+ Micromegas in ATLAS: status update of DAQ integration and plans Marcin Byszewski On behalf of the MAMMA collaboration. 25/09/2012 MAMMA extended M. Byszewski(CERN)

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
Large-size micromegas for ATLAS (MAMMA) Status and prospects RD51 mini week, 17/01/2011Joerg Wotschack (CERN)1.
July test beam DAQ status Marcin Byszewski Konstantinos Ntekas.
DAQ System at the 2002 ATLAS Muon Test Beam G. Avolio – Univ. della Calabria E. Pasqualucci - INFN Roma.
Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory14 September 2000LEB2000 Krakow The Front-End Driver Card for CMS Silicon Microstrip.
CF 8/June/2003 ATLAS muon week in Gallipoli 1 The 1 st Beam Test of TGC electronics at H8 in May/June ‘03 Chikara Fukunaga on behalf of TGC electronics.
BOE/BME – MDT: DCS For the 2 BOE, DCS needs to handle 2 x 2 HV (1 ch/multilayer) 2x LV 2x JTAG, associated 2 MDMs/ELMBs Monitoring of T, B and CSM sensors.
SPHENIX GEM Tracker R&D at BNL Craig Woody BNL sPHENIX Design Study Meeting September 7, 2011.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
1 20/02/12 SRS News SRU Revision, New Hybrids, DTC, Firmware, … Sorin Martoiu, CERN PH/DT SRS News, Sorin Martoiu, CERN 2012, 9th RD51 Collaboratin Meeting.
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
+ discussion in Software WG: Monte Carlo production on the Grid + discussion in TDAQ WG: Dedicated server for online services + experts meeting (Thusday.
14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 1 The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System Introduction Overview.
1 UA9 September 2010 test beam Si telescope hardware status Mark Raymond – 3/9/10.
SRS Readout System for VMM2 Sorin Martoiu, IFIN-HH (RO)
ATLAS Read Out Driver Aloisio, Capasso, Della Pietra, della Volpe, Izzo.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
M. Bianco On behalf of the ATLAS Collaboration
1 DAQ Update MEG Review Meeting, Feb. 17 th 2010.
Some thoughts on the New Small Wheel Trigger Issues V. Polychronakos, BNL 10 May,
ATLAS micromegas activities (MAMMA)
News on GEM Readout with the SRS, DATE & AMORE
LHCb front-end electronics and its interface to the DAQ.
APV25 Electronics for GEMs at UVa and for the 12 GeV Upgrade Program in HallA at JLab RD51 Electronic School, February 3-5, 2014 Kondo Gnanvo University.
28 June 2004ATLAS Pixel/SCT TIM FDR/PRR1 TIM tests with ROD Crate John Hill.
+ Running Micromegas in ATLAS: status update of DAQ integration and plans Marcin Byszewski On behalf of the MAMMA collaboration. 9/10/2012 MM weekly M.
+ Running Micromegas in ATLAS: status update of DAQ integration and plans Marcin Byszewski On behalf of the MAMMA collaboration. 2/10/2012 RD51 Stony Brook.
SoLiD/PVDIS DAQ Alexandre Camsonne. DAQ limitations Electronics Data transfer.
SRS Activities at IFIN-HH: VMM2 Hybrid, FECv6 Firmware, High- Density Optical ATCA-SRS Mezzanine Sorin Martoiu, Michele Renda, Paul Vartolomei (IFIN-HH.
Florida Institute of Technology, Melbourne, FL
HOLA installation in USA15. Status 8 Pixel + 8 SCT HOLAs installed in USA15 DAQ channels connected to the ROSes FTK fibers laid under the floor and placed.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Data transfer performance of SRS (J-PARC E16 Experiment) YUHEI MORINO RIKEN Nishina Center 1.
MMDAQ Content – Overview – Case study – adding support for VMM1 chips – Drawings (data flow, concurrency, error reporting, scalability, monitoring) 13.
CGEM-IT project and beam test program G. Felici for the FE-LNF-TO team Partially supported by the Italian Ministry of Foreign Affairs under the Program.
Software for the CMS Cosmic Challenge Giacomo BRUNO UCL, Louvain-la-Neuve, Belgium On behalf of the CMS Collaboration CHEP06, Mumbay, India February 16,
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Chambers to be installed in ATLAS MSW on Small Wheel MBT0 on front-face of end-cap electromagnetic calorimeter.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
LHC CMS Detector Upgrade Project RCT/CTP7 Readout Isobel Ojalvo, U. Wisconsin Level-1 Trigger Meeting June 4, June 2015, Isobel Ojalvo Trigger Meeting:
ECFA Workshop, Warsaw, June G. Eckerlin Data Acquisition for the ILD G. Eckerlin ILD Meeting ILC ECFA Workshop, Warsaw, June 11 th 2008 DAQ Concept.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Integration with ATLAS DAQ Marcin Byszewski 23/11/2011 RD51 Mini week Marcin Byszewski, CERN1.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
LECC2003: The 96 Chann FED Tester: Greg Iles30 September The 96 channel FED Tester Outline: (1) Background (2) Requirements of the FED Tester (3)
TRTViewer: the ATLAS TRT detector monitoring and diagnostics tool 4 th Workshop on Advanced Transition Radiation Detectors for Accelerator and Space Applications.
MICROMEGAS per l’upgrade delle Muon Chambers di ATLAS per SLHC Arizona, Athens (U, NTU, Demokritos), Brookhaven, CERN, Harvard, Istanbul (Bogaziçi, Doğuş),
TDAQ status and plans for 2008 Carlos Solans TileCal Valencia meeting 17th December 2007.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
PRAD DAQ System Overview
Atlas: Upgrade Phase I Massimo Della Pietra.
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Experience with DAQ for ATLAS SCT
Micromegas for the ATLAS Muon System Upgrade
mmDAQ (Muon Atlas MicroMegas Activity – ATLAS R&D)
Preliminary Performance of the L2 Chamber (Side A)
Large CMS GEM with APV & SRS electronics
TTC system and test synchronization
ATLAS Canada Alberta Carleton McGill Montréal Simon Fraser Toronto
Example of DAQ Trigger issues for the SoLID experiment
TDAQ commissioning and status Stephen Hillier, on behalf of TDAQ
Commissioning of the ALICE-PHOS trigger
The CMS Tracking Readout and Front End Driver Testing
Presentation transcript:

