Doc.: IEEE 802.11-07/0724r1 Submission May 2007 Darwin Engwer, Nortel NetworksSlide 1 VHT Study Group Thoughts Notice: This document has been prepared.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0247r1 Submission March 2005 Atsushi FujiwaraSlide 1 Advantages of multiple channel usage in 11s WLAN Mesh network Notice: This document.
Advertisements

Doc.: IEEE /90r0 Submission Nov., 2012 NICTSlide b NICT Proposal IEEE P Wireless RANs Date: Authors: Notice: This document.
Doc.: IEEE /0930r0 Submission July 2006 Nancy Cam-Winget, Cisco Slide 1 Editor Updates since Jacksonville Notice: This document has been prepared.
Doc.: IEEE /0024r0 Submission May 2006 Steve Shellhammer, QualcommSlide 1 Discussion of Coexistence Scenarios Notice: This document has been prepared.
Doc.: IEEE /0094r0 Submission November 2009 Steve Shellhammer, QualcommSlide 1 Comments on PAR Notice: This document has been prepared.
Doc.: IEEE /0534r0 Submission May 2005 Steve Shellhammer, Intel CorporationSlide 1 Thoughts on Modifications of the TGn Functional Requirements.
Doc.: IEEE /2237r0 Submission July 2007 Emily Qi, Intel CorporationSlide 1 TGv Redline D1.0 Insert and Deletion Notice: This document has been.
Doc.: IEEE /1606r0 Submission January 2005 Darwin Engwer, Nortel NetworksSlide 1 AP Functions Diagram Notice: This document has been prepared.
Doc.: IEEE /1212r0 Submission TGT and MEF Liaison Notice: This document has been prepared to assist IEEE It is offered as a basis for.
Doc.: IEEE /1528r0 Submission 22 September 2006 Naveen Kakani, Nokia, IncSlide 1 TGn PSMP adhoc Group September Closing Report Notice: This document.
Doc.: IEEE /0220r0 Submission March 2005 Peter Ecclesine, Cisco SystemsSlide Liaison Report Atlanta Notice: This document has been prepared.
Doc.: IEEE /0197r0 Submission March 2005 Nancy Cam-Winget et alSlide 1 TAP & JIT Merge Process Notice: This document has been prepared to assist.
Doc.: IEEE /0186r0 Submission January 2007 Guenael Strutt, MotorolaSlide 1 RFI London Update Notice: This document has been prepared to assist.
Doc.: IEEE /0652r1 Submission May 2007 Emily Qi, Intel CorporationSlide 1 TGv Redline D0.12 Insert and Deletion Notice: This document has been.
LB84 General AdHoc Group Sept. Closing TGn Motions
[ Interim Meetings 2006] Date: Authors: July 2005
LB73 Noise and Location Categories
LB73 Noise and Location Categories
Waveform Generator Source Code
[VHT SG Approach Proposal]
March 2014 Election Results
TGp Closing Report Date: Authors: July 2007 Month Year
Attendance and Documentation for the March 2007 Plenary
[ Policies and Procedure Summary]
Motion to accept Draft p 2.0
3GPP liaison report July 2006
[place presentation subject title text here]
Descriptive Language Usage in TGv
(Presentation name) For (Name of group) (Presenter’s name,title)
On Coexistence Mechanisms
[Comparison between CDMA Code and Contention-based Access]
TGu-changes-from-d0-02-to-d0-03
TGp Closing Report Date: Authors: May 2007 Month Year
November Opening Report
On Coexistence Mechanisms
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGu Timeline Date: Authors: January 2005 January 2005
TGv Redline D0.06 Insert and Deletion
Experimental DTV Sensor
IEEE WG Opening Report – July 2008
ADS Study Group Mid-week Report
Selection Procedure Recommendation
IEEE P Wireless RANs Date:
TGu-changes-from-d0-01-to-d0-02
LB73 Noise and Location Categories
IEEE White Space Radio Intended timeline
TGy draft 2.0 with changebars from draft 1.0
TGv Redline D0.10 Insert and Deletion
IEEE WG Opening Report – July 2007
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
– Looking Ahead to the Future
November Opening Report
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
3GPP2 Liaison Report Date: Authors: May 2006 May 2006
Draft P802.11s D1.03 WordConversion
Questions to the Contention-based Protocol (CBP) Study Group
Motion to go to Letter Ballot
EC Motions – July 2005 Plenary
TGu-changes-from-d0-04-to-d0-05
TGu-changes-from-d0-03-to-d0-04
TGu Timeline Date: Authors: January 2005 January 2005
TGu Motions Date: Authors: May 2006 May 2006
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Wireless Architectural Thoughts
TGu Timeline Date: Authors: July 2005 July 2005
TGr Proposed Draft Revision Notice
Selection Procedure Recommendation
Presentation transcript:

doc.: IEEE /0724r1 Submission May 2007 Darwin Engwer, Nortel NetworksSlide 1 VHT Study Group Thoughts Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at. Date: Authors:

doc.: IEEE /0724r1 Submission May 2007 Darwin Engwer, Nortel NetworksSlide 2 Abstract Some thoughts on the new “Very High Throughput” Study Group.

