Muon Trigger Status Report Eric James Trigger Commissioning Workshop 8/17/00.

Slides:



Advertisements
Similar presentations
Michigan State University 4/15/ Simulation for Level 2 James T. Linnemann Michigan State University NIU Triggering Workshop October 17, 1997.
Advertisements

Final Commissioning Plan and Schedule Cheng-Ju Lin Fermilab Installation Readiness Review 09/27/2004 Outline: - Work to be done during shutdown - Work.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
MICE Electronics Update Mice Target Workshop – Dec 2010 P J Smith James Leaver.
DOE/NSF Review of ATLAS, 1 Mar 2000, BNL Muon MDT Front End Electronics (WBS 1.5.9) James Shank DOE/NSF Review of U.S. ATLAS Detector (with help from:
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Start Counter Construction Update Eric Pooser 08/21/2014.
Electronic Detector status and run organization Logistics and organization Updates on the electronic detector since last year run Conclusions.
Nathan Eddy Aug 17, 2000 Trigger Workshop slide - 1 Data Board l 2 production boards in testing on the 14th floor l Both boards are fully functional at.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
Cluster Finder Report Laura Sartori (INFN Pisa) For the L2Cal Team Chicago, Fermilab, Madrid, Padova, Penn, Pisa, Purdue.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
TriDAS Equipment database Equipment database is partially built (Oracle). Currently consists of 2 separate databases.  DB I – database containing.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
17-Aug-00 L.RistoriCDF Trigger Workshop1 SVT: current hardware status CRNowFinal Hit Finders64242 Mergers31616 Sequencers2312 AMboards4624 Hit Buffers21212.
Flavio Gatti,Frascati-PSI, Jan 31 th, 06 1 TC status. Flavio Gatti UNIVERSITY and INFN of Genoa, Italy.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
Radar Development Status Report S. Gogineni, C. Allen, J. Ledford, K. Marathe, V. Jara, S. Raghunathan and M. A. Hameed.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
AHCAL Mechanics status report Karsten Gadow CALICE Collaboration Meeting Argonne,
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
7 Feb 2005T. Yasuda, Fermilab D0 Status Report 2/7/2005 Taka Yasuda Fermilab.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
Bart Hommels (for Matthew Wing) EUDET ext. steering board JRA3 DAQ System DAQ System Availability updates: – DIF: Detector Interface – LDA:
1 US Cost & Schedule Summary W. R. Edwards US Project Manager CD-2/3a Review January 8, 2008 BNL.
March 2005, USCMS Trigger video meetingD. Acosta1 Revised Schedule for SP Pre-Production Continued testing of first two pre-production boards over next.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
SP04 Production Lev Uvarov RICE Muon Trigger Meeting August 27, 2004.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
Ckov status David Lange, Doug Wright LLNL May 4, 2004.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
DoE Review January 1998 Online System WBS 1.5  One-page review  Accomplishments  System description  Progress  Status  Goals Outline Stu Fuess.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting September 21, 2004.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Xenon Detector Installation schedule Satoshi MIHARA.
J. Linnemann, MSU 2/12/ L2 Status James T. Linnemann MSU PMG September 20, 2001.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
EVLA Monitor & Control Software PDR Status. May 15, 2002EVLA Monitor & Control Software PDR Bill Sahr 2 Requirements, Schedule Requirements (High Level,
D0 PMG 2/3/00 PMG Agenda Feb 3, 2000  Overview u Project Manager’s Report – Tuts u Fallback options – Weerts  Silicon Support Cylinder Modifications.
Report on database work for INB in ALICE Latchezar Betev (ALICE) Information Session INB – June 8, 2006.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
DAQ 1000 Tonko Ljubicic, Mike LeVine, Bob Scheetz, John Hammond, Danny Padrazo, Fred Bieser, Jeff Landgraf.
Nikhef Scientific Meeting 2000Onne Peters D0 Muon Spectrometer December 14-15, Amsterdam Onne Peters Nikhef Jamboree 2000.
WBS 1.04 KLM Leo Piilonen Virginia Tech. Talk Outline WBS Element Scope Performance Requirements Cost Summary Schedule Risks Summary January 2014Leo.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
NA61/SHINE run schedule/plans:
University of Wisconsin
LKr status R. Fantechi.
10/month is the present production rate 2 FTE + sporadic contributions
Kevin Burkett Harvard University June 12, 2001
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Pierluigi Paolucci & Giovanni Polese
XFT2B: Plans and Tasks XFT Workshop FNAL 19 December 2003; p.1.
Presentation transcript:

Muon Trigger Status Report Eric James Trigger Commissioning Workshop 8/17/00

TDC Status

Paddle Card Status zCMU-CMP (38) y30 in hand, 13 awaiting modification zCMX (24) y02 in hand, 28 awaiting parts and assembly zBMU-BSU-TSU-CSP[T+B] (34) y16 in hand, 13 awaiting parts and assembly zCSX-CSP[N+S]-CLC (13) y25 additional boards on order

Mezzanine Card Status zDelta-T Mezzanine Card yCMU,CMX,BMU yAll 80 boards in hand and tested. zScintillator Mezzanine Card yCSP,CSX,BSU,TSU,HAD yAll 40 boards in hand. Still to be tested. zCMP Mezzanine Card y2 production boards and some prototypes in hand. y14 more production boards due from ADCO.

Trigger Card Status zMatchbox Card yAll 15 production boards are in hand. zPre-Match Card y2 production boards in hand and under test. y4 additional boards still due from ADCO. zMuon Trigger Summary Card y2 production boards in hand. zMatchbox Transition Card y2 prototype boards in hand. y15 production boards still due from ADCO.

ADCO Delivery Schedule z14 CMP Mezzanine Cards y9/15/00 z04 Pre-Match Cards y9/29/00 z15 Matchbox Transition Cards y10/13/00 zRecent TDC deliveries indicate potential slippage on the order of a couple weeks.

September 1st zExpect Matchbox installation and trigger cabling will be complete. yCMU degree coverage both ends. yCMP/CSP - Top and bottom coverage. yCMX/CSX degree coverage one end. yIMU - 60 degree coverage one end. yTrack Match - 60 degree coverage.

November 1st zAdditional hardware added as available. yCMU degree coverage both ends. yCMP - Top,Bottom, and South wall coverage. yCMX/CSX degree coverage one end. yIMU degree coverage one end. yTrack Match - Dependent on TDC availability.

Software zRun control software is in reasonable shape for the muon trigger hardware. zA first pass has been made at placing muon trigger parameters into the trigger database. zSimulation code for CMU, CMX, and CMP has been written. A framework exists for developing the hardware monitor code.

Commissioning Run Goals zFinalize monitoring code for muon trigger hardware. zAttempt to understand the details of timing in each of the different detector elements into the muon trigger. zCommission as much of the muon detector and the associated muon trigger hardware as possible.