MCC 3GPP Work program Database Ian Doig, MCC. 3GPP Work program Database Request by Partner Organisations for a common 3G Work program Database. Based.

Slides:



Advertisements
Similar presentations
SEM10-04 Initiation of a Work Item ETSI Seminar © ETSI All rights reserved.
Advertisements

Status Report Presentation. Is this initiative ahead of schedule (why – explain)? Is this initiative on schedule (why – explain)? Is this initiative.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 12a 1 All you always wanted to know about.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 4 1 All you always wanted to know about.
The MCC Specs database A guided tour. The Specifications panel …
1 3GPP TSGs SA Meeting #49, San Antonio, Texas, USA, September 2010 SP © 3GPP Organizational Partners Satisfaction survey results In.
JMM1 Editing a 3GPP spec - tips for experts Move to next slide.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 8 1 All you always wanted to know about.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 10 1 All you always wanted to know about.
7 Feb 2000JMM1 Editing a GSM spec - tips for experts.
All you always wanted to know about 3GPP … but were too afraid to ask.
Status Report on GSM (SMG #29) TSG-T3 #7 Lund, July 1999 TSG-T Dr. Klaus Vedder Chairman SMG9.
MCC 3G and GSM Specification Handling Ian Doig, MCC.
TC SCP REQ STATUS REPORT TO PLENARY #63 Davide Pratone, Chairman, Telecom Italia SCP(14)
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 7 1 All you always wanted to know about.
Release 2: Work Items best practices Group Name: TP15 Source: Scarrone Enrico, Telecom Italia Meeting Date:
Methods Of Work Ad hoc Report TP#11 Source: Enrico Scarrone, Telecom Italia, Meeting Date:
How ETSI publishes 3GPP specifications. 15 October 2000JMM2 A 3GPP specification is based on the standard template (available from
4.6 Creation of 3GPP 4.7 How does 3GPP Operate? 4.11 Beyond 3GPP Release ’99.
Configuration Management Avoiding Costly Confusion mostly stolen from Chapter 27 of Pressman.
The change control cycle Or Where little 3GPP specifications come from …
© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
‘One Sky for Europe’ EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 VALIDATION DATA REPOSITORY Overview.
30-31 March 2005 Workshop "IMS over Fixed Access" - Washington 1 TISPAN_NGN Project plan Martin Niekus Alain Sultan
NGN Management Focus Group 2 November 2004 Dave Sidor Interim Chairman Nortel Networks Tel Fax
WPM What’s behind the icon? Work Programme Management.
The life-cycle of a 3GPP Spec Abridged for family viewing.
Project Management-Manufacture
1 An Analysis of 3GPP and 3GPP2 Requirements for Common IMS January 2008 Source:Aleksandar M. Gogic, Chair TSG-S WG-1.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
WG-2 - ARC TP #16 Status Report Group Name: oneM2M TP #16 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
3GPP Rel-13 Interworking discussions
© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
Guidelines for: Release Maintenance, Small Enhancement and Feature Work Items Group Name: TP15 Source: Mow Convenor, (Scarrone Enrico, Telecom Italia)
1 LTE standards Status for this work in 3GPP and what next for the Future Francois COURAU 3GPP TSG RAN Chairman.
12/2/2004Module 2A1 The NCSX Engineering Web – An Overview Part I Work Planning, Project Files, Management Plans and Procedures.
WebScan Change Order. WebScan change order: What is it? Beginning in 2010 changes to a WebScan order will need to be submitted via a WebScan change order.
The change control cycle Or Where little 3GPP specifications come from … Move to next slide.
WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
TSG-S Project Coordination Recommendations Nick Yamasaki TSG-S Chair ABSTRACT: This document presents TSG-S recommendations for improved coordination of.
WG 2 Progress Report at TP#9 Group Name: oneM2M TP #9 Source: WG2 leadership Meeting Date: /21 Agenda Item: WG Reports.
1 Harmonization Meeting on 3GPP HSDPA and 3GPP2 1xEV-DV Work New-Jersey Nov 2001 HSDPA - Simulation Assumptions in 3GPP TSG RAN WG1 Chairman Antti.
3GPP Rel-13 Interworking discussions
NGN Management Focus Group (December 2004) - 0 3GPP TS Flow-based charging requirements Title: 3GPP Overall high level functionality and architecture.
Future Meetings for TSG-S TSG-S Chair Nick Yamasaki (KDDI) 21 July
3GPP2 Specification Development David Crowe cdma2000 Technology Workshop June 14, 2012 – Guangzhou, China Draft Version 0.1.
Click to edit Master text styles –Second level Third level –Fourth level »Fifth level 1 WPM What’s behind the icon? Work Programme Management.
WG5 – MAS#21 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
WG2 - ARC TP #20 Status Report Group Name: oneM2M TP #20 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
WG5 – MAS#22 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Tim Carey(Alcatel-Lucent, WG5 Vice Chair) Meeting Date:
WPM ad-hoc group report TP#20 Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
WG1 - REQ Progress Report at TP #11 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chairs Meeting Date: to Agenda Item: TP#11,
CM Spec analysis Markup from discussion 15/3. Summary of the scenario by way of the key business entities & their relationships CR Req Implem System or.
20 September 2004 C R4 0 Proposed Process for TSG-C Work Items Source Alberto Gutierrez Motorola
Tm&i 2010 V.1 technology management & innovation introduction to project management (i) project definition & scope.
3GPP Rel-13 Interworking discussions Group Name: TP #18 Source: Rejesh Bhalla, ZTE Corporation, Meeting Date: Agenda Item:
ETSI–3GPP NGN ACTIVITIES
ETSI–3GPP NGN ACTIVITIES
WPM ad-hoc group report TP#24
3GPP Rel-13 Interworking discussions
WPM ad-hoc group report TP#25
The lonely road or How a spec gets from WG Secretary to the server, and how it gets published as an ETSI deliverable 1.
Motivation for WI on "LTE-based V2X Services"
3GPP Status.
[Project Name] STEERING COMMITTEE UPDATE [Date]
3GPP WLAN Interworking update
ETSI–3GPP NGN ACTIVITIES
Dino Flore TSG-RAN Chairman Balazs Bertenyi TSG-SA Chairman
Presentation transcript:

