Mod 273 – Governance of Feasibility Studies Customer Experiences Julie Cox Transmission Workstream - 4 th March 2010.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

EU 3 rd Package Clarification of points raised at Transmission Workstream 3/12/2009.
NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 July 2010.
Open Public Services Listening Exercise Summary November 2011.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Mod 0273: 1 st Development Group Workshop 4 th February 2010.
AQ Appeals and the BTU form Chris Warner. 2 AQ Appeals and the BTU form  Presentation reflects NGD’s view of UNC regime as drafted and is intended to.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod Publication of UK Wholesale Gas Market Liquidity Data Richard Fairholme E.ON UK Transmission Workstream, August 7 th 2008.
Computer Engineering 203 R Smith Requirements Management 6/ Requirements IEEE Standard Glossary A condition or capability needed by a user to solve.
Exit Reform Review Transmission Workstream 07 January 2010.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
SMART METER TEXAS Status Update July 29, AGENDA Release 1 Smart Meter Texas Online Portal Update – SMT Solution Update – Registration Statistics.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
Basel 2: Current Status Phil Rogers, HSBC Bank Credit and Risk 25 July 2006.
1 CODE MODIFICATION PROPOSAL No 0243 Amendments to the process for initialisation of Enduring NTS Exit (Flat) Capacity at the Moffat NTS Exit Point Presentation.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Sunday, 04 October 2015 UNC Mod Action WG0505: Provide for discussion/development the potential categories of connection offer and associated timescales.
Chapter 5 – The Client. Definition of the Client n Differences between Internal and External Clients.
Mod 0273: 3 rd Development Group Workshop 4 th March 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
CSEPs Reconciliation “Read Window” proposal. 2 Background  I&C CSEPs (supply point AQ >73,200) are subject to reconciliation  IGTs are obliged to provide.
OPNs & LDZ Demand Forecasts Chris Shanley & Nick Reeves.
UNC modification proposal 0407 : Standardisation of notice periods for offtake rate changes for all National Grid NTS Exit Users Transmission Workstream.
UNOS Member Survey Results Working Together. Saving Lives.
Professional Services Automation ICF-GTA Greater Toronto Area Chapter Page 1 ICF-GTA Financial Forecast As of August 31, 2009.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Technical Perspectives Mat Jordan Steve Anderson.
Doc.: IEEE leci SGLECIM November 2010 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPAN) Submission Title:
UNC Modification Proposal 0229 Guidelines document.
Assignment of NTS Entry Capacity Transmission Workstream 02 July 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 0273: Governance of Feasibility Study Requests to Support Changes to Network Exit Agreements – National Grid NTS Response.
Supply Assumptions for Investment Planning Transmission Planning Code Workshop 1 3rd April 2008.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Review Group -140 Thoughts on additional information requirements.
ColumbiaGrid Reliability Activities ColumbiaGrid Board Meeting Presentation August 15, 2007.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Assignment of NTS Entry Capacity Review Group 221, 10th December 2008.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
 Ensure utilities plan for and provide services by which Missouri’s residents and businesses can achieve their goals with less energy over time, with.
The Risky Business of Assumptions Presented by: Beth Spriggs, PMP.
NTS Exit Regime Transmission Workstream – 6 th July 2005.
Aligning the connections and capacity processes 1 Mike Wassell Transmission workstream, January 2012.
System Operator information transparency. As Transmission System Transporter National Grid Gas undertakes responsibility for safe, effective and efficient.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Transmission Workgroup 7th July 2011
Example Feasibility Study Matrix
Transmission Workgroup 4th October 2012
PARCA Timeline Transmission Workgroup 4th July 2013 Rhys Ashman.
Transmission Workstream, 6 August
UNC Modification Proposal 0373
Time to Reach New Heights
Richard Fairholme, E.ON UK
Amendment to NEA & NExA Measurement Provisions Change Process
Developing capacity & connection processes: A long term non firm capacity product? 27th June 2012.
CSEPs Reconciliation Proposals
Long Term Non Firm Capacity Update
Release 3 Scope Selection and Plans
Revised Tender Timescale for DN Interruption Arrangements
Connected System Exit Points - Update
Gas Customer Forum DN Interruption Update - Introduction
Assignment of NTS Entry Capacity – Previous Work Undertaken
Revised Tender Timescale for DN Interruption Arrangements
Presentation transcript:

Mod 273 – Governance of Feasibility Studies Customer Experiences Julie Cox Transmission Workstream - 4 th March 2010

Member Survey AEP Members were surveyed to gather information on their experiences of obtaining or changing NExAs –Timescales –Cost –Process Comments relate to nearly 20 sites with NExAs NTS and DN, Supply Points and CSEPs Minimum and Full Connections

Timescales 6 months to get a first quote for a study 18 months for a study then 12 months for minor amendment request 12 months from initial request to projected completion of study 18 months end-to-end for NExA It all seems to take longer than it used to….. Lethargic response is the norm CCGTs can be built in 24 months this can become a critical path issue

Costs Flow rate change at existing site outside range quoted by NG. Draft Feasibility agreement no mechanism to inform party of changes to costs or to approve them Budget met but set high to start with and higher for each project Never come in under budget - little appetite for cost control Never had any clarity on actual costs Blank cheques?

Process Information requirements – not always clear at start, eventually becomes clear, but varies for each project, seem to need more and more… Do not understand why some info needed Information required generally available User requirements may change during feasibility study period as often runs in parallel with tendering, contractual discussions etc. Its unrealistic to expect it not to change….. NG do not appear to fully understand the implications of NExAs being delayed on power station projects

Anything else….. In the last year or so the people looking after this for NG NTS sites seem to have begun to be more commercially aware which is helpful. The DNs have not….

Summary Issues with costs, timescales, commercial implications Scope for –Better project management approach –Standardisation of information requirements –Cost control –Improved communications and understanding