P1801 25-Dec-15 IEEE P1801 Working Group (Unified Power Format – UPF) Status Stephen Bailey Chair, P1801 Working Group.

Slides:



Advertisements
Similar presentations
IEEE Mentoring Program Pilot Membership Development Retreat 1 May 2005 Cathy Downer, IEEE RAB Membership Development
Advertisements

Enabling Power Aware Emulation in Big CPU Project Adriana Wolffberg Vinay Vaddepalli, Osama Neiroukh.
Information technology solutions development Fundamentals of Information Technology Session 3.
Predictable Success Isolation Information Theoretic: UPF 2.0 and the Isolation Attributes Rev. 0.1 Jason Binney 5/15/2008 “AKA: Back to the Future”
Catherine Hoang Ioana Singureanu Greg Staudenmaier Detailed Clinical Models for Medical Device Domain Analysis Model 1.
RBA Securitisation System Technical Delivery Forum
Robustness Analysis Dr. Neal CIS 480. Outline What is robustness analysis? Key roles in robustness analysis Object types found in discovery Diagramming.
Churning the Most Out of IP-XACT for Superior Design Quality Ayon Dey Lead Engineer, TI Anshuman Nayak Senior Product Director, Atrenta Samantak Chakrabarti.
UPF-Based Power-Aware Design Flow Version 1.1
OpStor - A multi vendor storage resource management and capacity forecasting software.
Mark HahnDesign Constraints Working Group 1 1 Mark Hahn, Chair Cadence Design Systems, Inc (408) (408) (Fax)
TM Freescale™ and the Freescale logo are trademarks of Freescale Semiconductor, Inc. All other product or service names are the property of their respective.
TM Freescale™ and the Freescale logo are trademarks of Freescale Semiconductor, Inc. All other product or service names are the property of their respective.
Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
Connected Query Overview Michael Stutz (360) (888)
Cognos TM1 Satya Mobile:
K-12 Web Content Development Process
IEEE-SA Attendance Tracking Tool Project Wrap Up for 802 Implementation Dallas – November 2008.
1 PAR Presentation DASC meeting at DAC, June 21, 2001 Project title: A standard for an Advanced Library Format (ALF) describing Integrated Circuit (IC)
P1800 Requirements for IP Protection John Shields.
IEEE DASC Co-Sponsorship of UPF Working Group Proposal prepared by: Stephen Bailey Chair, Accellera UPF Technical Subcommittee.
Project Overview Project Manager: David Plouff Status as of: 3/09/12 Observation Data Collection Tool (ODCT) Phase One ODCT User Guide v.15 drafted for.
Design VASG Kicks-Off VHDL 200x Stephen Bailey Chair.
Doc.: IEEE /0038r0 Submission Jan 2012 Adrian Stephens, Intel CorporationSlide nd Vice Chair’s Report – Jan 2012 Date: Authors:
Ashenden Designs IEEE DASC Steering Committee 19 February 2004 Paris, France Peter Ashenden DASC Chair.
HDL+ Sub-Committees Chairs Meeting Vassilios Gerousis HDL+ Committee Chairman + Accellera Technical Chairman Infineon Technologies.
JEITA – DASC Joint Meeting January 29, 2010 Yokohama, Japan.
P1801 – Merging of Power Domains Gary Delp. 2 Draft - proposal provided to P1801 (and other groups) by LSI - #include LSI Confidential Purpose Provide.
Doc.: IEEE /177r0 Submission January 2000 Ian Gifford, M/A-COM, Inc.Slide 1 IEEE P Working Group for Wireless Personal Area Networks TG1.
Intellectual Property Department, Hong Kong SAR Government1 Interactive Services (Change of Name / Address / Agent’s Address / Address for Service) 10.
IEEE P1685 Kickoff Meeting – May 11, 2006 LSI Logic, Rochester MN Victor Berman, acting Chair.
1 © 2006 Cisco Systems, Inc. All rights reserved. Session Number Presentation_ID Using the Cisco Technical Support & Documentation Website for IP Routing.
Doc.: IEEE /1442r2 Submission December 2012 Marc Emmelmann, Fraunhofer FOKUSSlide 1 TGai Draft Review Overview Date: Authors:
Doc.: IEEE /1522r5 Agenda January 2016 Dorothy Stanley, HPESlide 1 IEEE TGmc January 2016 Agenda Date: Authors:
Doc.: IEEE /1522r0 Agenda January 2016 Dorothy Stanley, HPESlide 1 IEEE TGmc January 2016 Agenda Date: Authors:
Device and EMR interoperability (IDCO). Implantable Cardiac Device Information is Collected At Implant … During In Clinic Follow-ups … And in the Home.
How to Register on the Nebraska Statewide Telehealth Network Schedule Website?
Quality IP Study Group Update Prepared by: Kathy Werner VSI Alliance President QIP SG Chair.
Omniran ecsg 1 OmniRAN EC SG July 2013 Opening Report Chair: Max Riegel, NSN.
DASC Overview October, 2008 Victor Berman, Chair (Improv Systems) Stan Krolikoski, Vice Chair (Cadence) Kathy Werner, Secretary (Freescale) Karen Bartleson,
Submission January 2016 doc.: Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ e Closing.
International Workshop 28 Jan – 2 Feb 2011 Phoenix, AZ, USA Modeling Standards Activity Team Model-based Systems Engineering (MBSE) Initiative Roger Burkhart.
IPDA Registry Definitions Project Dan Crichton Pedro Osuna Alain Sarkissian.
Open Container Initiative Certification Program
GTO2003EXT.ppt 5/19/2018 Input to IEEE TAB Ad-hoc Standards Committee John Darringer - President CEDA Victor Berman - Chairman DASC October 2008.
Implementation Review Team Meeting
IEEE TGv March 2010 Agenda Date: Authors: March 2010
Results of Clinical Trials in EudraCT Sponsor meeting
Sub-1 GHz Study Group Closing Report Sept 2018

