October 15, 2012 Oakwood Presbyterian Church Feasibility Study Design Meeting 2 Copyright Hoffman Architecture 201210/02/20121.

Slides:



Advertisements
Similar presentations
Fullerton College Bond Fund Projects Update Fullerton College Athletics Project Scope Overview Schedule Parking.
Advertisements

Oakwood Presbyterian Church Feasibility Study 10/02/2012Copyright Hoffman Architecture The Trellis and the Vine Oakwood Presbyterian Church.
Existing Maximum Capacity = 240 (approx.) Comfortable Seating = 170 (approx. 70%) Current Sunday Attendance = 160 (approx.) During Awana Night, Every.
Welcome To The New Ebenezer Baptist Church Located at 1200 & 1236 Gregg Street & 1921 Lady Street.
NEW PALTZ CENTRAL SCHOOL DISTRICT Comprehensive Facilities Master Plan – Progress Report Summary.
Congregation Survey Summary & Program Statement KATY first united methodist church August 30, 2009.
Building Expansion Project Update ECCC 4.9 Growth Strategy We will continue to grow as a “one site multi congregations & services” church.
Building Renovations and Improvements College Park Church is engaged in major Renovations and Improvement of its building. This is the first large renovation.
 Today, the church has 82 members plus a growing number of children and offers 5 Sunday school classes each week for children and adults, as well as.
NEW MERCY CENTER. Dramatic 35 foot tall Bright Silver Building entrance cross. Recognition by custom engraved plaque. This Cross will be up lit at night.
Building Plan Presentation The Evangelical Lutheran Church of The Holy Trinity.
ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.
ECCC Growth Strategy. Average Sunday Attendance ,006 1,120.
Church Renovation/ Expansion Proposals Willowdale.
FBCLS Facilities Master Plan September 14, Future Planning Team Dave Esely Sheryl Franke Bud Hertzog Blake McKinney Wendell Shaffer Sara Taylor.
The Catholic Community of St. Thomas More New Building Committee.
4900 S ROUTE 31 CRYSTAL LAKE 1. AERIAL 2 PROPERTY HISTORY 3 Constructed by Sherman Hospital in 1978 Now Owned by Advocate Group.
Oakwood Building – PS Holdings (Owner) 61 to 99 Oakwood Road Lake Zurich, IL Oakwood Lake Zurich Oakwood Lake Zurich Oakwood Building Lake Zurich,
Fullerton College Physical Education Project Community Meeting March 11, 2009.
Proposed Facility Master Plan First Baptist Church Mt Washington, Ky.
Facilities Advisory Committee Preliminary Feasibility and Cost Study April 2012.
Church Building History Built in 1974 CBS Construction Total Footage: 5,800 Major & minor Remodel in 1994 and 2004: Sanctuary Dinner Hall 3 Classroom,
Church Administrators & Emergency Planning
GROWING THE DREAM. Approximately fifteen years ago, our church leadership had a God-inspired dream to reach thousands of children, teens & families in.
Feb 27, 2007 Informational Meeting 1 St Paul United Methodist Church Faith Works! “Building for Christ’s Ministry” Informational Meeting February 27, 2007.
A LL D ULLES A REA M USLIM S OCIETY. ADAMS CORE VALUES.
1 Advisory Group Meeting October 4, Topics to Be Discussed Overall Plan Overall Plan Review of Three Site Visits Review of Three Site Visits Congregation.
Grace Bible Church Ministry Goals & Master Plan Presentation.
1. 1 3/14/11 Church Conference 14-Mar-11 Welcome and Introduction Opening Prayer Presentation of Building Project Motion to Approve Project Vote on Proceeding.
First United Methodist Church Katy, Texas Preliminary Master Plan Presentation September 29, 2009.
©2009 Strang, Inc. Orchard Ridge United Church of Christ September 20, 2009.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
Presented by: Servus Place – A Plan for the Future Report on Public Consultation and Revised Plans Diane Enger Director Servus Credit Union Place March.
Seating Room for lighting, recording etc. Area behind Stage Wings Stairs Orchestra Pit Wall for Backdrops.
March 12, 2015 Ss. John & Paul Catholic Church Feasibility Study.
Solana Beach Presbyterian Church The Generations Vision Believe. Belong. Build. California Coastal Commission November 4, 2011 Oceanside, CA we SERVE with.
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
BRANDON BAPTIST CHURCH MASTER PLAN 8/31/2015 BRANDON BAPTIST MASTER PLAN BRANDON BAPTIST CHURCH MASTER PLAN 1.
Deerfield Elementary School Deerfield Elementary Overview of Deerfield Renovation October 8, 2015.
Greater Mt. Zion Baptist Church 26 January 2014 Jackson Galloway Associates, PLLC.
GROWING THE DREAM. Welcome Purpose of Tonight “Growing the Dream”. No doubt you have seen and heard several bits of information or discussion on “Growing.
` riddle design 25 January 2009 Emmanuel Episcopal Church Formation Addition and Renovations.
Family Life Center / Youth Center 201 Music Office 216 – 217 Children’s Classroom 202 – 203 future use 218 Kid’s Klub 204 old sanctuary 219 – 220 Storage.
Facilities for a Quality Child Development Program Child Services II.
Board of Trustees Meeting February 25, Strategic Plan Alignment Strategic Priorities from the Strategic Plan 
Justice Planners and Designers 212 North 25 th Street, Milwaukee, Wisconsin / Door County Architectural and Engineering.
Sauriol Bohde Wagner architects and associates, inc Garfield Road Macomb, Michigan ph fx.
Frothingham Hall Renovation Easton, MA June 21, 2010 architecture interior design urban design cbtarchitects.com.
The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose.
Building Committee Update 5/21/17
A10.01 Project Description:
Diocese of Northampton Scott Tallon Walker Architects
Draft Indoor Recreation Facilities Master Plan
Project 105 Report to Congregation
“Gather & Grow” Agenda Welcome & Opening Prayer Monsignor Bronkiewicz
Silver Lake Regional High School
A10.01 Project Description:
Plaza Midwood Space for Lease
Mary Queen of Apostles Facilities Master Plan Update
Albemarle County Public Schools
Building Project Informational Meeting
PHASE I NEW SANCTUARY BUILDING COMPLETE WORSHIP SPACE FOR 350
Fellowship Hall.
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
WES Renovation Update Photo Gallery
Park Place Wesleyan Gala 2019
Phase II Committee Forrest Barber Johnny Davis Mike Hannon Brandon Harwood Kelly McKay Jim McCoy Becky Roberts.
EAST PENNSBORO AREA SCHOOL DISTRICT
Dixon Middle School Project Update
Presentation transcript:

