2006/07/20 MJJ Collimator control for the SPS beam test Michel Jonker AB/CO TC 2006/07/20.

Slides:



Advertisements
Similar presentations
“LHC Controls for Sector Test” Planning SPS Extraction Kicker and Septa LHC Injection Kicker and other equipment (beam stoppers, dumps,...) Etienne CARLIER.
Advertisements

01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
CDF Silicon Workshop th May 2006 New BLM & BLM electronics Jose E. Garcia, Jennifer Gimmell, Ulrich Husemann.
A new servo controller for a Materials Testing Machine - MTM Final Presentation B Students : Uri Goldfeld & David Schwartz Supervisor : Daniel Alkalay.
Yu. Artyukh, V. Bespal’ko, E. Boole, V. Vedin Institute of Electronics and Computer Science Riga, LATVIA 16th International Workshop on Laser.
Wireless Data Acquisition for SAE Car Project by: J.P. Haberkorn & Jon Trainor Advised by: Mr. Steven Gutschlag.
ELI: Electronic Timing System (ETS) at Facility Level E L I – B L – – P R E – B.
RWA, 22/9/2005 Controls for the LHC Collimation System September 22 nd, 2005 Collimator Controls Specification Team (COCOST) started in April 2005 after.
1 Highly confidential – do not distribute 360°SIMS – In Line System Main Components.
The TIMING System … …as used in the PS accelerators.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
IMMW14, Ferney Voltaire, September 2005 (slide 1/35) Experience with configurable acquisition software for magnetic measurement.
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
Distribution of machine parameters over GMT in the PS, SPS and future machines J. Serrano, AB-CO-HT TC 6 December 2006.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
Collimation Meeting Tests on a Fully Assembled TCT Collimator in the HiRadMat Facility M. Cauchi, D. Deboy, on behalf of the Collimation Team.
November 18, 2002Richard Talaga1 Target Hall Instrumentation NuMI Neutrino Beam Devices Instrumentation Review Instrumentation &Communication Overview.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
BCT for protection LHC Machine Protection Review April 2005 David Belohrad, AB-BDI-PI
LHC Machine Protection System Review LHC Machine Protection System Review Oliver Aberle13 April 2005 with input from R. Assmann and R. Losito Ensuring.
Post Mortem Collimators and Movable Objects Michel Jonker Post Mortem Workshop Cern, 16 & 17 January 2007.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
LHC Collimation Project Integration into the control system Michel Jonker External Review of the LHC Collimation Project 1 July 2004.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
LHC Collimators Low Level Control Commissioning Status A Masi, LHC Collimators Low Level Control Commissioning Status LHC Collimators Low Level Control.
BWS electronics design status J.Emery & Luca, Pierre-Jean, Emiliano, Jose, Alexander and all past contributors!
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
LHC BLM Software revue June BLM Software components Handled by BI Software section –Expert GUIs  Not discussed today –Real-Time software  Topic.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
MA CS workshop Adriaan Rijllart1 LabVIEW integration into the LHC control system The LHCLabVIEW.
1 DAQ Update MEG Review Meeting, Feb. 17 th 2010.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
CERN Control Standards Front-End Computer Layer Stéphane Deghaye BE/CO/FE
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
Collimator Controls Readiness of collimators control – from bottom to top State of automated collimator positioning Extended LTC Session 6 - Readiness.
Collimator BPM electronics – Results from the lab, SPS and LHC
LHC Collimators Motor Drive control & Position Readout and survey AB/ATB/LPE 8/11/2006.
Architectural issues M.Jonker. Things to do MD was a success. Basic architecture is satisfactory. This is not the end: Understanding of actual technical.
Software development Control system of the new IGBT EE switch.
Collimators MD: Low-level point of view AB/ATB/LPE 18/12/2006.
Magnetic Measurement Systems for the LHC Dipole Assembly Companies A. Rijllart, J. Billan, J. Garcia-Perez, D. Giloteaux, A. Raimondo, V. Remondino, H.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
BPM stripline acquisition in CLEX Sébastien Vilalte.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
CLIC NI Acquisition and Control Module update CLIC Module Working group meeting Adriaan Rijllart EN-ICE-MTA.
CO Timing Review: The OP Requirements R. Steerenberg on behalf of AB/OP Prepared with the help of: M. Albert, R. Alemany-Fernandez, T. Eriksson, G. Metral,
Summary of the technical stop activities on collimators (w17, 2012) O. Aberle – 07/05/12.
Preparation for Circulating Beam - Part II Collimators (40') Oliver Aberle o Breakdown of tests foreseen in preparation for beam o Equipment folder: tests.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
J.Maalmi, D.Breton – SuperB Workshop – Frascati – September 2010 Electronics for the two-bar test. D.Breton & J.Maalmi (LAL Orsay)
Software for Testing the New Injector BLM Electronics
Beam Wire Scanner (BWS) serial link requirements and architecture
RF acceleration and transverse damper systems
A monitoring system for the beam-based feedbacks in the LHC
Data providers Volume & Type of Analysis Kickers
2007 IEEE Nuclear Science Symposium (NSS)
Beam diagnostics from GSI
Automated Collimation Operation
Development of built-in diagnostics in the RADE framework (EN2746)
Status of muon monitor R&D and construction
LHC BLM Software audit June 2008.
The LHCb Front-end Electronics System Status and Future Development
LIU BWS Firmware status
Presentation transcript:

