BOOSTER ORPHAN CABLES Georgi Minchev Georgiev EN-EL-CF 08/10/2015 General De-cabling Project Meeting #4.

Slides:



Advertisements
Similar presentations
FESA 3 Implementation Status Stephane Deghaye BE/CO On behalf of the FESA team and many users.
Advertisements

Decimal Addition What is going on? (carry) (subtract the base)
LIU CABLING & OPTICAL FIBRES STRATEGY Georgi Minchev Georgiev EN-EL-CF.
LS1 Cabling Progress LS1 Committee (LSC) – 21 June 2013 Daniel RICCI on behalf of the Cabling and Optical Fibre Section (EN-EL-CF) EDMS
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Barriere O, Le Roux P
Injector De-cabling Project Project Team Meeting #
Injector De-cabling Project Enlarged meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
Fraunhofer Test-Campaigns March 25 th 2013 (R2E) Mitigation Project: RadWG March 25 th 2013 FRAUNHOFER Test-Campaigns & Facilities M. Brugger.
1 st R2E RADIATION SCHOOL & WORKSHOP Some Organisational Issues.
Photo Album by User
Status and first objectives 14/06/2012Jean-Christophe Garnier1.
Injector De-cabling Project Enlarged meeting # E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project Team.
(1/8) J. Mekki RadWG meeting – 03/02/2015 CHARM facility update 03/02/2015.
Building 867 Project TE/MPE workshop status and schedule Presented by Tony Fowler, TE-ABT on behalf of the Project Team 28/09/2010Building 867 Project:
Injector De-cabling Project Enlarged project meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
Controls Renovations and End of Life (EoL) plan of major components of the controls infrastructure Eugenia Hatziangeli.
YETS COMPLEX PS 2015/2016 Travaux EN/EL/CF P. LELONG, J-M. LASSAUCE & G. GEORGIEV 12 Novembre 2015.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
 Minutes approval, follow-up from last meeting (O. Brunner) 10'  Report from coordinator (J.M. Jimenez) 10'  Progress reports from all task leaders.
East Area BTV upgrade 2015_09_03 S.Burger BE-BI-PM V.Clerc EN-MEF-SI I.Francescut BE-BI-ML V.deJesus EN-MEF-SI M.Lazzaroni EN-MEF-EBE … F61 line.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
YETS PS&TT2 list of works planned and planning Simon Mataguez EN/MEF-OSS More info about the PS machine? Many thanks.
2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.
Booster identification/disconnections Follow-up Enlarged project meeting, E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project.
The ACCOR Project Status Report and Outlook for 2010 and beyond M.Vanden Eynden on behalf of the ACCOR Project Team 1M.Vanden Eynden (BE/CO) - IEFC Workshop,
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Layout Experimental hall Final status (?) 3rd HIE ISOLDE Physics Coordination Group meeting CERN, 3 September 2012 HIE-ISOLDE Erwin Siesling.
SPS YETS 2015/2016 Planning meeting for BE-BI 09/12/15 David Mcfarlane EN-MEF D.Mcfarlane1.
Injector De-cabling Project Project meeting # 7, S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
SPS YETS 2015/2016 Planning meeting (No.3) 07/10/15 David Mcfarlane EN-MEF D.Mcfarlane1.
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
Mid Term Review Meeting, 26 September * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.
European Organization for Nuclear Research Industrial Controls Engineering Department GUAPI working group meeting May the 6th 2015.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Activities related to BE-BI during LHC-YETS 7 th December, 2015 Maria Barberan, Marzia Bernardini.
SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
LIU-SPS planning – provisional LS1 / LS2 BLM, BPM MKE/MKDV/H aC 1 sextant aC 5 sextants RF 200 MHz LSS3 RF 200 MHz preparation RF 200 MHZ building.
Planned activities during (E)YETS… up to LS2 for PSB-PS equipment Etienne CARLIER On behalf of TE/ABT/EC.
RADWG Meeting April 2015 Salvatore Danzeca EN/STI/ECE.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.
LIU–PLI report LIU Project Team meeting. Follow-up on the Engineering Change Requests Engineering Change Requests for the YETS PSB PS.
Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.
The AWAKE Safety Documentation C. ALANZEAU (editor) & Stakeholders –
Controls Activities & Organisation during LS1 Eugenia Hatziangeli BE/CO LS1 Day – 12 th June 2012 Input from Machine Controls Coordinators (S. Jensen,
Status and Future Perspective of the HIE-ISOLDE Project CERN, November 19-20, 2012
Survey on “Chargés de Consignation” Status Update
SPS LS2 Planning meeting (No.6) 19/07/17
CHARM facility update 23/04/2015
Accelerator Controls Renovation Project “ACCOR”
AFC 2017 (and 2018) AFC timeline:
How to create an Indico Meeting
Injector De-cabling Project
TE-MPE LS1 review Vision from EN-EL(CF)
LIU – EVM status and next steps
Naming convention Rules
Planning and Installation
De-cabling strategy during YETS
C.Carli Budget and Planning ELENA Project Review, 15th October 2013
Update on the Ethernet Network Installation Campaign
Georgi Minchev Georgiev EN-EL-FC
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
HIE-ISOLDE Project: Planning & Resources
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC

RADWG Meeting February 2017
Presentation transcript:

BOOSTER ORPHAN CABLES Georgi Minchev Georgiev EN-EL-CF 08/10/2015 General De-cabling Project Meeting #4

What has been done:  0  Photos - G:\Users\c\chapuisf\Public\Booster_Cable_Identification\Cables_ID\Ob solete_Cables_Found\Photos  Two lists,0 separated by groups. 09/10/2015 General De-cabling Project Meeting #4 – G. GEORGIEV2

Results 09/10/2015 General De-cabling Project Meeting #4 – G. GEORGIEV3 Very possible that the majority of these cables are already in the DECs! OLD CABLOGESMAR Systems (group)CablesRemarksCablesRemarksTotal by group EN-EL TE-ABT TE-MPE + TE-MSC TE-VSC TE-EPC BE-CO BE-RF BE-BI EN-STI 36 IT-CS 50 Not-clear 7 BE-BI, TE-EPC?? GRAND TOTAL1539

How to use it : 09/10/2015 General De-cabling Project Meeting #4 – G. GEORGIEV4 TIMING - MCR → BOOSTER TENANTABOUTISSANT Numero SalleRack N.Position N.Cable Type Cable Type Visuel Cable De/Conn ectePhoto SalleRack N.Position N.Cable Type Cable Type Visuel Cable De/Conn ectePhoto 1BCERPPR-6cote droit D1279 ???????? OLD CABLO GESMAR CABLES TROUVES AVEC CORRESPONDANCE GESMAR TENANT CâbleTrStatTypeRéseauDescription1 PF2 PF2 Ouv2 ConnectLongLong R SalleRack N.Position N.CableCable De/ConnectePhoto AVCC50I..BWARNING BIDISPB1B(BCER144B(BCER B50PMA13 BCER239/240dessous D1290

Next step  Verification by users that these cables are not in their DECs; if they are not in:  To add them to the DEC 09/10/2015 General De-cabling Project Meeting #4 – G. GEORGIEV5

The success on this campaign depends on you!

7 Sharepoint: Project/_layouts/15/start.aspx#/Cable%20Lists/Forms/AllItems.aspx?RootFold er=%2FInjector%2DDe%2DCabling%2DProject%2FCable%20Lists%2FBOOS TER&FolderCTID=0x012000AF30760D9E260E42B38373FBA116BABF&View =%7B271EC134%2DBA18%2D41E6%2DAB27%2DAA98AC728D86%7D Indico: 09/10/2015 General De-cabling Project Meeting #4 – G. GEORGIEV