Robert Gray Ave Public Meeting Proposed Sewer Construction May 18, 2015 Tiverton Wastewater District (TWWD) “Our mission is to safeguard public health.

Slides:



Advertisements
Similar presentations
Why Does the Lake Community Need a Sewer Septic tanks are failing. The life expectancy of a septic tank in “ideal” conditions is 20 years. In many cases.
Advertisements

Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
HOUSE BILL 89 ONSITE WASTEWATER STAKEHOLDER MEETING 2 nd meeting September 8, 2011 Crystal Lovett, MO DNR Facilitator, and DNR-DHSS Panel.
On-site Sewage Facility (OSSF) Trends in Texas
Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
Presented to the Connecticut Association of Water Pollution Control Authorities | April 26, 2013 Community Systems 101 Presented by Thom Knowlton, P.E.
Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of.
City of South Burlington City Council Adopted January 12, 2013 FY 2014 Budget - Keys to Financial Success Prepared by Sandy Miller, City Manager and Bob.
1. The installations of grinder pumps and lines from residences on private property to M.D. collection lines is the final link in finishing a project.
AECOM Technical Services, Inc. February 18, 2015 Tiverton Wastewater District Sewer Construction Program Updates to Proposed Phase 1 Sewer Expansion Note:
Wastewater Neighborhood Meetings Code of Conduct: Be willing - participate fully; Be Kind - treat others with dignity and respect; Be open - consider new.
Vance County Water District Overview and Update Jordan McMillen Director Vance County Planning and Development Department 156 Church St. Suite 3 Henderson,
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
Non Powell Bill Street Repair & Maintenance Strategies October 8, 2012.
RETROFIT POLICY FOR GRANT FUNDED PROJECTS Utilities Department Orange County Board of County Commissioners September 23, 2014.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
The coming storm: Managing Roanoke’s Stormwater Infrastructure Challenges Solutions for Roanoke’s future.
Hide-A-Way Lake, Inc. Low Pressure Sewer System Prepared by Dungan Engineering, P.A.
Utility Extension Project
Connecticut Department of Energy and Environmental Protection.
Riverside Drive Public Meeting Proposed Sewer Construction May 13, 2015 Tiverton Wastewater District (TWWD) “Our mission is to safeguard public health.
Renting vs. Owning The Difference Between Renting and Owning a Home.
Failing Septic Systems: Problems and Solutions Protect Our Waters 2003 Legislative Session Minnesota Center for Environmental Advocacy Minnesota Environmental.
Alternative Onsite Sewage Systems: New Regulations & Issues for Localities Potomac Watershed Roundtable January 7, 2011 Thomas E. Crow, Director Division.
BITHLO COMMUNITY WATER Utilities Department Orange County Board of County Commissioners December 18, 2012.
Board of County Commissioners Allen County, Ohio Detailed Planning Assessment Hearing Wednesday, May 30 th, 2001 Presented By: Stephen M. Kayatin, Sanitary.
Neighborhood Meeting Falcon, 124 th, Europa, 126 th, Gallivan (Lake Air Estates/Bald Eagle Estates) Improvement Project December 13, 2010.
IRSDA Conference What Do the Amendments to Indiana Code Section Mean to You? Kristina Kern Wheeler, General Counsel Ja-Deen L. Johnson, Consumer.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Annexation 480 CHELSEA ROSE ANNEXATION PUBLIC INFORMATION MEETING AUGUST 11 TH, 2015.
1 Community Facilities District & Redevelopment Overview January 19, 2008.
MORRIS MILL PROPOSED URBAN SERVICES DISTRICT Presentation to County Council September 17, 2013.
Orange County Board of County Commissioners Update on USEPA Rulemaking for Numeric Nutrient Criteria Utilities Department January 26, 2010 Utilities Department.
Annual Meeting February 04, HOA Board of Directors  Chairman – Cliff Howard  President – Ilze Robinson  Director – Tom Ball (outgoing member)
SAGHA Annual Homeowners Meeting August 28, Agenda  Collect ballots  Treasurer’s Report  Common Area Maintenance Presentation  Election Results.
5/29/021 Informational Meeting May 29, 2002 Perry Township Administration Building Fourth Street/Bowman Road Sewer Improvement Area.
1 Construction Assessment Hearing May 23, 2001 Shawnee Middle School Cafeteria.
Southwood Waterline Project Shawnee Twp. House 7:30 PM November 29 th 2000.
Potential Sources of Financial Assistance to Connect to the New Sewer PRESENTED BY SHERYL FLORES AND ALMA AGUILAR 11/5/2015.
Ordinance Amending Chapter 37 Orange County Code Utilities Department October 21,
Town of Genoa October 6, Agenda Why are we here? Background Capacity Analysis & Facilities Plan Preferred Alternative Board Direction Implementation.
Options to Address Stormwater, Road and Septic Issues.
City Council Meeting Presentations.  Part I – Regulations and Terminology May 17, 2011  Part II – Revenues June 7, 2011  Part III – Fund Descriptions.
Heritage Park Area Mandatory Connection Final Information Meeting March 14, 2016.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
Sewer Infrastructure Watuppa Plantations Development Tiverton Wastewater District (TWWD) “Our mission is to safeguard public health and protect and improve.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Mandatory Connection 1 st Information Meeting. Review project Explain mandatory connection process via Frequently Asked Questions Answer questions Supply.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
1 Staff Public Workshops Fall 2011 Policy for Siting, Design, Operation and Management of Onsite Wastewater Treatment Systems San Luis Obispo: October.
Mandatory Connection 2 nd Information Meeting November 17, 2015.
February 21, General Information Utility staff is not aware of any mandate from city ordinance or state statute to provide water and sewer services.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
CONGAMOND ROAD ROADWAY IMPROVEMENT INFORMATIONAL MEETING
FY 2017/18 General Budget Workshop
Town of Brighton, Department of Public Works
Welcome to the Libertyville Stormwater Master Plan Open House
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
Springbrook Estates Sewer Improvement Area Informational Meeting
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
Sewer Infrastructure Watuppa Plantations Development
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
[OUR CITY NAME]’S OLD SEWERS
Nebraska Water Infrastructure Funding and Financing Programs
Dam Management District Overview
Fixing Our City’s Old Sewers
Biltmore C Proposed Water & Sewer Improvement Project
Village of Naples New Sanitary Sewer System Final System Layout
Presentation transcript:

