Fort George G. Meade KEMRON PBC Sites Near-Term Deliverables Update Operable Units 1, 3 and 5 Restoration Advisory Board Meeting March 17, 2011 KEMRON.

Slides:



Advertisements
Similar presentations
Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.
Advertisements

WIOA Timeline and Action Plan for States
Presentation to the Standing Committee on Appropriations (SCOA) 2013/14: Q3 Performance and Expenditure reports DATE: 19 February 2014 The Presidency Department.
Central Valley Flood Protection Board Meeting – Agenda Item No. 5C Central Valley Flood Protection Board.
BoRit Superfund Site Timeline
1 Fort Monroe: An Update on the Environmental Cleanup VDEQ Presentation to the Fort Monroe Federal Area Development Authority March 19, 2009.
Identify source area and COCs Determine nature and extent of discharge Evaluate potential risks to public health and the environment Develop Investigation.
1 High Production Volume (HPV) Challenge Program – Future Directions Jim Willis Director, Chemical Control Division, Office of Pollution Prevention and.
MARSSIM Revision 2 Request for Input Public Meeting February 10, 2011 Kathryn Snead MARSSIM Workgroup Chair.
2009 Performance Assessment Member Representatives Committee Meeting October 28, 2008.
Fort George G. Meade Groundwater Contamination, Odenton, Maryland Interim Measures Update Restoration Advisory Board Meeting November 18,
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
Pershing Hill Elementary School Burn Pit Stockpile Removal Project 1.
Fort George G. Meade Groundwater Contamination, Odenton, Maryland Interim Measures Update Restoration Advisory Board Meeting March 25,
Time schedule for ex ante evaluation and Strategic Environmental Assessment (SEA) Romania-Bulgaria Cross-Border Cooperation Operational Programme
February 18, 2004 Public Meeting Barge 120 Spill Buzzards Bay, Massachusetts.
Monitoring & Oversight Adult Education and Literacy (AEL) Programs Brenda B. Williams Project Manager Texas Workforce Commission Regulatory Integrity Division.
Michigan Department of Education Office of Field Services Consolidated Application Schedule.
Comprehensive Regional Growth Plan UPDATE November 15, 2007.
Proposed Amendments to Enhanced Vapor Recovery Regulations November 18, 2004 Monitoring and Laboratory Division Air Resources Board California Environmental.
Forging Partnerships on Emerging Contaminants November 2, 2005 John Vandenberg Associate Director for Health National Center for Environmental Assessment.
Transportation Improvement Program Status and Update.
Advisory Committee Kickoff Meeting SWRCB Program to Develop Sediment Quality Objectives for Enclosed Bays and Estuaries of California July 29, 2003 CAL/EPA.
The TNI National Environmental Laboratory Accreditation Board Update Daniel Hickman, NELAP Board Chair.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
VDOE Updates VESA Meeting October 1, 2015 Stacy Freeman, Title III Specialist Office of Program Administration and Accountability Virginia Department of.
Northeast Corridor Greenway Acquisition Project – Design and Permitting Status Update City Council Workshop August 25, 2015.
Team Successes at the Former Memphis Depot, Memphis, Tennessee Presented by: David D. Nelson, P.G.Thomas C. Holmes Project Manager, CH2M HillProject Manager,
International Speedway Boulevard Stakeholders Task Force (STF) Meeting 1 Wednesday, May 19, 2010.
HEALTH WORKFORCE HEALTH SYSTEM TRANSFORMATION Oklahoma State Innovation Model.
1 RAB Update Trap and Skeet Range 17 Remedial Investigation Activities 25 March 2010.
How: Overview of Action Plan and Data Utilization Shane McNeill, Director Office of Healthy Schools.
Former DuPont Barksdale Works Project Update July 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Date Planning for Compliance with the Final 316(b) Phase II Regulations For APPA – March 8, 2004 David E. Bailey EPRIsolutions.
Work Related to Senate Bill 2202 (effective January 1, 2001)
The TNI National Environmental Laboratory Accreditation Board Update Daniel Hickman, NELAP Board Chair.
1 Briefing on the Draft Call for Projects and Schedule for the Air Quality Conformity Assessment for the 2011 CLRP and FY TIP Technical Committee.
Advisory Council 8 th Meeting 20 th February 2008 Newpark Hotel, Kilkenny.
Landfill Study Board initiated a unique, 2-phase, cross-media study of the state’s MSW landfills and contracted with GeoSyntec Consultants. Phase 1 consists.
Update to Proposition 1E – Early Implementation Project (EIP) Application and Local Share Reclamation Board Sub-Committee Meeting September 11, 2007.
Update on USS Pension Fund Staff Presentations 26 th November December 2014 Will Spinks Registrar, Secretary and Chief Operating Officer.
Landfill Study Board initiated a unique, 2-phase, cross-media study of the state’s MSW landfills and contracted with GeoSyntec Consultants. Phase 1 consists.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Fort Detrick Installation Restoration Program Area B Groundwater November 1, 2010 Fort Detrick, Maryland A Sustainable Community of Excellence.
Field Analyst Support Team (FAST) School Finance Division
Proposed Plan for No Further Action
Evaluation of FY12 Tracking and FY13 Planning Process
FY 2018 Budget Review Process and Schedule
TN: TEACH AACTE Grant TN TEACH: The TN EPP Assistive and Collaborative Help Network.
Stop-Loss Submissions
Arsenic Acceptable Ambient Level Revision
Attendance, Introductions & Correspondence Old Business
Update – SACSCOC Off-Site and On-Site Visits
Process, timeline and overview
ESCA Remediation Program Update
Department of Environmental Quality
Potential Milestones A timeline to finish in one year
Fort George G. Meade Restoration Advisory Board Web Site Update Restoration Advisory Board Meeting November 18, 2010 Prepared by the Fort George.
Jessica Montie, Division of Waste Management
Department of Environmental Quality
Parkway School District Tech Plan
Goal: Improve Nominating Process for Board of Directors
Julie Woosley, Division of Waste Management
Environmental Management Commission, March 9, 2017
Department of Environmental Quality
Jessica Montie, Division of Waste Management
TGaf San Antonio Closing Report
DSC ChMC CSS update 09th January 2019
Review plan of the nature reporting – update 6
2017 TIP Project Solicitation Status Update
Presentation transcript:

