Long Term Study Scenarios and Generation Expansion Update October 12, 2012.

Slides:



Advertisements
Similar presentations
Guatemala: El Canada Hydroelectric Project
Advertisements

WORKSHOP ON UTILITY WIND INTEGRATION STUDIES: MODELS AND METHODS Panel 6 – Base Load Unit Cycling Costs Gene Danneman P.E. June 24 & 25, 2010.
Pacific Gas and Electric Company Long Term Procurement Plan Proceeding Renewable Integration Model Results and Model Demonstration October 22, 2010 Workshop.
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Electric System Reliability in a Post SONGS World.
Steve Moorman Mgr Business Development, Advanced Technologies Babcock & Wilcox CO2 Emission Reduction from Coal Fired Plants FutureGen 2.0 CO2 Capture.
Financial Model.
Technical Conference Avoided Cost Modeling January 6, 2015.
Resource Adequacy in PJM
1 John J. Conti Acting Director Office of Integrated Analysis and Forecasting Prepared for the Energy Technology System Analysis Program (ETSAP) Florence,
Capacity Valuation.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
Northwest Power and Conservation Council Effects of Alternative Scenarios on Sixth Power Plan Northwest Power and Conservation Council Whitefish, MT June.
IPCC Synthesis Report Part IV Costs of mitigation measures Jayant Sathaye.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
ERCOT PUBLIC 8/19/ LTSA Scenario Results Updates August, 2014.
ERCOT PUBLIC 4/22/2014 Updates for 2014 LTSA Scenario and Data Assumptions 4/22/2014.
ERCOT PUBLIC 7/10/ LTSA Scenario Development.
ERCOT PUBLIC 3/25/ LTSA Scenario and Data Assumptions March 25, 2014.
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Annual Energy Outlook 2010 Electric Power NPC Presentation October 14, 2010.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
ERCOT PUBLIC 6/17/ LTSA Scenario Results June, 2014.
Long Term Study Scenarios and Generation Expansion Update December 7, 2012.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
Julia Matevosyan, Resource Adequacy January, 2014 Application of KERMIT in the DOE LTS process.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
Base Case Draft – For Comment Rocky Mountain States Sub-Regional Transmission Study December 9, 2003.
Network Customer Meeting Access Metric Update November 16, 2006.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Proposed Generation Expansion Process For Review and Discussion March 1, 2011.
December 7, 2012 Transmission Needs Analysis Scenario 5/7 Update.
March 1, 2011 Load Analysis Update Calvin Opheim Manager, Load Forecasting and Analysis.
ERCOT PUBLIC 7/14/ Model Data Assumptions Doug Murray ERCOT Sr. Planning Analyst LTSA Scenario Development Workshop July 14, 2015.
Kevin Hanson Doug Murray Jenell Katheiser Long Term Study Scenarios and Generation Expansion Update April, 2012.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
2016 Long-Term Load Forecast
PJM©2008 Potential Effects of Proposed Climate Change Policies on PJM’s Energy Market Paul M. Sotkiewicz, Ph.D. Senior Economist PJM Interconnection Organization.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
Long Term Study Task Force Update ERCOT Long-Term Study Scenarios January 13, 2012.
On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid Rochelle.
Environmental Benefits of Renewable Portfolio Standards in an Age of Coal Plant Retirements September 10 th, 2015 Energy Policy Research Conference Denver,
Analysis of Demand Response Modeling in GridView Andy Satchwell and Sarah Smith Modeling Work Group December 21, 2015 The work described in this presentation.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Electric Capacity Market Performance with Generation Investment and Renewables Cynthia Bothwell Benjamin Hobbs Johns Hopkins University Work Supported.
Study Results April 16, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
Long Term Study Transmission Results May 21 st, 2013.
Long Term Study Task Force Update Modeling Emerging Resources Through 2030 January 13, 2012 LTSTF.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
The Impact of Intermittent Renewable Energy Sources on Wholesale Electricity Prices Prof. Dr. Felix Müsgens, Thomas Möbius USAEE-Conference Pittsburgh,
ERCOT PUBLIC 5/20/ LTSA Current Trends Scenario Results May 20,2014.
High Level Post Processing Cost Estimates MWG SSC Meeting September 26, 2011.
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
GATF Loss of Load Process (or How to Make Sausage) October, 2012.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
04/16/ Planning New Generation APPA Operations & Engineering Conference April 10, 2006 Jay Hudson, PE Manager, Environmental Management.
LTSA Scenario Development Workshop
“Other” Cost Estimates
2018 LTSA Workshop August 2017 RPG Meeting Welcome to.
Integrated Resource Plan 2016
Technical Committee Meeting March 18, 2016
Presentation transcript:

Long Term Study Scenarios and Generation Expansion Update October 12, 2012

2 Agenda Summary of Scenario Results System Ramp Rate Capability Generation Build Discussion Drought Scenario Appendix October 12, 2012

3 Generation Expansion Update Six scenarios have been completed to date. See scenario matrix in appendix for further information –Original Business as Usual (BAU) –BAU with all technologies (BAT) –BAT with retirements –BAT with updated wind shapes –BAT with High Natural Gas Price (BAT High NG) –Environmental Updated wind profiles were received from AWS TruePower and applied to BAT New Wind, BAT High NG, and Environmental scenarios Results generally pointing to the addition of large amounts of wind in all scenarios with new wind profiles Solar generation also being added in large amounts Drought Scenario currently in progress (about 25% complete) October 12, 2012

Summary of Scenario Results October 12, 2012 *These retirements resulted from the economic retirement process based on profitability, age, and efficiency. The BAT New Wind, BAT High NG, and Environmental scenarios include the updated wind shapes from AWS TruePower. BAT Retirements was completed before receiving the new shapes.