Robert Gray Ave Public Meeting Proposed Sewer Construction May 18, 2015 Tiverton Wastewater District (TWWD) “Our mission is to safeguard public health and protect and improve ground and surface water resources by implementing effective and efficient wastewater management and disposal within the Tiverton Wastewater District.” – TWWD

Meeting Schedule - Rules TWWD Presentation Question and Answer Period –Priority to Residents of Proposed Construction Area (Everyone will have an opportunity to speak) –Comments limited to 3 minutes –Please allow everyone to speak once before raising a second point.

“Who are you guys and what’s in it for you?” TWWD –Quasi-Public Agency created by the General Assembly. –Created, in part, to allow access to funding to help offset the cost of sewer construction. (The Town is does not qualify for this funding) –Separate and distinct entity from the Town Our People, Your Neighbors Volunteer Board Leroy Kendricks, Chairman Chris Nearpass Paul Northrup Colleen Stanton Scott Humphrey 3 Part-Time Staff Lisa Andromalos Sarah Stearns Nan Godet

Why are we here? A little bit of history Facilities Plan Update RI Cesspool Act of 2007 –Requires all properties within 200 feet of the shoreline and other critical resources to replace all cesspools by January 1, 2014.

The Issues Stormwater II and RIDEM TMDL Study (2011) –Found two outfalls along the Tiverton shoreline are contaminated with fecal bacteria commonly associated with failed septic systems. –“The Town must commit to… construction of sewers for these problem areas.” Failed/Outdated Systems –older systems –non-conforming Environment

How Is Wastewater Treated?

Cesspools Cesspool Non-Compliant Effluent flows directly into groundwater. Fecal bacteria contaminate local water resources

Different Types of Septic Systems Typical Septic System Installation – Uncommon, only 16% of land in Tiverton would qualify Poor Soils & Low Groundwater Table – Common scenario in project area Poor Soils & High Groundwater Table – Common scenario in project area Advance Treatment – Common scenario in project area Advance Treatment on Difficult Site – Uncommon, but more likely along waterfront area

Septic Systems Septic System New systems compliant Code-compliant systems often costly Cost varies by location, soil type, septic system Must replace at 25 years

What Is TWWD Proposing?

Sewer Sewer System Code Compliant Cost Effective Effective/Efficient wastewater management Public grants decrease cost Does not contaminate surface or ground water resources Maintained by TWWD Little disruption to property

Brackett Colonial Craig Kearns Last Old Colony Terrace Randolph Robert Gray Summerfield Terry Robert Gray Project Area

TWWD Proposal for Robert Gray Ave Area Infrastructure Plan –94 properties –5 additional vacant lots Public/Private work –Project Covers Public & Private Work –Construction on/under streets –Construction on property

What does this mean for your property? Public construction –Roads will be repaved curb to curb Private work –Easement Everything back where it was/the way it was

What’s This Going To Cost?