2006/07/20 MJJ Collimator control for the SPS beam test Michel Jonker AB/CO TC 2006/07/20

2006/07/20 MJJ Dates of the SPS beam tests Dedicated SPS MD to test the LHC collimators in –TT40 (1 x 16 h. extracted beam, collimator robustness test) –LSS5 (2 x 24h. circulating beam, test of collimation principles & physics) Schedule –W40 TT40(October 2…) –W42 LSS5(October 16…) –W44 LSS5(October 30…) –W46 reserve(November 13…) Note: Commissioning of collimators installed in transfer line and LHC Sector 8-1 Electronics available? (one moveable rack?)

2006/07/20 MJJ Objectives of the SPS beam tests TT40 (extracted beam: 6 shots of , W40) –Test with laser vibrometer –Damage tests. (Note test of new jaw design following result of 2004 damage tests) –BCT transmission to test alignment of collimators? LSS5 (circulating beam W42 & W44) –Commissioning of controls, test of sensors, etc. –Collimator calibration (Beam based alignment, LHC BLM’s & electronics) –Impedance measurement (Measure inductive bypass effect) –Halo studies (Tail repopulation studies, LHC BLM’s & electronics) –High current related measurements (Temperature, EM noise signals, cooling…) –Beam loss maps (SPS BLM, recorded at a rate > 1 Hz) –Vacuum pressure measurements ? Detailed program will be worked out by collimation working group after holiday period.

2006/07/20 MJJ Collimator Hardware 3 rd TCS CERN prototype Base support Lower plug-in Upper plug-in Collimator

2006/07/20 MJJ Collimator Hardware  Up to 500 kW impacting on a jaw (7 kW absorbed in jaw)…

2006/07/20 MJJ Collimator Hardware Side view at one end Motor Temperature sensors Gap opening (LVDT) Gap position (LVDT) Resolver Resolver Reference Microphone Vacuum tank + switches for IN, OUT, ANTI-COLLISION CFC Sliding table Movement for spare surface mechanism (1 motor, 2 switches, 1 LVDT)

2006/07/20 MJJ Collimator Hardware Motor Control Stepper Controller Motor Power Drive M 2 phases Step Up/Down Fault Trigger Power Drive control RS485 Motors:Ordered Motor Power Drive:Tender sent out, result half September Stepper Controller:Technology study finished, our choice to be approved

2006/07/20 MJJ Collimator Hardware Position Sensors Resolver LVDT ~ E 1 - E 2 E p Special “Conditioner” Electronics required to filter noise from the signal (sample over a few cycles) i.e. output cannot be plugged into a regular PLC (= slow) ADC module More complications with individual coil readout… Sine wave Generator FRONT-END   P DAC ADC LVDT electronics L V D T. PROFIBUSPLC ADC Sine wave Generator ADC Processor ~ E1E1 E2E2

2006/07/20 MJJ Collimator Control for the LHC –Architecture –Milestones –Where we stand today (in preparation of the SPS tests): low level –Options: PLC / VME / PXI –`recommendations collimator supervisor control room applications link with BLM system –For follow up –Conclusions

2006/07/20 MJJ LHC Collimator Control Architecture Control room software: Management of settings (LSA) Preparation for ramp Assistance in collimator tuning –Based on standard LSA components –Dedicated graphical interface for collimator control and tuning Collimator supervisor: Fesa Gateway to Control Room Software Synchronization of movements Beam Based Alignment –Support building, VME –Takes action on position errors (FB) –Receives timing, send sync signals over fiber to low level (ramp & Alignment) –Environmental Supervision –Communication with BLM using UDP Low level control systems Motor drive Position readout and survey Environment Survey –Down stairs, PLC/VME/PXI? –3 distinct systems / combined?