+ Micromegas in ATLAS: status update of DAQ integration and plans Marcin Byszewski On behalf of the MAMMA collaboration. 25/09/2012 MAMMA extended M. Byszewski(CERN) David Berge, Raffaele Giordano, George Glonti, George Iakovidis, Paolo Iengo, Vincenzo Izzo, Kostas Kordas, Antonios Leisos, Sabrina Perrella, Givi Sekhniaidze, Ourania Sidiropoulou, Mimmo della Volpe, Andre Zibell SRS development: Hans Muller, Sorin Martoiu, Alfonso Martinez (ALICE)

+ The Goal Compare data from the test chambers with ATLAS data (take these data with no impact on ATLAS data taking) 1. Stand-alone, random trigger (until September 2012) Convenient, Track matching not possible 2. Trigger from ATLAS, data separate (‘parasitic’) Offline synchronisation 3. Fully integrated with TDAQ in ATLAS partition Most of our event fragments empty A lot of discussions and support from CTP / TDAQ / run coordination / Sysadmins. Thank you. 25/09/2012 MAMMA extended M. Byszewski(CERN) 2

+ Micromegas test chambers Front of the LAr calorimeter cryo r ≈ 1 m z = 3.5 m One 9x4.5 cm 2 X-V (2 readout gas gaps) r = m Four 9x9 cm 2 chambers X, Y, XY, XUV Only three read out 1 FEC limit Power supply limits and SRU firmware MBTS, side ASmall Wheel, sec. 9, side A, CSC 25/09/2012 MAMMA extended M. Byszewski(CERN) EIL1 MDTs Installed Feb 2012, read out in stand-alone random trigger mode MBTS LAr Test chambers description and readout in stand alone mode see Joerg Wotschack’s presentation in Run Weekly 24/7/

+ Rates / Occupancy / data size Rates: ≈20 kHz/cm L=10 33 cm -2 s -1 7 strips (16 time bins) 10kHz readout (100kHz * 0.1 due to slow readout) Up to 10MB/s by varying time window and data reduction mode (36GB/h) Total data: for 10 weeks, 5 days, 10h runs 17 TB of LV1 data Rate: 30 Hz/cm L = cm -2 s - 1 Majority (90%) of events with uncorrelated hits 25/09/2012 MAMMA extended M. Byszewski(CERN) MBT0SW 4

