E. Ihloff February 8, 2008 FNPB-UCN building usage by nEDM.

Slides:



Advertisements
Similar presentations
More than experience CERN – 3rd MAY 2011 – Kick-off meeting Maintenance Assessment Project – Kick-Off Meeting Arek Burnos, Tony Vaclavicek, Tom Pryslak.
Advertisements

1 IP Address Management Survey of Esnet sites – December 2011 Prepared by: Les Cottrell SLAC, ESCC meeting Clemson University February 3 rd 2011.
David Saenz FAC November 11, 2008 SLAC National Accelerator Laboratory 1 Far Experimental Hutches David Saenz Project Manager.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Cryogenics Applied Technology Development Dana Arenius, Rao Ganni Engineering Division Cryogenic Systems Department Technology Town Meeting Feb 9, 2012.
12 GeV Upgrade of Cryogenics at Jefferson Laboratory (Jlab) Dana Arenius Engineering Division Cryogenic Systems ILC08 Nov This work is supported.
HYSPEC Instrument: Status and Performance M. Hagen Neutron Facilities Development Division, SNS, Oak Ridge National Lab. W.J. Leonhardt and A. Ruga Condensed.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
Welcome to SNOLAB David Sinclair. Welcome to our new Building Note – Building is still under construction Note – Building is still under construction.
Innovation Agent Programme Innovation checks – road to growth Erik W. Hallgren Danish Technological Institute
1 Overview of the NPDGamma Experiment at the Fundamental Neutron Physics Beamline Geoff Greene UT/ORNL.
NEDM Construction Project Cost & Schedule Philosophy Vince Cianciolo, ORNL Physics Division Internal Cost & Schedule Review 02/11/2005.
Ernie Ihloff 21 May 08 Preliminary Heat Shield Design for nEDM.
Collab 6/20/05 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Raleigh, NC March 3, 2006.
Andrew Hime Physics Division, LANL e-e- e-e- e SNOLAB Scientific Development Andrew Hime Physics Division, Los Alamos National Laboratory SNOLAB Workshop.
1 Preparation for the 3 He Injection Test 11/2007 MIT/BATES D. Dutta*, H. Gao, M. Busch, Q. Ye, X. Qian, W. Zheng, X. Zhu ( Duke University) ASU, BU, Caltech,
1 NEDM 4 He Purifier and Other Cryogenic Issues David G. Haase North Carolina State University Update on Cryovessel Engineering Evaporative Purification.
U.S. Department of Energy Environmental Management Los Alamos Field Office Legacy Cleanup Completion Project DOE National Cleanup Workshop September 29,
1 COMPTON POLARIMETER PRELIMINARY MAGNET DESIGN 06/03/08 Christopher Vidal, Senior Mechanical Designer Ernie Ihloff, P.E., Engineering Group Leader EE.
5 EXISTING BUILDINGS. Slide header copy In This Chapter >Sustainable existing buildings >Planning green projects for existing buildings >Measures to improve.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
EDMEDM EDM Collaboration Meeting Project Management Fast Start Summary Prepared by: John P. Tapia May 25, 2006.
1 MICE Radiation Shielding MICE Phone Conference, 28 January 2004 Yury Ivanyushenkov Engineering Department, RAL.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
1 FRIACO OFTEL INTERNET FORUM - 11 December 2000 Geoff Brighton JanWillem van den Bos.
1 Status of FNPB Geoff Greene / Nadia Fomin University of Tennessee.
Collab 5/26/06 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson and Contract Project Manager for the EDM Project for presentation to The EDM Collaboration.
P25 Business 11/1/07 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The nEDM Collaboration MIT-Bates, Middleton,
EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain for Walter Sondheim, P-25, Los Alamos February 11, 2005, at Los Alamos National Laboratory Conventional.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Ahmed Sidi-Yekhlef, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN FLOATING.
1 How Can We Get More Neutrons? Upgrade Paths for the EDM Geoff Greene University of Tennessee /Oak Ridge National Laboratory Oct 2006.
1 ECON : Economics of Construction Industry Lectured by Martin Čásenský 2010/2011 M. Čásenský : ECON.
September 10, 2004 Experimental Facilities Division SING Project Status HYSPEC IDT Meeting John Haines SING Project Manager September 10, 2004.
Engineering Approach EDM Collaboration Meeting 2-07 Jan Boissevain.
P25 Business 5/20/08 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The nEDM Collaboration Duke University, Durham,
EDMEDM C&S Review 2/11/05 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to LANL Cost and Schedule Review Committee.
EDM Assembly and Commissioning – or – How to Cut Two Years from the Project P. Huffman and V. Cianciolo.
EDM Fast Start Presentation WBS 11 – Assembly and Commissioning Vince Cianciolo, Paul Huffman May 23, 2006.
1 Cryogenic Design and the 4 He Evaporative Purifier David G. Haase, et al., North Carolina State University.
20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 1 OUTLINE 1.Status 2.Preliminary conclusions of the CNGS Review Board (30.
P25 Business 2/8/08 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The nEDM Collaboration ASU, Tempe, AZ February.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Status of Engineering Preparations for CD2/3A nEDM Collaboration Meeting – MIT Bates Jan Boissevain November 2, 2007.
General overview of WU : Cryogenic Distribution for Elliptical Linac Jarosław Fydrych Cryodistribution Project Engineer Preliminary Design Review,
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
MUSE Task 5 Design and Construction of a Liquid Hydrogen Target.
Cryovessel Engineering David Haase, Jan Boissevain, Ernie Ihloff WBS long lead time items Cryovessel Dilution Refrigerator Helium Liquefier.
Welcomes You…. Who we are… We are a team of experienced designers, architects, engineers and site supervisors who provide custom interior design services.
Summary of discussions
FRIB Cryogenic Support
Integration Group Summary
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Coordination meeting 12/05/15
Phone: + 40 (728) | +40 (733)
February 12 – 19, 2018.
Summary of discussions
HTC 34; 5656 AE Eindhoven, the Netherlands
Electric Distribution and Electric Consumption
Electric Distribution and Electric Consumption
Scope, Requirements Deliverables & Schedule
Far Experimental Hall Hutches Civil Construction
We provide an affordable option that is both safe and clean:
HTC 34; 5656 AE Eindhoven, the Netherlands
Far Experimental Hall Hutches Civil Construction
LERF Readiness Review: Charge
Hall C Beamline Upgrade

Presentation transcript:

E. Ihloff February 8, 2008 FNPB-UCN building usage by nEDM

E. Ihloff February 8, 2008 People involved in Building Layout Rick Allen – ORNL SNS Lead Engineer FNPB Walter Sondhiem – LANL Integration Engineer Jan Boissevain – Chief nEDM Engineer Ernie Ihloff – MIT John Ramsey - LANL Martin Cooper – LANL nEDM Project Leader Geoff Greene – ORNL Vince Cianciolo – ORNL David Hasse and Paul Huffman – NCSU Jlab Cryogenic experts – Rao Ganni, Dana Arenius, Jonathon Creel George Mulholland – ACT Cryogenic Consultant

E. Ihloff February 8, 2008 ORNL-SNS Layout Complete

E. Ihloff February 8, 2008 Status as of February 2008 nEDM and SNS engineers agreed on documents to go to an A & E firm for design of building - December 2007 Meeting at Jlab to discuss cryogenic layout- Oct 2007 Preliminary phone meetings with Linde and Cryogenic consultant George Mulholland on system design Goal to have cryogenic layout done by A&E review at SNS

E. Ihloff February 8, 2008 Location of FNPB Build at SNS

E. Ihloff February 8, 2008 Questions still to be addressed Satisfy DOE that design is function and safe Water cooling in FNPB building Make sure we claim external space we need Clean power requirements in hall Best use of Cryogenic consultants …other things ??