2006/07/20 MJJ Collimator Control Milestones Basic command-driven controlAugust 2006: Basic command-driven control of single collimators for SPS test, TT40 test and commissioning of transfer line collimators. function-driven, synchronized controlMarch 2007: First tests on function-driven, synchronized control of a collimator ensemble (several 10's of collimators), like required for the LHC. collimator beam-based calibrationAugust 2007: Controls for collimator beam-based calibration. Function- driven, synchronized control for the LHC collimation system for commissioning (no automatic BLM-based setup). March 2008: First tests on automatic BLM-based collimator set-up. Availability of fast automatic BLM-based collimator set-upJuly 2008: Availability of fast automatic BLM-based collimator set-up to allow for efficient machine set-up for luminosity of up to (up to 30% of nominal beam intensity).

2006/07/20 MJJ Low level control Study by A.Masi (+ A.Brielmann, M.Donze) Requirements driving the choice for the low level system: Reliability (collimators protect the machine) Limited rack space (19” x 12U x 400 mm deep rack should house controls for two collimators The jaws positioning a few μ resolution, 20 μ reproducibility Two modes of operation: –Move a jaw by a predefined number of steps, with start synchronized by a (repeatable) digital trigger from CSS (Beam based alignment). –Download in the low level equipment a function (position-time table). Then all jaws will start after receiving the digital trigger (about 400 motors) Possibility to download a new function while the previous is running

2006/07/20 MJJ Low level control Requirements driving the choice for the low level system (cont) Response delay to a digital trigger < 1ms Motors of the same jaw synchronized << 1 ms to reduce vibrations Synchronization between collimators after 15 minutes of a function 10 μ error Possibility to download a new function while the previous is running Acquire LVDT and resolvers within a 20ms cycle, 10 ms if possible, check in real time that the actual position is within a given limit function (synchronized with function execution).

2006/07/20 MJJ Low level control Requirements driving the choice for the low level system (cont) Trigger delay Start jitter Profile duration Stop jitter BLM based setupRamp Trigger delay: <1ms<100ms Start jitter: <1ms<10ms (<1ms on the same jaw!) Stop jitter: <10ms (after 15 minutes) Note: 10 ms 1mm/s => 10 μ error Acquire LVDT and resolvers within a 20ms cycle, 10 ms if possible, check in real time that the actual position is within a given limit function (synchronized with function execution).

2006/07/20 MJJ low level control 1a. Siemens PLC: CPU S7300, + 1 x FM 357-2: 4-axis controller 1b. Siemens PLC: CPU 317, 4 x FM 353: 1 axis controller 2. VME crate Power PC RIO 3 3. PXI system National Instruments Controller Pentium IV 2.0 Ghz 1 Gb RAM, LabView RT 7833R FPGA 3M gates card that hosts the control for 10 stepping motor axis DAQ card bit multiplexed with 16 diff analog input to acquire the output signals of 7 LVDT Timing Card 6608 with 45 ppb clock stability-8 Timers for resolver reading CAN BUS card

2006/07/20 MJJ 3–Performances-Costs Comparison PLC (FM 357-2)VMEPXI Motion Synchronization Some tens ms <1 ms Some tens us Motion Trigger Delay 50 ms0.44 ms84 us Tuning: motion commands updating time 100 ÷150 ms 5 ÷10 ms 10÷20 ms Position survey frequency Some tens Hz> 50 Hz Reliability Solution tested for TDI New cards used VME downstairs No in house experience Space requirements 2 collimators in a rack 19”x12Ux300mm very difficult Special 300 mm deep VME crate Very compact solution Drawbacks Special electronics to be developed for LVDT signals conditioning New cards used not supported DIM is not AB/CO supported Price for 2 coll. ask Purchasing time No market survey ( waiting confirmation from FI ) market surveyNo market survey ( waiting confirmation from FI ) is very well supported by IT/CO