MCC 3GPP Work program Database Ian Doig, MCC

3GPP Work program Database Request by Partner Organisations for a common 3G Work program Database. Based on ETSI WPM, but modified for 3GPP (Still under development, but basic functions available now). Available for use by SA/SA2 in their project management role.

3GPP Work program Database Release “Road map” report –Feature content listing for release Ongoing work status report –Progress of individual features via Work Package Codes –Status of relevant specifications –Specifications impacted by WPs TSG Specification Release report –TSG#x status list

3GPP Work program Database WG specific Specification report –Status of all specifications under WG responsibility Individual Specification status report –Scope –current Version –History –Approval target dates –Editors/Rapporteurs comments –Editors/ Rapporteur contact details –Responsible WG

3GPP Work program Database WWW Access to all Reports –Reports available as “in depth detail” or “short style” (e.g spec number, Title and current Version) –Hyperlink to individual specification status and history –Hyperlink to individual specification download

3GPP Work Program Database Search available on: –Work Package code e.g. AMR –Spec or report number –WG –TSG –Release (99, 00 etc) –TSG SA spec release (June 99 Oct 99 etc) –Keyword Reports Missed Target dates

3 G Work Package (3GWP) SMG described WPs as WIs –A Work “Package” may produce or identify: specification(s) (deliverable Work Item(s)) CR(s) to existing specification(s) Feasibility study Further “Sub”work packages –A WP is allocated a WP code e.g.VHE, AMR, SAR etc.(should align with CR DB abbv codes) May be Hierarchical

3 G Work Package (3GWP) Simple WP Specific Absorption Rate Report WP (SAR)WI xxx Spec CRs WP (xxx)WI

3 G Work Package (3GWP) GPRS ( Hierarchical ) WP Charging and Billing for GPRS Advice of Charge Hot Billing Pre-Paid GPRS Enhanced QoS Support in GPRS Study Spec CRs Spec Study CRs WP (GPRS) WP (GPRSCB) WP (GPRSAoC) WI WP (GPRSHB) WP (GPRSPP)

3GPP Work program Database Individual Spec data Work “Package” data Work “Package” data Individual Spec data Release data (Collection of WPs e.g. R2000) Spec Status data (e.g. Spec status list) Work package (e.g. LCS) Work package

3 G Work Package (3GWP) Feasibility study (TR) Stage 1 description (TS) Stage 2 description (TS) Stage 3 description (TS) CRs to existing specs Start of Work Completion New feature LoCation Services WP Code (LCS) 3GWP/TSGS-02LCSU Schedule dates give V3.0.0 approval or target dates of Specs and CRs Linked via WP code LCS

Example

3GWP /TSGS-02LCSU 3GWP = 3 GPP Work Package. TSGS = TSG Services and System Aspects. 02 = S2. LCS = example WP code (abbreviation). U = UMTS (temporary)

3GTR/TSGS U Version Version Version Version Version 3.x.y Completion Feasibility study TR Code” LCS”

Example Report schedule

3GTS/TSGS U Version Version Version Version Version 3.x.y Start of Work on new spec Evolution Stage 1 description TS Code” LCS” Version 3.x+1.y Version 3.x+2.y Corrective LCS CR CR as result of another WP Schedule dates give V3.0.0 approval or predicted dates of Specs and CRs

Example

WP and specification links V0.0.0 V1.0.0 V2.0.0 V3.0.0 V3.x.y TS Evolution Stage 1 description TS Code” LCS” V3.x+1.y V3.x+2.y Feasibility study (TR) Stage 2 description (TS) Stage 3 description (TS) CRs to existing specs Completion R2000 New feature LoCation Services WP Code (LCS) Schedule dates give V3.0.0 target/achieved dates of Specs and CRs Stage 1 description (TS) Work Package ex. LCS CRs resulting from other WPs

WP Code WP Code Search gives the following information on the progress of a particular WP (e.g.LCS): –3GWP/TSGS-02LCSU Identifies scope of WP and impacts Identifies output of WP (Study, Stage 1, Stage 2 etc) Milestone target dates (Stage 1 approved etc) completion date (e.g. 31/6/2000, WP becomes part of R2000) –3GTS/TSGS U (TS ) Specification title and scope V1.0.0, 2.0.0, target and achieved dates Evolution History Admin details (editor, WG, comments contacts etc.) –3GTS/TSGS U (TS ) –3GTS/TSGS U (TS )