Cost One Time Construction Costs Betterment Assessment Not To Exceed $18,000 –amortized over 40 years ($68.00/month) Ongoing Usage Costs for Residential Customers Annual Operations, Maintenance and Administrative Fee –$150 annually ($12.50/per month) Estimated Sewer Usage Fee –Rate: $6.66/HCF (As of 7/1/15), Avg. Cost: $57.00/month Monthly Construction Assessment $68.00 Estimated Average Usage Cost + $69.50 Total (est.) Monthly Assessment & Usage Cost = $137.50

Additional Cost Info. Property Owners Who Choose Not to Tie In –Still have to pay the the “Public Only” financial responsibility: $13,000 of the not-to-exceed $18,000 project cost. This results in a monthly cost of $49.00 when amortized over 40 years. Residents will lose certain benefits if they choose not to tie in at the time of the main construction project and need to tie in at a later point in time. Specifically: They will no longer have access to the grant currently available for private work tie in They will not be able to finance private work tie in costs through the current 40 year amortization schedule and will be responsible for finding their own financing solution

Timeline Surveying and Subsurface Investigations –July 2015 – January 2016 Design and Permitting –November 2015 – August 2016 Bidding and Contract Award –August 2016 – October 2016 Construction –December 2016 – September 2017

Voting Process Timeline Ballots will be mailed on May 29; Are due back on June 12; Will be counted on June 15. Results will be announced June 15. Eligibility Voters must own a property within the proposed project area One vote per property

Voting Process: Sample Ballot Question: Tiverton Wastewater District shall extend sewer service to the Robert Gray Ave Neighborhood, whose boundaries are the Mt. Hope Bay Interceptor up through Poplar Drive, Riverside Drive, Sunderland Heights, Quaker Road, Bowen Avenue, and portions of Quaker Avenue west of Central Avenue and Tucker Avenue south of Route 24. The project includes sewer infrastructure construction in the public right of way as well as the necessary work on private property to complete the sewer tie-in. The project will be funded through a USDA grant and loan package totaling $7.1 million. Properties within the project area will be assessed a betterment fee upon completion of the project and/or property tie-in not to exceed $18,000. APPROVE REJECT OFFICIAL BALLOT ****SAMPLE**** ROBERT GRAY

The Value of Sewers Less expensive than most other types of systems –because of the grants that we have obtained from the USDA, especially for problem areas near the water. Less disruptive to the property (less equipment protruding through the soil). –You can have your property look the way you want it to look without unsightly equipment. TWWD will be responsible for the financing. –No upfront cash is needed from the homeowner. Property owners pay a bill similar to other utilities such as electric and telephone. It is best for the environment. –Even the best on-site system still puts unwanted nutrients into the water body. Too much nitrogen in the water body can cause an overgrowth of algae and other plants. Over time, the plants will deplete the oxygen levels in the water which can trigger fish kills and depletion of other aquatic life.

Value of Sewers Worry Free –Homeowners are freed from responsibilities of owning, maintaining and having to replace an on-site wastewater treatment system and from impacts of their neighbor's system as well. –It will be owned and maintained by the TWWD so there are no hassles to the homeowner. Clean –Sewer prevents fecal matter from getting into the water body from failed systems. No one wants to fish, swim, or boat in water that has sewage in it. –Treatment happens at the Fall River Advanced Wastewater Treatment Plant which discharges highly treated water back into the water body. Value –Sewer provides greater flexibility for the use of your home providing fewer restrictions when considering improvements such as adding a deck, a pool or an addition. –It may enhance the resale value of the property for some buyers.

IF Voters Reject Sewers Robert Gray Area (Current State of Systems) If the neighborhood votes against sewer installation, and your property is deemed non-conforming by the state or the town, you will have one year to take steps to install a conforming system. –All homes in the area must be inspected. Inspection paid by homeowner. –For those systems that fail, homeowners have one year to have a system engineered, financed, and installed –Homeowners within 200 feet of the water that have cesspools, must replace their system within 1 year per the RI Cesspool Act “….the DEM will move to enforce all of our Rules and Regulations going forward should sewers not go in or should residents not connect. Should the residents elect not to construct sewers or connect, the Department will move immediately to enforce the Rules and Regulations and require any failed system be replaced.” - Brian Moore, P.E. (Chief, Groundwater and Wetlands Protection)

Q&A Question and Answer Period –Priority to Residents of Proposed Construction Area (Everyone will have an opportunity to speak) –Comments limited to 3 minutes –Please allow everyone to speak once before raising a second point. –Collect Questions –Questions after tonight? Phone: (401)