2006/07/20 MJJ low level control Conclusion low level The last collimation project steering meeting, where A.Masi presented the results from the study, adopted the recommendation to proceed with the PXI solution, based on the following criteria: Space, performance and delay for purchasing & implementation Feedback and advice welcome before final decision. Other recommendations: Use this option in the SPS beam test to gain further experience. investigate the user experience of this technology in other industrial domains. On the long term, in case DIM solution is inadequate, replace DIM with IEPLC or by corba/RDA/CMW

2006/07/20 MJJ Motors Synch HistorySupervisor ctrp FESA collimator supervisory system Responsible: M.Sobczak PLC Environmental data Environment IEPLC FESA Low Level System, motor control, position acquisition Fiber links cmw Position cmw NetRelay Debug application CCC applications: Trim Display Logging implemented projected BLM UDP BLM Private Logging

2006/07/20 MJJ collimator supervisory system Current Status: Implementation of Collimator Supervisory System, controlling: Motor position (No function, no critical settings, no position survey) Motor Synchronisation History recording FESA Server for Control room applications Properties definitions to be finalized Position readout to be implemented BLM transient reading and recording to be implemented Environmental Parameter readout (integrate or resurrect old FESA classes) Replacement of FESA interface to low level (after beam test)

2006/07/20 MJJ Control room application Baseline solution (S.Redaelli) Graphical interface that talks directly to the FESA class of the CSS Single collimator control unit, graphical design (S.Redaelli)

2006/07/20 MJJ CSS collimator Control room application Preferred solution (S.Redaelli + help of LSA team members): Graphical interface based on LSA core facilities (discrete Settings trim) Avoid creation of “exotically” structured control parameters (use a test server for discrete setting parameters as an example/template) Base this on the class structure and collimator data entered in the LSA database (as define by S.Redaelli).

2006/07/20 MJJ BLM requirements Logging/recording of SPS BLMs with frequency > 1 Hz –Precise time stamping Logging/recording of LHC BLM’s with same frequency Recording of motor movement induced transients: n samples over period of 20 – 500 ms. (B.Dehning et. Al.) –LHC BLM electronics (prototype) with a history buffer of 32 samples over a selectable time period (20ms, 80 ms, 320 ms…) (C.Zamantzas) –Sending history in UDP data packet upon timing interrupt (S.Jackson) –Timing interrupt by common timing event or by external trigger from CSS. To be provided by CO: –Library to set up UDP communication with CSS (M.Jonker)

2006/07/20 MJJ For Follow up TT40: Collimator under construction (waiting for parts of Cerca, 3 hours access to install) Use midi electronics and control system of 2004 Cables for microphone and Laser accelerometer (S.Redaelli +?) (Re)install local PC for remote access Resurrect environmental control PLC + Fesa Classes (R.Losito, M Sobczak) Microphone readout by NAOS, triggered by extraction event (NEW) Mr? In parallel to standard readout by sound card Logging of all measurement data

2006/07/20 MJJ For Follow up LSS5: Collimator already in place, need to be equipped with new LVDTs, new motors (if possible, under study by O.Aberle) Add cabling of new LVDT’s (R.Losito) Use similar power driver as the one that will be selected by tender Motor control and Acquisition based on IPX system (R.Losito, A.Masi) Environmental survey, use PLC system of 2004 (R.Losito) FESA classes for environmental survey data to be resurrected, possibly integrated into CSS (M.Sobczak)

2006/07/20 MJJ For Follow up CSS: (M.Sobczak) Define Fesa Interface with High Level (S.Redaelli) Add position readout and recording Add BLM transient recording client Install FESA Gateway PC with CTRP + timing in LSS5 (M Vanden Eynden) Install synchronisation signals with Low Level Add/install synchronisation mechanism with BLM recording CCC applications: beyond the baseline solution (S.Redaelli) Interactive application based on LSA discrete setting trim application –Fesa test server for discrete (japc) setting parameters (template for Css Fesa Properties) (M.Lamont) –Help required for S.Redaelli to create interactive application based on LSA core (M.Lamont) Standard logging for all Collimator parameters Sequencing for repeated collimator movements?

2006/07/20 MJJ For Follow up BLM: Recording with > 1 Hz of SPS beam loss Recording of BLM transient data UDP communication library Logging: Recording off all Collimator related data Dry run: Test of all required software before the SPS MD’s COCOST: (COllimator COntrol Specification Team) will start regular meetings. First priority SPS beam test

2006/07/20 MJJ Conclusion Still work to do for the SPS beam test Most urgent decision to be taken: Endorsement of the PXI solution for the SPS beam test With the low level defined we can now proceed more clearly towards our goal.