4 th MARCH 2011 Ashton Coal Operations Pty Limited Community Consultative Committee EnvironmentalReport Environmental Report.

Slides:



Advertisements
Similar presentations
1 Water discharge rate is monitored continually. 2 Sampling of stream and drainage water is made automatically or by grab sampling weekly while groundwater.
Advertisements

Division of Reclamation December 4, Signs and Markers Place at all entrances to the permit area from public roads conspicuous signs which state.
Demonstration of Subaqueous Disposal of Mill Waste Dave Hinrichs, NewFields Mark Doolan, U.S. EPA Chris Wienecke, ATT Sunoco and Jasper County Group R.
Newmont USA Ltd. Genesis Mine June 6, What are the Potential Hazards? Flatbed Truck Collecting drill cuttings Three Bench Drills Operating Service.
CO 2 monitoring and modelling across Greater London Lester Kwiatkowski.
Although this monitor is owned and operated by the State of Missouri, significant research was conducted with this technology for fence-line monitoring.
INSPECTION PENRICE ANGASTON QUARRY OPERATION Thursday 19 February 2009.
NetDMR Training for KYG4E and KYG4W
Dale T Littlejohn Senior Geologist. What is fate and transport in the vadose zone? Vadose Zone Hydrocarbon release from buried pipeline Aquifer Surface.
0 CCG Meeting Angaston 3 rd December Penrice CCG Meeting Action Arising BLAST MONITORING Chris Linke Monitor Site Blast Data 21/11/09 60 holes located.
Keweenaw North Waterway Buoy Bob Shuchman: Colin Brooks: Nate Jessee:
Juneau Flightseeing Noise Informational Work Session November 6, 2000.
Self-monitoring programme for a Swedish power plant Hans-Roland Lindgren Director Swedish EPA 1.
| pg 1 NSW Planning & Environment Upper Hunter Mining Dialogue Presentation th October 2014 Presented by Scott Brooks, Team Leader, Compliance.
DRAYTON MINE IMPROVEMENTS TO DUST AND EMISSIONS MANAGEMENT – AIR QUALITY INFORMATION SESSIONS October 2014.
Water Quality Monitoring of Lake St. Joseph Watershed Principal Investigator: Beatrix Haggard, Ph.D. Co-Principal Investigators: James Hendrix Donnie Miller,
VENTILATION FOR SINKING VERTICAL, SUB-VERTICAL AND DECLINE SHAFTS Derek Walters Turgis Consulting.
Crandall Canyon Shaft Project PLATEAU MINING CORPORATION.
0 CCG Meeting Angaston 1 st April Mine Operation Update Eastern area  Shaping and topsoil addition continuing  Preparation for planting of trees.
Vegetation Establishment. Exposed soil occurs on all construction sites.
NYS Department of Environmental Conservation NYSDEC Public Meeting September 12, 2013 Brooklyn Navy Yard, Building 92 Former Kent Avenue Site 500 Kent.
Centre for Science and Environment JSW Energy Vs Top Performers Topper- No comparison with average performers Topper- Higher benchmarks, higher expectations.
Jilin Provincial Transport Scientific Research Institute & PEECE Pty Ltd Environmental Management Plans Presented by Phil Hawley & Steve O’Rourke P E E.
You will work in groups All groups play…In turn…Out of turn Scoring (In Turn)…Right – 4 chips Wrong – loss 2 chips Help…50/ chips… Ask the Group.
PROGRESS REVIEW POLANNARUWA Presented By: Eng. Vijayabalan, J. Engineer (RWS) Mannar/Vavuniya Prepared By: Rural Water and Sanitation Unit,
Idaho Solid Waste Facility Record Keeping June 20, 2006 Idaho Department of Environmental Quality.
Baseline Analysis of Ground Water Quality Around Open Dumpsites in Lagos, Nigeria: Focus on Polynucelar Aromatic Hydrocarbons. Baseline Analysis of Ground.
2006  MEADOWBANK GOLD PROJECT Cumberland Resources Ltd. AIR QUALITY EIS.
Assessing Effects on Human Health Meadowbank Gold Project Margaux Brisco Nunavut Impact Review Board Final Hearings, Baker Lake, Nunavut March 27 to 31,
Briefing Session Temporary Traffic Arrangement at Campus Circuit For Site Formation Works at Area 39.
Three Kings Quarry 19 August 2013 – Site Liaison Group Meeting Site Monitoring Report 1.
SUBMICRON AEROSOL PARTICLES IN A SMALL SETTLEMENT NEAR HIGHWAY J. HOVORKA, Z. STAŇKOVÁ Institute for Environmental.
Ozone Monitoring in Wyoming Cara Casten Wyoming Dept. of Environmental Quality – Air Quality Division March 10, 2004.
Using Minitab to construct Control Chart Part 3. C-charts are used to monitor the number of defects per unit. Examples are the number of returned meals.
13 th SEPTEMBER 2011 Ashton Coal Operations Pty Limited Community Consultative Committee EnvironmentalReport Environmental Report.
1 Ultrafine Particles and Freeways Yifang Zhu, Ph.D. Assistant Professor Department of Environmental Engineering Texas A&M University –Kingsville
NEXT SLIDE. 06:26 am 1 st Left crew arrives at section switch.
Malé Declaration Joint Training on Regional Refresher Course and Soil Acidification Asian Institute of Technology (AIT), Bangkok, Thailand from
DRAINMOD APPLICATION ABE 527 Computer Models in Environmental and Natural Resources.
U.S. Department of the Interior U.S. Geological Survey Bee Lake Water Quality Monitor Data Summary Period of record: to 2/19/07.
MARCH THE STATE OF OUR ENVIRONMENT > MARCH MARCH SUMMARY Hawke’s Bay Regional Council Environmental Science – March 2011 This monthly report includes.
Hazard Management Plans Moura Mine’s Highwall Mining Approach.
1 Texas Liquid Fertilizer Corn TLF Commitment to you Increase yields Lower Costs Help solve those production problems that limit profitability.
Llwyneinion Acid Tar Lagoon
Jericho Project Air Quality Assessment. TOPICS METHODOLOGY EMISSION SOURCES RESULTS AND ASSESSMENT MITIGATION AND MONITORING CONCLUSION.
Are we polluting the Ridge’s precipitation? A study by Garrett Porter located on Niwot Ridge, Colorado. Performed on February 6, 2010 and presented on.
1 Preliminary evaluation of the 2002 Base B1 CMAQ simulation: Temporal Analysis A more complete statistical evaluation, including diurnal variations, of.
Air Movement (53) Areas of Earth receive different amounts of radiation from the Sun because Earth is curved.
Just say NO! brought to you by a group of Concerned Citizens The Big Pit Dump Stinks!
Marshall Landfill Site.  Patrick Cabbage, Hydrogeologist/Site Manager  Bill Fees, Engineer  Carol Bergin, Public Involvement Coordinator.
ENVIRONMENTAL PROGRAMS Copyright © 2007 Exceptional Events and Data Collection in the Vicinity of the West 43 rd Avenue Monitor MAG Regional Council April.
Testing Biota Dose Assessment Committee Methodology with 1997 Hanford Surveillance Data by E. Antonio (PNNL) and J. P. Lair (TRP) August 1999.
Wisconsin Department of Natural Resources Perspective on the Industrial Sand Industry March 24 th 2016.
Santiago Hills II East Orange General Plan Noise Assessment Matthew B. Jones, P.E. Mestre Greve Associates.
REMINDER: TEST TOMORROW
Contractor Submissions
TSCHUDI COPPER MINE.
Environmental Science Do Now
AFPC Policy Protect its personnel, contractors,3rd parties and the environment against the hazards of exposure to ionizing radiation due to AFPC activities.
Second Semester Exam Review Day 4
Community Consultative Committee November 2016
Community Consultative Committee April 2018
Long Term Precipitation Chemistry Monitoring on Vancouver Island
Community Consultative Committee April 2017
Cherokee Concerned Citizens Pascagoula, MS
Energy Transfer & Heat Transference cont.
Mining and Mineral Resources
FOSSIL FUELS AND MINING
Advanced Placement Exams
10 DAY PUBLIC NOTICE: Water Main
Presentation transcript:

4 th MARCH 2011 Ashton Coal Operations Pty Limited Community Consultative Committee EnvironmentalReport Environmental Report

Ashton Monitoring Locations

Depositional Dust Monitoring

Total Suspended Dust Monitoring

PM 10 Dust – Site 1 Monitoring Maximum daily limit 150µg/m 3

PM 10 Dust – Site 2 Monitoring Maximum daily limit 150µg/m 3

Monitoring Maximum daily limit 150µg/m 3 PM 10 Dust – Site 3

Monitoring Maximum daily limit 150µg/m 3 PM 10 Dust – Site 8

Blasting Statistics at 1 st March 2011 Criteria ChurchVillage VOPV Maximum Average11041 >2 mm/s001.6%(1)0 >10 mm/s0000 >115 dBA01.6% (1)00 >120 dBA blasts have been fired for the reporting period to date.

Rainfall Monitoring

Water Sampling Locations Monitoring

Water Quality - pH

Monitoring

Water Quality - pH

Water Quality - EC Monitoring

Water Quality - EC Monitoring

Water Quality - EC Monitoring

Groundwater Sampling Sites Monitoring

Groundwater – Standing Depth Monitoring

Groundwater – Standing Depth Monitoring

Groundwater – EC Monitoring

Groundwater – EC

Noise Monitoring Noise Statutory noise monitoring was conducted in February There were no exceedences for the reporting period.

Complaints Community Total complaints 4 –, Total enquiries - 0 DECC

Complaints

Environment Related Operation Changes Daily Operational Changes DateIssueOperational Changes 9/12/2010Winds getting towards 10m/s Trucks were audible in the village. OCE changed location of trucks dumping from the RL135 to in the pit 11/12/2010 Increasing winds with trucks dumping on the RL130 Moved trucks from the RL130 dump back to the Buttress dump in pit at 3pm 13/12/2010 Increasing South easterly winds with trucks dumping on the RL130 Moved trucks from the RL130 dump back to the Buttress dump in pit at 7:30pm 14/12/2010 Proactive movement to reduce noise in the village Moved trucks from the RL130 dump back to the Buttress dump inpit at 7:30pm 15/12/2010 Proactive movement to reduce noise in the village Moved trucks from the RL130 dump back to the Buttress dump in pit at 7:30pm 16/12/2010 Proactive movement to reduce noise in the village Moved trucks from the RL130 dump back to the Buttress dump in pit at 7:30pm 18/12/2010Predicted high NW windsDidn't dump on top dumps all day

Environment Related Operation Changes Daily Operational Changes DateIssueOperational Changes 22/12/2010 Proactive movement to reduce noise in the village No dumping occurred on the RL130 dump until 8.45am 23/12/2010 Proactive movement to reduce noise in the village No dumping occurred on the RL130 dump until 8.00am 22/02/2011 9am Machinery location change to working on area exposed to the village, 1 dozer on rehabilitation bulk push Environmental Manager inspected village and listened for dominant noise sources. There appeared to be no issue with the operations There were no issues identifiedNo action 24/02/2011 8:30 machinery commenced working on exposed face to the village, one dozer on high dump with low number of trucks dumping. Dozer also working on high level of rehabilitation bulk push, one dozer on lower level bulk push with low volume of trucks dumping. 8:35 Environmental Manager inspected village The higher level dozer working on rehabilitation was audible. Contacted OCE at 9.05 and had the higher dozers operations immediately halted. High level dozer work on the rehabilitation was permanently halted. Lower dozer continued. Immediate halting of higher dozer operations brought the noise levels down for the following 15min period. This dozer was moved of the rehabilitation operations.