5 Comparison of Results: 2032 LMP Price Duration Curve October 12, 2012 The BAU with retirements resulted in no hours with LMPs at $0/MWh. The Environmental Scenario, with a total of over 81,000 MW of nameplate wind capacity, resulted in 2,670 hours of LMPs at $0/MWh.

Wind Production vs. Hourly LMPs October 12, 2012

7 Comparison of Results: 2032 Generation Breakdown October 12, 2012 As increasing amounts of wind, solar and geothermal proved to be economical, the amount of energy provided by renewables increased from 13% in the BAT w/ Retirements scenario to 63% in the Environmental Scenario. The reduction in generation from natural gas and coal in the Environmental Scenario was a result from increased renewables and economic retirements of older steam gas units and coal units with high emission rates.

8 Comparison of Results: 2032 Dispatch Cost Components October 12, 2012 Coal may appear to have the lowest overall dispatch costs, but wind, solar and geothermal have a $0/MWh dispatch cost in the model. The addition of emission costs in the Environmental Scenario increases the total dispatch costs of all thermal units. The increases ranged from $32/MWh up to $75/MWh.

9 Summary of Scenario Results: SO 2 Emissions October 12, 2012 If the CSAPR rule comes back in some form, according to previous limits proposed, the Environmental Scenario is the only scenario that would meet those limits. SO2 emissions decrease in the BAT High NG scenario due to increased generation from wind and decreased generation from natural gas fired units.

10 System Ramp Rate Capability – BAT High NG October 12, 2012 While there are times when the combination of wind and load ramp approaches 10,000 MWs in one hour in this scenario, a large amount of thermal generation is on-line during those hours. Further analysis is needed to determine the required amount of thermal generation on-line. March 2 nd, Hour 24 System Load – 59,137 MWs Renewable Generation on-line – 31,477 MWs All other generation – 27,660 MWs Combined wind/load ramp – 9,156 MWs October 28 th, Hour 04 System Load – 42,275 MWs Renewable Generation on-line – 31,499 MWs HSL of Committed Units– 20,676 MWs All other generation – 10,776 MWs Combined wind/load ramp – 42 MWs

11 System Ramp Rate Capability - Environmental Scenario October 12, 2012 In the Environmental scenario there are a number of hours where the amount of system ramping capability could be insufficient. April 2 nd, Hour 11 System Load – 55,203 MWs Renewable Generation on-line – 48,404 MWs HSL of Committed Units– 11,131 MWs All other generation – 6,798 MWs Combined wind/load ramp – 10,298 MWs May 18 th, Hour 08 System Load – 57,881 MWs Renewable Generation on-line – 27,697 MWs All other generation – 30,184 MWs Combined wind/load ramp – 12,906 MWs

12 Generation Build Discussion Why is so much wind getting built? –Wind capital cost decreased in 2012 from $2,222/kW to $2,000/kW Discussion with other working groups lead to updated capital costs for wind which occurred after BAU with All Tech was completed. This lead to an overall decrease in capital cost for all years –Updated wind shapes (see other presentation) BAU All Tech and BAT Retirements had the old wind shapes –Received updated information from RFP after these scenarios were completed These new shapes provided our expansion units with higher overall capacity factors The shape of the wind output also varied, leading to increased number of hours of operation during peak summer periods The increased capacity factor and altered shapes led to increased revenues received –PTC Provides additional revenue –For example: $24/MWh in 2016 October 12, 2012

13 Generation Build Discussion Why are coal or combined cycles not getting built? –Capital Cost is very high for coal compared to alternative technologies –Natural Gas price does not increase enough to result in high LMPs –Wind modeling Wind is modeled as a transaction in PROMOD with a $0/MWh dispatch cost, thus decreasing LMPs during high wind hours –In the Environmental Scenario emissions costs are added to coal and gas generating units October 12, 2012

14 Drought Scenario October 12, 2012 Premise: A long-term drought would begin in 2018 and last for about 6 years Three major adjustments made to the data for this scenario ‒ Capacity reductions were made to existing generation due to lack of water or high intake/discharge water temperatures ‒ Increase costs of water were added to new thermal expansion generating units ‒ Forecasted load used Moody’s base economic assumptions with ERCOTS’ 2011 load shape Additional sensitivities were added to the drought scenario so the impact of water issues could be seen in isolation ‒ Sensitivity 1 removed the PTC and reduced the gas price to the base level ‒ Sensitivity 2 removed the PTC and reduced the gas price further to a low natural gas price

15 QUESTIONS / COMMENTS??? October 12, 2012

16 APPENDIX October 12, 2012

17 Progress to Date October 12, 2012

18 BAT with Retirements Scenario Results October 12, 2012

19 BAT New Wind Shapes Scenario Results October 12, 2012

20 BAT High NG Scenario Results October 12, 2012

21 Environmental Scenario Results October 12, 2012