+ Current readout: ½ ROD SRS – based ROD: RD51’s SRS system APV25 chips (CMS Si tracker) (16+4) HDMI cables (10) SRS FEC (ADC, Ethernet) Data to a DAQ PC in USA15 25/09/2012 MAMMA extended M. Byszewski(CERN) APV25 FEC (ADC/Eth ernet) FEC (ADC/Eth ernet) Switch (Cu  Optical) Switch (Cu  Optical) DAQ PC USA 15 UX 15 HDMI Ethernet fibre Slow control + Data Cu 5

+ SRS – based Readout Front end electronics: APV25 chips (CMS tracker, no other choice) HDMI cables (LV, data) ROD in UX15: SRS FEC – digitization, peak finding, zero suppression DTC link to SRU SRU – EB, TTC, LV1, DCS, SLINK USA15 CSC TTC, DATA, DTC fibres Run Control Application (on RC PC) ROS DCS(ACR Muon Desk, CSC infrastructure) 25/09/2012 MAMMA extended M. Byszewski(CERN) APV25 ROS USA 15 UX 15 SLINK SRU FEC (ADC/Eth ernet) FEC (ADC/Eth ernet) RC PC Local Switch (Cu  Optical) Switch (Cu  Optical) Ctrl TTC CSC ROD 6

+ Configuration (1): TDAQ 1) Fully integrated solution required much more work (MM and TDAQ) without clear advantage for data analysis. 2) Parasitic mode LVL1A from CSC TTC crate Sub-detector ID : RPC 0x65 (side A), data channel 0xFF (non- existent, ignored by decoder) Separate MM partition for ROS local storage Offline synchronization with ATLAS data 3) Parasitic with RCD in ATLAS partition Send UDP packages to our ROD (e.g., to set RunNumber) (Always returns with success) 25/09/2012 MAMMA extended M. Byszewski(CERN) ROS RC PC Local ATL RC 7

+ Configuration (2): parasitic We will have all the data we measure There is no way of getting LV2/EF information to our ROS (event selection) Must store LV1 data as long as needed to get ATLAS accepted LV1 1TB storage for temporary data (all our LV1, a few days of data taking) 25/09/2012 MAMMA extended M. Byszewski(CERN) 8

+ Configuration (3): ROD Not in ATLAS partition MM partition fully described in TDAQ OKS database Answer every LV1 trigger Reading out 10% of LV1 triggers (slow APV data transfer) Pre-selection on SRU possible Send only events with APV data Possibly select on FEC event size We could switch back into fully integrated mode and serve all LV1 if in ATLAS partition 25/09/2012 MAMMA extended M. Byszewski(CERN) APV25 FEC (ADC/Eth ernet) FEC (ADC/Eth ernet) ROD (1) SRU FEC (ADC/Eth ernet) FEC (ADC/Eth ernet) ROS 9

+ Run Modes Physics ATLAS LV1, 10% Data to SLink-ROS-RC PC-HDD Offline synchronisation of LV1 Throttled data transfer to storage (Castor) All APV / SW-only runs Calibration Off-run Internal / CSC triggers On FEC measurement of ZS pedestals RC PC storage of pedestals (read from FEC) APV calibration (rare) Internal triggers ZS in bypass mode SRU in bypass mode to Ethernet port Display / Verify raw APV frames 25/09/2012 MAMMA extended M. Byszewski(CERN) FEC SRU RO S RC Local ETH ATL CTRL net Castor CSC TTC Slow control SLINK ctrl Eth Throttled 10

+ Run Modes Physics ATLAS LV1, 10% Data to SLink-ROS-RC PC-HDD Offline synchronisation of LV1 Throttled data transfer to storage (Castor) All APV / SW-only runs Calibration Off-run Internal / CSC triggers On FEC measurement of ZS pedestals RC PC storage of pedestals (read from FEC) APV calibration (rare) Internal triggers ZS in bypass mode SRU in bypass mode to Ethernet port Display / Verify raw APV frames 25/09/2012 MAMMA extended M. Byszewski(CERN) FEC SRU RO S RC Local ETH ATL CTRL net ATL CTRL net Castor CSC TTC CSC TTC Slow control SLINK ctrl Eth Throttled 11

+ Run Modes Physics ATLAS LV1, 10% Data to SLink-ROS-RC PC-HDD Offline synchronisation of LV1 Throttled data transfer to storage (Castor) All APV / SW-only runs Calibration Off-run Internal / CSC triggers On FEC measurement of ZS pedestals RC PC storage of pedestals (read from FEC) APV calibration (rare runs) Internal triggers FEC ZS in bypass mode (RAW data of one APV) SRU in bypass mode (to Ethernet port) Display / Verify raw APV frames 25/09/2012 MAMMA extended M. Byszewski(CERN) FEC SRU RO S RC Local ETH ATL CTRL net ATL CTRL net Castor CSC TTC CSC TTC Slow control SLINK ctrl Eth Throttled 12

