UK-V MeetingPaul John Dervan Irradiation's 2003 Update Paul Dervan Craig Buttar, Simon Dixon, Chris Grigson, Richard Nicholson and the irradiation team.

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
MICE Target Report Video Conference 15/03/07 Chris Booth Sheffield 15 th March 2007.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
CALICE WHCAL testbeam at SPS H8 27 sep – 03 oct: 6 days for energies up to 180 GeV (+ polarity)
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
Team #1 PICA: Design Decisions and Current Status Report A. BallK. Wiersma N. JenA. Sterk.
MICE Target Schedule Chris Booth Sheffield 12 th June 2006.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
G2p Safety Readiness Review January 17, 2012 Expected Radiation Exposure Levels from Activated Local Dump George Kharashvili, Radiation Control.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
1 T2K Beam Operation Summary (earthquake recovery and beamline survey) NBI 2012 T. Ishii (KEK) for the T2K beam group.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
1 Daniel Dobos University Dortmund Pixel Testbeam July 2003 Daniel Dobos University Dortmund – E4 ATLAS-/Si-Meeting Pixel Testbeam July.
DESY test beam Feb 2014 report Marko Milovanovic*, Sergey Burdin, Gianluigi Casse, Paul Dervan, Dean Forshaw, Ilya Tsurin, Sven Wonsak 14/11/2015.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Si-detector macroscopic damage parameters during irradiation from measurements of dark current evolution of with fluence Craig Buttar, University of Sheffield.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (V. Kapin: Booster Collimator) – Additional Meetings/Notes.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (Joe Compton - shutdown) – Additional Meetings/Notes.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
High Rate Tracking Test Beam Area David Christian & Richard Coleman.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Steven Worm – RutgersMar 25, CMS Testbeam at Fermilab: Status and Plans o Testbeam Setup Status –Big pieces are now in place: telescope, Si, ROC,
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
10/02/2011 Global Design Effort 1 Positron Source meeting J. Clarke, D. Angal-Kalinin, N. Collomb.
Pressure drops over cooling pipes Richard French, Richard Bates, Alex Bitadze.
Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.
Update from Birmingham Phil Allport, Daniel Briglin, James Broughton, Andy Chisholm, Laura Gonella, Kostas Nikolopoulos, Simon Pyatt, Juergen Thomas, John.
SCT Testbeam: report & plans Gareth Moorhead (with thanks to Lars Eklund for being there for me) Uppsala 13 June 2003.
M. Bonesini – CM 291 PID detectors summary M. Bonesini Sezione INFN Milano Bicocca.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
L-band test stations in End Station B Richard Swent.
PIP Update July 29 th Agenda Summary Update – Current Activities – Updates Tom Kubicki (Station 20,21,22 – Gallery and Equipment Work) – Additional.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
Run II preparations Test beam plans Moving from 156 to 169 DT-LHCb coordination meeting June 2, 2015.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
Proton and neutron irradiation facilities in the CERN-PS East Hall Maurice Glaser and Michael Moll CERN- PH-DT2 - Geneva - Switzerland 6 th LHC Radiation.
Irradiations / Birmingham Status Paul Dervan, Tony Affolder and Sven Wonsak The University of Liverpool, UK Paul Dervan, Paul Hodgson, Kerry Parker, Matthew.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
K. Long, 28 June, 2016 Introduction to MICE — and the role of the Hydrogen Delivery System.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
/ 11 Updates of PANDA 3D Model CM June 2016 at GSI, MEC Session J. Lühning, GSI Updates for: Panda Hall Target Spectrometer Latest version.
Irradiation test of Commercial (BASLER) digital cameras
MODULE QUALIFICATION STATUS AT LIVERPOOL
WP8 – Improvement and equipment of irradiation beam lines
News and brief overview of Beamline plans for the next few months
ITK Strip Module Meeting; 12st October 2015
The Beam Test at Fermilab:
Prototype activities update
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
Kenneth Wraight, Andrew Blue, Kate Doonan & Sam Crawley
Group meeting, 2nd Sept, 2013; JAW
The current plan and a call for some help
2003 test beam with 25 ns bunched muons
Elettra – Sincrotrone Trieste S.C.p.A.
LHC BIF test setup - update
Presentation transcript:

UK-V MeetingPaul John Dervan Irradiation's 2003 Update Paul Dervan Craig Buttar, Simon Dixon, Chris Grigson, Richard Nicholson and the irradiation team UK-V Meeting, RAL 15th July 2003 Latest News Irradiation to date 2003 schedule Contents

UK-V MeetingPaul John Dervan New Irradiation Lab New lab on the ground floor of B.186 New lab is up and running All module tests can be carried out there:  Electrical Stand  Temperature controlled freezer (to be done)  Nitrogen Supply This improves safety, by irradiated modules all being in the same, known place

UK-V MeetingPaul John Dervan New Beam Target New Rotary target robot Just up-stream of cool box Scintillators and films in 5 positions Monitor the beam position by new Camera mounted on the ceiling of T7 (next slide) No more doubts about beam position! (Not that there ever was!) Also, prototype beam profile monitor in shuttle. Will be extended to SCT box after tests

UK-V MeetingPaul John Dervan New Camera New camera in the area Can be remotely moved on 3 axis So beam can be seen on the scintillator on the front of the box and on the rotary target

UK-V MeetingPaul John Dervan Schedule *** *** High fluence run (4 spills per cycle) for pixels

UK-V MeetingPaul John Dervan P1A (19 th May – 6 th June) Barrel (from LBNL)Barrel (from SCAND) High gain spread chip Oscillates

UK-V MeetingPaul John Dervan Fluence for P1A Easy run. No major problems with the beam. 2 spills per Super-cycle day/night. 20GeV beam due to broken transformer in the septum that extracts beam into the East Hall.

UK-V MeetingPaul John Dervan Module Currents for P1A Module B0041 tripped at about ½ fluence. Was unable to re- power it so it stayed un-powered but biased for the rest of the run.

UK-V MeetingPaul John Dervan High Gain Spread Chip Study Before Irradiation After Irradiation

UK-V MeetingPaul John Dervan High Gain Spread Chip Study BeforeAfter ChipGainRMSGainRMS M S S S S E M S S S S E Barrel had a high gain spread chip (S2), before irradiation, 8.89 After Irradiation this had reduced to But only one module so far! Another module with a high gain spread chip is being irradiated in P1B-P1C (now). Both these modules will go into the next test-beam

UK-V MeetingPaul John Dervan P1B-P1C (25 th June – 11 th July) Barrel (Oscillates) Barrel (Gain Spread) Forward Geneva

UK-V MeetingPaul John Dervan Fluence for P1B-P1C Not reached fluence yet. But lots of problems with the PS and accelerator complex. Only one spill for most of the run, until the end where we got 2 to get us to target fluence.

UK-V MeetingPaul John Dervan Module Currents for P1B-P1C Currents look good. No problems with the modules in this run (so far).

UK-V MeetingPaul John Dervan Summary Annual service of T7 was done in January New rotary target station installed and working New Camera is installed and working well New lab is ready The high gain spread on chips seems to go away with irradiation. But only seen one module! Oscillating modules will be studied as soon as possible Third Irradiation of 2003 starts on 25 th July.