October 15, 2012 Oakwood Presbyterian Church Feasibility Study Design Meeting 2 Copyright Hoffman Architecture /02/20121

Oakwood Presbyterian Church Feasibility Study 10/02/2012Copyright Hoffman Architecture

Oakwood Presbyterian Church Feasibility Study Existing Conditions Diagram Copyright Hoffman Architecture /02/2012 Existing Conditions -Insufficient classrooms -Current classrooms are in “shared” spaces -Outdated, undersized nursery -Sanctuary does not accommodate expansion -Outdated lighting in Sanctuary -Offices are located in leased space -Fellowship hall is underutilized because of space limitations -Kitchen is out of date -Lack of indoor multi-use space 3

Oakwood Presbyterian Church Feasibility Study Program Copyright Hoffman Architecture /02/2012 ExistingNew Target Sanctuary 3050 SF5000 SF Fellowship Hall **2090 SF2500 SF Lobby 650 SF Nursery 735 SF1000 SF Multi-Use Room NA4700 SF Classrooms ** SF Office Suite NA800 SF Kitchen 560 NA600 SF Facility Support NA200 SF Storage SF Restrooms SF 4

Oakwood Presbyterian Church Feasibility Study 10/02/2012Copyright Hoffman Architecture 2012 Zoning Fellowship Hall Addition 5 -Required setbacks from master plan property -75 feet -Minimal setbacks can be proposed and approved through the Board of Supervisors

Oakwood Presbyterian Church Feasibility Study 10/02/2012Copyright Hoffman Architecture 2012 Site Plan 6

Oakwood Presbyterian Church Feasibility Study Conceptual Plans Copyright Hoffman Architecture /02/2012 Phase 1 Enlarged lobby/gathering space Coat storage Coffee bar Gallery corridor New women’s restrooms Existing women’s restroom converted to a men’s restroom 7 new classrooms 1 classroom is a future lobby space for the multi- use room 12 total classrooms Office suite 7

Oakwood Presbyterian Church Feasibility Study Conceptual Plans Copyright Hoffman Architecture /02/2012 Phase 2 Multi-use space Full basketball and volleyball courts Space will accommodate peple Storage New kitchen Existing kitchen becomes 2 temporary classrooms 14 total classrooms 8

Oakwood Presbyterian Church Feasibility Study Conceptual Plans Copyright Hoffman Architecture /02/2012 Phase 3 Convert classroom to men’s restroom Convert current fellowship hall to 7 permanent classrooms Three classrooms combine to serve as larger meeting space people Dedicated library\classroom Nursery Existing nursery becomes two temporary classrooms 15 total classrooms 9

Oakwood Presbyterian Church Feasibility Study Conceptual Plans Copyright Hoffman Architecture /02/2012 Phase 4 Expansion of Sanctuary Demolish existing interior walls Expand into covered exterior side areas Increase natural “filtered” light Update audio and tech support Updates to stage area including ramp, storage, and a feature screen wall Custom built in storage and sink area in rear of Sanctuary New door into gathering space New doors and expanded front entry. 10

Oakwood Presbyterian Church Feasibility Study Conceptual Projected Costs Copyright Hoffman Architecture /02/2012 Total Project Costs Phase 1 Classroom/Office Additions$1.2 M Phase 2 Multi-Use/ Kitchen Additions $1.1 M Phase 3 Renovate existing Fellowship Hall into new Classrooms and Nursery $630 K Phase 4 Renovate/expand existing Sanctuary $700K Total Project Costs (Feasibility Phase) $ M 11

Oakwood Presbyterian Church Feasibility Study Conceptual Plans Copyright Hoffman Architecture /02/