THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
Advertisements

Instrument TrainingIDPU - 1 UCB, Dec 6, 2006 THEMIS INSTRUMENT TRAINING IDPU.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
THEMIS Mission CDRInstrument I&T 1 UCB, June , 2004 Instrument Integration and Test Rick Sterling / Sharon Jelinsky University of California – Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
THEMIS MISSION PDRESA- 1 UCB, November, 2003 ESA Plasma Instrument Mission PDR Dr. C. W. Carlson and Themis ESA Team UC Berkeley SSL.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
THEMIS F2/F3 IPSR and F4/F5 IPER 1 By Telecon, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW Thermal.
THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California.
NASA’s Goddard Space Flight Center Systems Engineering Mike Pryzby Swales Aerospace August 16-17, 2005.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
4 th NASA Space Weather & Robotic Mission Operations Workshop, NASA/GSFC, Greenbelt, MD, September 27, THEMIS Operations & Anomalies Manfred Bester.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
TIM Phase A 1 SSL, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting EFW Digital Electronics Digital Control Board (DCB)
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 THEMIS Electric Field Instrument Fabrication, Integration, and Testing.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
THEMIS MISSION PDROVERVIEW- 1 UCB, November 12, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness.
THEMIS peer Instrument CDR 1 CETP, Paris, April 8, 2004 THEMIS Mission Status at Peer UCB Instrument Critical Design Review UCB, April 19/20, 2004 Vassilis.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Search Coil Magnetometer (SCM) Mission PDR/CAR Alain Roux CETP-Velizy Co-i: O.Le Contel Technical Manager:
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
THEMIS Instrument PDRParts- 1 UCB, October 15-16, 2003 Parts Requirements Preliminary Design Review Jorg Fischer University of California - Berkeley.
THEMIS FGM CDR Peer ReviewBerlin, April 6, 2004 THEMIS FGM Engineering Peer Review SC Integration and Test Ellen Taylor University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
THEMIS FGM CDR Peer ReviewBerlin, April 6, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness on.
FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THERMAL Chris Smith University.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
THEMIS Instrument FM2/FM3 PERSystems- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review System Overview Ellen Taylor University.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
THEMIS MISSION PDRMAG BOOM- 1 UCB, November, 2003 Magnetometer Booms (MAGS) Mission Preliminary Design Review Hari Dharan Space Sciences Laboratory University.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 213 Low Voltage Power Supply & Power Controller Board Peter.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes LVPS+PCB Peter BergRBSP/EFW CDR /30-10/1 IDPU LVPS AND PCB Critical Design Review.
THEMIS INSTRUMENT PDROVERVIEW- 1 UCB, October 15, 2003 THEMIS SYSTEM OVERVIEW Dr. Vassilis Angelopoulos, Science Overview Dr. Ellen Taylor, Mission and.
THEMIS Instrument PDRGSE- 1 UCB, October 15-16, 2003 IDPU Ground Support Equipment Preliminary Design Review F. Harvey University of California - Berkeley.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
THEMIS MISSION PDRINSTRUMENT OVERVIEW- 1 UCB, November, 2003 THEMIS INSTRUMENT PAYLOAD SYSTEM OVERVIEW Dr. Ellen Taylor University of California - Berkeley.
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
FM2/FM3 IPSR AND FM4/FM5 IPERSYS - 1 UCB, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW SYSTEM OVERVIEW.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 535 IDPU Chassis Bill Donakowski Mechanical Engineer UCB/SSL.
THEMIS Instrument Pre-Environmental Review 1 UCB 5/02/2005 THEMIS Instrument Pre-Environmental Review Project Status May 2, 2005 Peter R. Harvey THEMIS.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
THEMIS SRR Mission Requirements - 1 UCB July MISSION REQUIREMENTS Ellen R. Taylor Mission Systems Engineer Space Science Laboratory University.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Design Fluxgate Magnetometer (FGM) Werner Magnes Institut fuer Weltraumforschung (IWF) Austrian.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes Sept 30 – Oct RBSP EFW ICDR1 Integration and Test Michael Ludlam (EFW Systems Engineer)
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
Lunar Reconnaissance Orbiter (LRO) SRR/Mechanical System August 16-18, 2005
INSTRUMENT DATA PROCESSING UNIT (IDPU) REQUIREMENTS
CINEMA System Engineering
(EFW Systems Engineer) University of California, Berkeley
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
THEMIS Mission Assurance
THEMIS FM4/FM5 INSTRUMENT SUITE
Low Voltage Power Supply & Power Controller Board
University of California, Berkeley
Presentation transcript:

THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California - Berkeley

THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 2 UCB May 2, 2005 Requirement Development and Verification Process Top-Level requirements developed during Phase A Concept Study Report (CSR) provides basic mission concept Outlines top-level requirements imposed by science and programmatic objectives Mission requirements flowed down (to subsystem level), formalized and documented early in Phase B All elements of CSR concept and mission requirements reviewed by development team Mission Requirements Database (MRD) developed and reviewed MRD finalized and put under Configuration Control at System Requirements Review (SRR), July 2003 Subsystem Interfaces and Component Requirements further detailed in Phase B Interface Control Documents between Subsystems and Institutions System and Subsystem Specifications (Board Specifications, SOWs, etc) Mission Plans and Policies (PAIP, Risk Management Plan, FMECA, etc) Control Plans (Magnetics, ESC, Contamination)

THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 3 UCB May 2, 2005 Requirement Development and Verification Process Requirement Verification Plans developed in Phase B and C Development of Verification Matrix ensures a test or analysis is scheduled for all Mission Requirements in MRD Performance Verification and Environmental Test Plans provide launch and space environments and outlines comprehensive component, subsystem and system level test program Environmental Test Matrix (ETM) developed Requirements Compliance and Verification Matrices completed in Phase D MRD and ETM evolve into summary of verification and test program as run Documents Verification and Compliance Status of all Requirements Provides direct trace-ability from requirements to test procedures and reports

THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 4 UCB May 2, 2005 Performance Verification Performance Verification Program Applies to all technical requirements stated in MRD and associated documents Each item in MRD has field for verification method Performance Verification Methodology Verification of requirements is by Inspection (I), Analysis (A), Test (T) or combination Tasks for each method include: establishing the criteria; preparing plans and procedures; implementing; and documenting the results. Performance Verification Levels Verification will be performed at one or more of following levels: Component, Sub-Assembly, Assembly, Subsystem, System Example from THEMIS MRD Verification Matrix:

THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 5 UCB May 2, 2005 MRD Status Mission Requirements Document (MRD) Status MRD Rev A released at System Requirements Review (SRR) MRD Rev B released prior to Instrument and Subsystem Peer Reviews MRD Rev C released at Mission PDR MRD Rev D released during Instrument and Subsystem Peer Reviews Incorporated MPDR RFAs and System Change Notices (SCNs) since PDR Added compliance and detailed verification plan (I/A/T) for each requirement MRD Rev E released at Mission CDR MRD Rev F will be released at Mission PER Working version of Rev F is used to track verification status of all requirements Most Instrument performance requirements have been verified during the ETU development and test w/ all instruments meeting or exceeding required performance One waiver is expected for Instrument requirements – SST exceeds magnetic budget allocation

THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 6 UCB May 2, 2005 Environmental Verification Environmental Test Program Instrument hardware is tested to environmental requirements using GEVS as a Guideline per CDRL THM-SYS-005 THEMIS Instrument Payload Verification and Environmental Test Specification and summarized in Environmental Test Matrix (ETM) Environmental Test Methodology Each hardware item in ETM has fields for test description, test date, and procedure/report Applies to all instrument assemblies, subsystems and systems Example from THEMIS Environmental Test Matrix as-runs:

THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 7 UCB May 2, 2005 ETM Status Environmental Test Matrix (ETM) Status ETM presented at Mission CDR and delivered to GSFC as CDRL ETM has been further reviewed with minor changes to overall plan Temperature updates to the Instrument and Instrument Suite Level based on thermal modeling refinements, add strength test to AXB carbon tube ETM has evolved into summary of test program as-run Working version is used to track test status of all instrument systems Most Instruments have successfully completed all environmental tests on FM1 units FM1 Mag Booms have not finished Thermal Vacuum Testing – expected mid May FM1 ESA has not gone through Thermal Vacuum Testing – will occur after suite TV

THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 8 UCB May 2, 2005 Environmental Test Matrix

THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 9 UCB May 2, 2005 MRD Instrument Suite Requirements Lifetime and Radiation Resource Budgets Thermal Contamination Interfaces Test and Verification Suite MRD Verification

THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 10 UCB May 2, 2005 Instrument Payload

THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 11 UCB May 2, 2005 REQUIREMENTVERIFICATION METHOD IN-1. The Instrument Payload shall be designed for at least a two-year lifetime I/A: All systems designed to two years and analyzed for two year mission IN-2. The Instrument Payload shall be designed for a total dose environment of 33 krad/year (66 krad for 2 year mission, behind 5mm of Aluminum, RDM 2) IN-3. The Instrument Payload shall be Single Event Effect (SEE) tolerant and immune to destructive latch-up A: GSFC Ray Trace Radiation Analysis provides radiation environment for instrument; I/T: Parts selected with known radiation characteristics or radiation tested for TID and/or SEE Lifetime and Radiation Status GSFC Radiation Analysis complete. See Table 2 from report below. Environment < 33 krad for all instruments except ESA (81.5 krad) Additional electronics shielding added to ESA 100% Instrument Parts screened for TID/SEE requirements. Approx. 20 parts were tested. No parts that failed radiation testing are being used LVPS redesign required - reduced supply efficiency

THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 12 UCB May 2, 2005 REQUIREMENTVERIFICATION METHOD IN-6. The Instrument Payload shall not exceed the total allocated mass budget in THM-SYS-008 THEMIS System Mass Budget.xls T: Instrument payload will be weighed. IN-7. No component of the Instrument Payload shall exceed the allocated mass budget in THM-SYS-008 THEMIS System Mass Budget.xls T: Instruments will be weighed prior to delivery. Resource Budgets - Mass CBE: kg Allocation: kg Contingency: 2.2% Status Approx. 98% of ETU Instrument Payload has been weighed

THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 13 UCB May 2, 2005 REQUIREMENTVERIFICATION METHOD IN-8. The Instrument Payload shall not exceed the total power allocated in THM-SYS-009 THEMIS System Power Budget.xls T: Instrument payload power will be measured. IN-9. No component of the Instrument Payload shall exceed the power allocated in THM-SYS-009 THEMIS System Power Budget.xls T: Instrument power will be measured prior to delivery. Resource Budgets - Power CBE: W Allocation: W Contingency: -1.0% Status Approx. 90% of ETU Instrument Payload power has been measured (all Instruments except ESA) ~3x power increase between ETU and Flight Actels was estimated and additional resistor load put on 2.5V line for ETU system

THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 14 UCB May 2, 2005 REQUIREMENTVERIFICATION METHOD IN-10. The Instrument Payload shall not exceed the allocated data budget of 750Mbits/orbit (uncompressed) A/T: Analysis of data rates, data budget, system states over an orbit; analysis verified during functional/performance testing IN-11. The Instrument Payload shall be capable of storing 1 orbit + 1 days worth of Instrument Science and housekeeping data. A/T: Analysis of storage capability, FSW storage efficiency; analysis verified during functional/performance testing Resource Budgets - Data Status 187.5MB storage is required (750Mbits/orbit + 1 day contingency = 1500Mbits = 187.5MB) DCB contains 256MB SDRAM for TM storage. Upper quadrant is devoted to ECC. Memory analysis using predicted data rates from Instruments show storage is sufficient for 4 day orbit + 1day contingency at worse-case spin period of 2.7seconds.

THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 15 UCB May 2, 2005 REQUIREMENTVERIFICATION METHOD IN-13. The Instrument Payload shall survive the temperature ranges provided in the ICDs A/T: Thermal analysis and modeling provides temperature predictions for Instrument Survival; Instruments are thermally tested to predicts plus margin IN-14. The Instrument Payload shall perform as designed within the temperature ranges provided in the ICDs A/T: Thermal analysis and modeling provides temperature predictions for Instrument Science Mode; Instruments are thermally tested to predicts plus margin Thermal Requirements Status ETU Instruments are tested to Thermal Limits +10 degrees Flight Instruments are tested to Thermal Predicts +10 degrees FM1 Flight Instruments have completed Thermal Vacuum Testing, with the exception of: FM1 Mag Booms – TV not completed due to deployment problems. Will be completed following suite TV, as it needs the same facility. FM1 ESA – to be completed after suite TV. ETU ESA Pre-Amp was tested in IDPU TV Test. ETU ESA Actuator was tested in separate Release Plate Assembly TV Test.

THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 16 UCB May 2, 2005 REQUIREMENTVERIFICATION METHOD IN-16 The Instrument Payload shall comply with the Magnetics Cleanliness standard described in the THEMIS Magnetics Cleanliness Plan I/A/T: Verification assured by Magnetics Committee per component budget and requirements provided in THM-SYS-002 Magnetics Control Plan; Components measured prior to Probe Integration in Coil facility. IN-17 The Instrument Payload shall comply with the THEMIS Electrostatic Cleanliness Plan I/A/T: Verification per THM-SYS-003 ESC Control Plan; Analysis provides allowable resistance/area and insulator budget; Measurements are made at system level. IN-18 The Instrument Payload shall comply with the THEMIS Contamination Control Plan I/A/T: Verification per THM-SYS-004 Contamination Control Plan; Thermal Vacuum Bake-out planned w/ TQCM monitoring. Contamination Requirements Status Worse-case offenders for Magnetics is EFI Motors, SST magnets, IDPU switching frequencies ETU EFI Boom motors w/ mu metal shielding tested at UCLA, meets budget of m SST Magnets analysis and testing show careful selection of magnets and pairing of sensors can reduce the dc field at the FGM Sensor to within the allotted budget. Sensors do need to be mapped at earliest opportunity. IDPU frequency management plan has implemented in LVPS - switching frequencies above 100 kHz, separated by 10 kHz to avoid beat frequencies in science range. Compatibility testing with SCM verifies instrument power supply frequencies are outside science range.

THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 17 UCB May 2, 2005 REQUIREMENTVERIFICATION METHOD IN-19. All Instruments shall comply with the electrical specifications T: Requirements provided in THM-IDPU-001 Backplane Specification; interfaces verified during IDPU integration. IN-20. The Instrument Payload shall be compatible per IDPU-Instrument ICDs T: Instruments tested to ICD prior to delivery; interfaces verified during I&T of Instruments to IDPU IN-21. The Instrument Payload shall be compatible per the IDPU-Probe Bus ICD T: Instrument Payload tested to ICD prior to delivery; interfaces verified I&T of IDPU to Probe IN-22. The Instrument Payload shall be compatible per Instrument-Probe Bus ICDs T: Instrument Payload tested to ICD prior to delivery; interfaces verified during I&T of Instrument Payload to Probe Interface Requirements Status All FM1 Instrument Boards (DAP, ETC, FGE, DFB, BEB) have been integrated and tested with FM1 IDPU core system (LVPS, DCB and PCB) All Instruments (SSTs, ESA, EFI Pre-Amp & Booms, FGM, SCM, Mag Booms) have been integrated and tested with FM1 IDPU box (Core System and Instrument Boards) Data Interface between IDPU and Probe BAU has been tested on 3 occasions (UCB- Swales I/F Tests: July, October, December 2004). Various levels of interface verification completed during each test. Power Interface Test planned for January? Mechanical Hi-Fi Instrument Mock-ups provided to Swales for Integration to Hi-Fi Probe. Mass Models provided to Swales for Structure Strength and Thermal Testing.

THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 18 UCB May 2, 2005 REQUIREMENTVERIFICATION METHOD IN-23 The Instrument Payload shall verify performance requirements are met per the THEMIS Verification Plan and Environmental Test Specification I/A/T: Performance Requirements met as documented in MRD Verification Matrix IN-24 The Instrument Payload shall survive and function prior, during and after exposure to the environments described in the THEMIS Verification Plan and Environmental Test Specification I/A/T: Environmental Test Requirements met as documented in Environmental Test Matrix (ETM) Suite Verification and Test Status As provided in MRD and ETM and summarized during Review: ftp://apollo.ssl.berkeley.edu/pub/THEMIS/1 Management/1.3 Systems Engineering/1. Requirements/thm_sys_001f_MRD.pdfftp://apollo.ssl.berkeley.edu/pub/THEMIS/1 Management/1.3 Systems Engineering/1. Requirements/thm_sys_001f_MRD.pdf ftp://apollo.ssl.berkeley.edu/pub/THEMIS/1 Management/1.3 Systems Engineering/1. Requirements/thm_sys_005AppA_InstrumentETM.pdfftp://apollo.ssl.berkeley.edu/pub/THEMIS/1 Management/1.3 Systems Engineering/1. Requirements/thm_sys_005AppA_InstrumentETM.pdf

THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 19 UCB May 2, 2005 Design Changes Since CDR System Change Notices