IEEE 802 JTC1 Standing Committee Slides for IEEE 802 EC opening
CIM Model Manager Report
Submission Title: [ e Closing Report for November 2015 Session]
Revised engagement approach for draft GTAC
nd Vice Chair’s Report – Mar 2012
Submission Title: [TGn Liaison Report] Date Submitted: [20Jan2006]
Verilog-AMS Integration with P1800 SV Standard
TGn FRCC Report March 2004 Adrian P Stephens Chair TGn FRCC

Drafting Group: Final Meeting Drafting Group: 1st Meeting
Tge draft ballot information
TGs Process, January Date: Authors: January 2007
IEEE PDED ad hoc closing report in Atlanta in Jan 2017
TGn Closing Report – September 24 ‘09
Stuart McAllister ESTAT F4

IEEE TGmc January 2016 Agenda
TGs Process, March Date: Authors: March 2008 March 2008
Presentation transcript:

P Dec-15 IEEE P1801 Working Group (Unified Power Format – UPF) Status Stephen Bailey Chair, P1801 Working Group

P Dec-15 Agenda l Quick Background l Key Technical Objectives of P1801 l IEEE P1801 Schedule l Q&A

P Dec-15 UPF Background l Initiated by users at DAC 2006 l Accellera sponsorship Sep 2006 l Donations from several companies Atrenta, Magma, Mentor, Synopsys, TI l Accellera approves v1.0 of UPF Feb 2007 l IEEE WG approved May 2007 l UPF version 2.0

P Dec-15 Key Objectives of P1801 (v2.0) l As with any 1.0 version, there are bugs and ambiguities l Discovered by vendors while implementing tool support l By users working through “paper prototypes” of how they would use UPF for their design needs l Enhancements to (better) address needs missed in v1.0

P Dec-15 Highlights of P1801 l Better support for soft IP & incremental refinement of low power specification l “Command layering” for incremental specification l Allow multiple calls to same command with each call adding more, but not contradictory, information l Enhanced retention specification l Save and restore are functions defined in terms of one or more signals

P Dec-15 Highlights of P1801 (2) l Enhanced power state information l Consistent with incremental refinement l Planned deferment of details (placeholders) l Can be specified prior to having a completed supply network specified for implementation l More information for verification and analysis as well as more complete information for optimizing implementation l Transitions as well as states l Defined access to state information from HDLs l Allows reference to states and triggering on state changes in TB & within assertions

P Dec-15 Support for Bias l Bias supplies l N-well, P-well, Deep-N-Well and Deep-P-Well l With defaults for each l New semantic definition: “corrupt-on-change” l A power state can be attributed with this semantic specification l Represents a bias voltage threshold that has uncharacterized performance l Nets and registers retain current value l But are corrupted on any change while in this state l Emulates that switching will occur but with an unknown timing

P Dec-15 Enhanced Semantic Specification l Improved semantic specification for set_related_power_pin (Name may change.) l Simulation semantics specified as well as implementation l When used on input, has semantic of a constraint for the source connected to the input l Merge power domains

P Dec-15 P1801 Schedule l Weekly telecons (Tues mornings) l Except for weeks with F2F meetings l May begin 2 nd set of weekly telecons to focus on technical issues to wrap-up l Monthly Face to Face Meetings l Jan: Magma hosted in SJ l Feb: Infineon hosted in Munich l Mar: Synopsys hosted in Mountain View l Draft standard for WG review: l Feb 2008 l Enter IEEE ballot: l End of Mar 2008 l Complete balloting May/June 2008

P Dec-15 Contact Information l reflector l p p1801 l Chair: