection 2 Boards available

Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 8 Cabling and Safety 68-pin SCSI DAQ connector 9-pin Sub D Power connector Up to +100V (DC) SiPM Bias voltage on all HCAL boards on open traces

Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 9 HAB Parameter Configuration (Slow-Control) Step 1 : SW_DAC=1 : Load ASIC DAC SR, 18 x 8 bits per HAB, 864 bits per HBAB for 6 HABs Step 2 : SW_DAC=0 : Load external SR, 16 bits per HAB, 96 bits per HBAB for 6 HABs

Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 10 HAB Analogue Output Stage From ASIC analogue output AD8051 G=1 Ref.-Voltage 1.2V LM4051 Line Driver AD8131 G=2 To CRC ADC input 120  terminated Backward termination 56  on each line Line Driver AD8131 G=2, Test Outp. 50  Lemo Test Output in 50 

Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 11 Light Calibration System > Calibration and Monitoring of the non-linear detector response > Based on UV LEDs and light distribution by fibers (one fibre per channel). > CAN bus controlled by an extra PC. > Light output monitoring by PIN-diode readout (with HBABs and HABs) > Module Name: “Calibration and Monitoring Board” (CMB) Developed by our Prague colleagues (ASCR Prague)

Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 12 Light Calibration System CMB

Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 13 System Setup – Signal Chain PIN Readout Crate One crate for all layers DAQ (CRC) for all layers

Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 14 System Setup – Slow Control / Power picture by Erika Garutti Temp.-Sensor

Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 15 Conclusions > Schematics of all boards can be provided ( address?)! > Simply contact us whenever support is needed! Link to Manual (HCAL electronics):