Fort George G. Meade KEMRON PBC Sites Near-Term Deliverables Update Operable Units 1, 3 and 5 Restoration Advisory Board Meeting March 17, 2011 KEMRON Environmental Services, Inc. 1

2

3 KEMRON Contract Sites Operable Unit (OU) 1, FGGM-83, Former Trap and Skeet –Used for recreational activities; was not a military range OU-3, FGGM-87, Former Nike Missile Control Site –Former radar tower no longer present at the site OU-5, FGGM-07, Defense Reutilization and Marketing Office (DRMO) –Remains in use currently Update on all sites was provided in November 2010 RAB Meeting 3

4 Operable Unit 1, FGGM-83, Former Trap & Skeet KEMRON submitted the Draft Remedial Investigation Report in December 2010 USEPA comments received March 10, 2011 are under review Formal responses to comments and revised RI Report anticipated to be submitted in mid to late May 2011 Following USEPA and MDE approval of RI Report, Feasibility Study (FS) will be prepared and submitted to identify and evaluate potential response actions (submission date: TBD) 4

5 Operable Unit 3, FGGM-87, Former Nike Missile Control Site KEMRON submitted Revised Screening Level Ecological Risk Assessment for USEPA and MDE review and comment on October 18, 2010 USEPA comments received February 04, 2011 Responses to comments on SLERA will be submitted in further revision to the SLERA, which will be included in an RI Report - scheduled to be submitted in May 2011 RI Report will be a revision of the January 2008 RI Report previously submitted for regulator review An FS will be prepared after USEPA and MDE concur with the Final RI Report (submission date: TBD) 5

6 Operable Unit 5, FGGM-07 DRMO US Army has been collecting additional environmental samples and conducting laboratory analyses to fill data gaps identified by USEPA in the 2003 RI Report Sampling was completed on February 26, 2011 and laboratory analyses are in progress After analytical data are compared to risk-based screening values, the Army and its contractors (KEMRON/ARCADIS) in conjunction with USEPA and MDE, will determine what further steps are necessary to resolve all outstanding regulatory comments on the 2003 RI Report and complete an FS

7 Additional Updates The OU-1 Draft Final RI Report and the OU-3 Revised SLERA were submitted electronically to the RAB members The Army and KEMRON plan to meet with USEPA and MDE in early April for technical discussions about all three sites Additional updates will be provided as the CERCLA RI Reports for OU-1 and OU-3 move toward final versions More information will be available on what additional work is forthcoming for OU-5 after all data are received and evaluated against screening values

Acronyms and Abbreviations 8 CERCLAComprehensive Environmental Response, Compensation, and Liability Act DRMODefense Reutilization and Marketing Office EPAEnvironmental Protection Agency FGGMFort George G. Meade FSFeasibility Study MDEMaryland Department of the Environment OUOperable Unit PBCPerformance Based Contract RIRemedial Investigation SLERA Screening Level Ecological Risk Assessment

9 Points of Contact U.S. Army Garrison Fort George G. Meade Directorate of Public Works-Environmental Division 2212 Chisholm Avenue, Suite 5115 Fort Meade, Maryland Paul Fluck, PG, REP –Environmental Restoration Manager – George Knight, PG –Environmental Project Manager –