WP3 Quality Steve Fisher / RAL 25/9/2003. WP3 Steve Fisher/RAL - 4/9/2003R-GMA2 Code Problems –Unit tests are not enough –WP3 testbed is currently too.

Slides:



Advertisements
Similar presentations
LNL M.Biasotto, Roma, 22 novembre Some notes on WP6 INFN Testbed.
Advertisements

WP3 WP3 17/9/2002 Steve Fisher / RAL. WP3 Steve Fisher 17/9/2002WP32 Summary Quality Current status 1.2 R-GMA in release 2.0 Recent Requirements Work.
Getting Your Web Site Found. Meta Tags Description Tag This allows you to influence the description of your page with the web crawlers.
Extreme Programming Alexander Kanavin Lappeenranta University of Technology.
Coding. Steps to Success 1.Create a PLAN including a detailed statement of requirements (SORs) 2.Write algorithms based on the SORs 3.Write pseudocode.
Software Delivery. Software Delivery Management  Managing Requirements and Changes  Managing Resources  Managing Configuration  Managing Defects 
Grid and CDB Janusz Martyniak, Imperial College London MICE CM37 Analysis, Software and Reconstruction.
Mike Azocar Sr. Developer Technical Specialist Microsoft Corporation
Software Testing. Overview Definition of Software Testing Problems with Testing Benefits of Testing Effective Methods for Testing.
VisIt Software Engineering Infrastructure and Release Process LLNL-PRES Lawrence Livermore National Laboratory, P. O. Box 808, Livermore,
Lisa M. Cochran MGMT580PA Quality Management & Statistical Analysis Southwestern College Dr. Michael Corriere 13 June 2012.
IPv6 testing plans 25 Jan Short term – next 6 weeks Add sites to testbed – Glasgow (DPM storage end point) – Fix DESY – Others? Is GridFTP mesh.
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 DataGrid Quality Assurance On behalf.
Andrew McNab - Manchester HEP - 22 April 2002 UK Rollout and Support Plan Aim of this talk is to the answer question “As a site admin, what are the steps.
Prepare Your Academy for 2013
EGEE is a project funded by the European Union under contract IST JRA1 Testing Activity: Status and Plans Leanne Guy EGEE Middleware Testing.
DataGrid is a project funded by the European Commission under contract IST GridPP-2 Middleware 4 th -5 th Mar 2004 Information and Monitoring.
Thoughts on the ATF of the DataGrid 24 th –25 th May 2001 Steve Fisher / RAL.
Computing and LHCb Raja Nandakumar. The LHCb experiment  Universe is made of matter  Still not clear why  Andrei Sakharov’s theory of cp-violation.
Olof Bärring – WP4 summary- 6/3/ n° 1 Partner Logo WP4 report Status, issues and plans
End HomeWelcome! The Software Development Process.
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
AWIPS II Update Shannon White. AWIPS I Status Due to the AWIPS II transition, only critical bug fixes have been deployed in the last year With the delay.
WP3 Quality – Some ideas Linda Cornwall WP3 meeting 15 th January 2004.
What is the ideal learning environment?.  We think the school have to think about learning in groups and with technology, also the school have to think.
Configuration Database MICE Collaboration Meeting 28, Sofia David Forrest University of Glasgow Antony Wilson Science and Technology Facilities Council.
Barriers To Communication And Ways To Overcome These Barriers
13 May 2004EB/TB Middleware meeting Use of R-GMA in BOSS for CMS Peter Hobson & Henry Nebrensky Brunel University, UK Some slides stolen from various talks.
WP3 Information and Monitoring Steve Fisher / RAL 23/9/2003.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group work status for 1.2 release Andrea Formica on behalf of Test Group.
Trafficking process. My client has approved the PlaceLocal ad, what next? For sites using the Insertion Order (IO) system: An ad number is needed before.
Franck Bonnassieux- WP7- n° 1 WP7 Budapest Collaboration with Dante Monitoring & R-GMA GridFTP Logging Network Cost Function MapCenter & TopoGRID Future.
WP3 Quality (Updated) Steve Fisher / RAL 25/9/2003.
WP3 Authorisation Steve Fisher / RAL 2/4/2003. WP3 Steve Fisher/RAL - 2/4/2003Authorisation2 I don’t think I disagree (much) with Linda Control must be.
Meeting Management/Planning. Today Go over basics of meeting management Introduce key elements of creating a plan.
Grid Deployment Board – 10 February GD LCG Workshop Goals Give overview where we are Stimulate cooperation between the centres Improve the communication.