+ Offline synchronisation Before data analysis Save all RAW events ATLAS synchronisation at our convenience Max of 16TB of data (SW+MBTS) for 10 weeks of 10h ATLAS runs daily We will get that space Throttled speed of output to storage will limit data taking Unless: Dedicated SW runs Automatic Synchronise “on the fly” Extract LV1 from accepted ATLAS events (delay of few days, ATHENA) Select matching events and delete other Run storage job Limits: Storage buffer size, disk r/w speed, CPU speed, output speed, limited access to P1 network 25/09/2012 MAMMA extended M. Byszewski(CERN) RC ATL CTRL net ATL CTRL net Castor Throttled 13

+ Current status Readout synchronised with ATLAS triggers There is no way of getting LV2/EF information from TDAQ 1 FEC (MBT0 + SW chambers) Power supply RC-PC with storage space is being prepared Time to debug 25/09/2012 MAMMA extended M. Byszewski(CERN) 14

+ Next steps: to data analysis Run planning to be made (10 weeks) MBT0/SW runs dedicated SW runs (re-cabling 4 th chamber ?) DAQ commissioning Verify APV settings (raw data) Verify FEC ZS pedestals Stability (not to disturb the Muon shifter’s sleep) Write data decoder (ATLAS -> ROOT for EventBrowser) Data preparation / Offline Synchronisation Select based on Timestamp + LV1ID (ATLAS and MM) Select events with CSC tracks ATHENA jobs Data analysis (Write Manual / Documentation) 25/09/2012 MAMMA extended M. Byszewski(CERN) 15

+ Thank you Call for expression of interest DAQ verification / debugging Data preparation Data analysis Continuing interest : Andre, Antonis, Kostas, Ourania 25/09/2012 MAMMA extended M. Byszewski(CERN) 16

+ Backup slides 25/09/2012 MAMMA extended M. Byszewski(CERN) 17

Micromegas principle  Parallel-plate chamber Conversion & drift region (typically a few mm) with moderate electric field of 100–1000 V/cm Amplification in a narrow (128 µm) gap with high electrical field (40–50 kV/cm)  With drift velocities of 5 cm/µs (or 20 ns/mm) electrons need 100 ns drift time to reach the mesh (for a 5 mm gap)  By measuring the arrival time of the signals a MM functions like a TPC => Track vectors for inclined tracks 25/09/2012 MAMMA extended M. Byszewski(CERN) 128 µm 5 mm 18

+ SRU Virtex 6, TTCrx chip, 4 SFP ports 40 DTC links EB, and TTC LVL1 Accept treatment Process first, buffer others TTC SRU uses onboard TTCrx chip to receive BC clock, L1A, ECR, BCR and trigger type Connect to CSC TTC partition with unique TTC address Additional user-programmable offset value for BCID S-LINK HOLA emulator on Virtex 6 board 25/09/2012 MAMMA extended M. Byszewski(CERN) 19

+ Some typical events displays 25/09/2012 MAMMA extended M. Byszewski(CERN) L = 3.3 x cm -2 s -1 L = 3.3 x cm -2 s -1 x strip number Charge MBT0_3 MBT0_4 Charge Time (25 ns) Charge x strip number Uncorrelated hit (≈1/1000 triggers with activity) (≈each trigger with activity) 20

MBT chambers (LAr ecal) 25/09/2012 MAMMA extended M. Byszewski(CERN) LAr Calor. MBT0_3 MBT0_4 MBTS MBT0 R ≈ 1 m 2 drift gaps of 4.5 mm each 2 x 190 x(phi)-strips (0.5 mm pitch) 2 x 66 v-strips (1.5 mm pitch) APV25 15 mm 150 mm 200 mm Drift electrode Active area 9.5 x 4.5 cm 2 Z ≈ 3.5 m 21

MMs on Small Wheel II 25/09/2012 MAMMA extended M. Byszewski(CERN) R16, chamber with 2D readout active area: 9 x 9 cm 2 R16 90 mm R13x R16xy R18y R19xuv CSC (large) Not yet read out Pitch (µm) R13–R R19x350 R19u,v100 22

+ 25/09/2012 MAMMA extended M. Byszewski(CERN) 23

+ 25/09/2012 MAMMA extended M. Byszewski(CERN) 24