doc.: IEEE /0724r1 Submission May 2007 Darwin Engwer, Nortel NetworksSlide 3 Outline Naming the activity Possible Approaches Possible Process Possible Timelines Possible Technologies

doc.: IEEE /0724r1 Submission May 2007 Darwin Engwer, Nortel NetworksSlide 4 Naming the Activity The operating name of this activity is important The name guides the effort “Very High Throughput” is too vague and is a relative term My objective in catalyzing the formation of this group was to move beyond Mbps and into the Gbps era, in order to support the transition of the next set of applications from non-wireless medium to wireless Hence I favor a name that reflects that objective, e.g. “gigabit wireless”, or some such terminology

doc.: IEEE /0724r1 Submission May 2007 Darwin Engwer, Nortel NetworksSlide 5 Possible Approaches (1/2) Amendment to existing standard, or New Series? –Amendment to , or –A NEW standard – a whole new series of Amendment –An amendment would be built-upon but limited-by current standard –Backwards compatibility would need to be built-in and automatic, in the same way that 11g is backwards compatible with 11b and 2.4 GHz 11n is backwards compatible with 11b/g, i.e. new implementations must include mechanisms to directly decode/ encode existing frames. New Series –Opens up the field (both MAC and PHY) to the best technologies –NO limits, e.g. could operate in new bands –Backwards compatibility can be achieved by including an existing a/b/g/n chip in the same device along with the new, [Series 2] Gigabit Technology. –I like this approach, but there are complications …

doc.: IEEE /0724r1 Submission May 2007 Darwin Engwer, Nortel NetworksSlide 6 Possible Approaches (2/2) The New Series approach opens up the field and allows us to explore options that would not otherwise be available to us if we must constrain the technology to directly recognize existing PHY frames in the air. But, how do we prevent a whole new series from requiring redevelopment of all aspects of the WLAN, including security, QOS, measurements, management and so on? Hence, the overall approach remains an open question for discussion – one that is very important and worthy of careful consideration.

doc.: IEEE /0724r1 Submission May 2007 Darwin Engwer, Nortel NetworksSlide 7 Possible Process Begin high level discussions around new research and technologies that can be brought to bear on the problem - careful to not go too deep too soon. –i.e. apply a process of successive refinement - start broad and gradually narrow the scope over time. See for a high level enumerated list of the suggestions that were sent to me via . For example, I suggest we defer deciding on a band of operation until we see some early feasibility studies of what’s possible in the various bands that are available. I suggest that we encourage submission of a few feasibility study type presentations to start to get an idea of the technology or research that can be brought to bear on the subject.

doc.: IEEE /0724r1 Submission May 2007 Darwin Engwer, Nortel NetworksSlide 8 Possible Timelines Possibility #1 - Aggressive –2007 May-Sept SG - construct PAR+5G –2007 Nov - TG formed –2008 comparison criteria/ CFP/ technical proposal submissions –2009 technology selection –2010 refinement/ review –2011 official standard Possibility #2 – More realistic(?) –2007 May-Sept SG - construct PAR+5G –2007 Nov - TG formed –2008 usage models/ comparison criteria/ CFP/ technical proposal submissions –2009 technology selection –2010 refinement –2011 Nov – start external review (sponsor ballot) –2012 Nov - official standard

doc.: IEEE /0724r1 Submission May 2007 Darwin Engwer, Nortel NetworksSlide 9 Possible Technologies I suggest that we look beyond just more antennas, wider channels, more complex modulation and more streams (although those are always good base technologies to bring to bear) to even more advanced technologies, e.g. –Carbon nanotube antenna arrays –Network coding –FEC –New bands –Superposition coding –Advanced interference cancellation –and so on …

doc.: IEEE /0724r1 Submission May 2007 Darwin Engwer, Nortel NetworksSlide 10 References wng-looking-ahead-to-future.ppt very-high-throughput-study-group.ppt draft-par-and-5criteria-gigabit-tg.doc vht-sg-approach-proposal.ppt vht-thoughts-vht.ppt vht-vht-sg-considerations.ppt