INFSO-RI Enabling Grids for E-sciencE Information and Monitoring Status and Plans Plzeň, 10 July 2006 Steve Fisher/RAL.
Tier1A Status Andrew Sansum 30 January Overview Systems Staff Projects.
WP3 RGMA Deployment Laurence Field / RAL Steve Fisher / RAL.
DGC Paris WP2 Summary of Discussions and Plans Peter Z. Kunszt And the WP2 team.
Task 3. Writing a dialogue Skills building 3: writing a dialogue  not too colloquial  not too redundant  descriptive The language you use in writing.
2-Sep-02Steve Traylen, RAL WP6 Test Bed Report1 RAL and UK WP6 Test Bed Report Steve Traylen, WP6
Andrew McNab - Manchester HEP - 17 September 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –“How much of the Testbed has.
UHCS 2005, slide 1 About Continuous Integration. UHCS 2005, slide 2 Why do you write Unit Test ? Improve quality/robustness of your code Quick feedback.
What is regression testing? Regression testing is a type of testing that ensures there are no defects/issues in exiting functionality because of new change.
15-Feb-02Steve Traylen, RAL WP6 Test Bed Report1 RAL/UK WP6 Test Bed Report Steve Traylen, WP6 PPGRID/RAL, UK
WP1 Status and plans Francesco Prelz, Massimo Sgaravatto 4 th EDG Project Conference Paris, March 6 th, 2002.
INFSO-RI Enabling Grids for E-sciencE gLite Test and Certification Effort Nick Thackray CERN.
JRA1 Testing Current Status Leanne Guy Testing Coordination Meeting, 13 th September 2004 EGEE is a project funded by the European.
Testbed Release Criteria and Plans WP8 Loose Cannons & App Representatives.
WP3 Hello Steve Fisher / RAL 14/1/2004. WP3 Steve Fisher/RAL - 14/1/2004Hello2 Safety If fire alarm goes off – leave If klaxon sounds – close windows.
WP3 EGEE Steve Fisher / RAL 14/1/2004. WP3 Steve Fisher/RAL - 14/1/2004EGEE2 Credits My slides have been stolen from many sources including: –Fabrizio.
EGEE is a project funded by the European Union under contract IST The UK Cluster Steve Fisher / RAL JRA1 meeting at Cork, 19/ April
CERN 1 DataGrid Architecture Group Bob Jones CERN.
WP3 WP3 at Budapest 2/9/2002 Steve Fisher / RAL. WP3 Steve Fisher/RAL - 2/9/2002WP3 at Budapest2 Summary News –EDG Retreat –EDG Tutorials –Quality –Release.
WP3 Relational Work Progress Report 11/5/2001 Steve Fisher / RAL.
INFSO-RI Enabling Grids for E-sciencE Information and Monitoring Status and Plans GridPP-DB, IC London, 12 July, 2007.
MEWT 2 13 th September Regression Testing: The Bane of the Tester Paul Berry (written on the train)
Dave Newbold, University of Bristol21/3/2001 (Short) WP6 Update Where are we? Testbed 0 going (ish); some UK sites being tried out for production (mostly.
Developers Users Committers How do I configure this now? Just one more fix and I am done! CVS Download/Use Software Submit problems/ request features Store.
Progile Automated Verification Engineer • PAVE •
Sergio Andreozzi + ValerioVenturi
OpenSAF Developer Days 2008 OpenSAF Release Management Session 15-07
Leanne Guy EGEE JRA1 Test Team Manager
Find the Best Concrete Cutting Contractor in Melbourne
Google Analytics.
LDAP monitoring status
Software Requirement and Specification
How to select a research topic
Presentation transcript:

WP3 Quality Steve Fisher / RAL 25/9/2003

WP3 Steve Fisher/RAL - 4/9/2003R-GMA2 Code Problems –Unit tests are not enough –WP3 testbed is currently too small to find some of our problems –Delays in getting things installed Solutions –Unit tests are cheap – so write a lot –Should we go for less sites but with multiple CE and SE per site? –We need the resilience framework. –Don’t introduce a major change before a previous one has been fully tested on a significant testbed. –Don’t release code just before going on holiday

WP3 Steve Fisher/RAL - 4/9/2003R-GMA3 Performance Problems –See Antony’s talk –Must have alarms set up –Must be totally automatic Solutions –See Antony’s talk

WP3 Steve Fisher/RAL - 4/9/2003R-GMA4 Documentation Problems –How to keep it up to date –How to make sure it is useful Solutions –Ensure that bugs are submitted to Bugzilla

WP3 Steve Fisher/RAL - 4/9/2003R-GMA5 Support / Skills Problems –Ideally we would all be experts at everything and totally interchangeable “black boxes” –Jacks of all trades –People leave, are ill, take holidays Solutions –Revisit skills matrixskills matrix