Proton Beam for PRISM Keith Gollwitzer Accelerator Division Fermilab 5 th Workshop Project X Physics – Muons November 8, 2010.

Slides:



Advertisements
Similar presentations
ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
Advertisements

ISIS Accelerator Division
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
Masahito TOMIZAWA and Satoshi MIHARA Accelerator and proton beam.
Ion Accelerator Complex for MEIC January 28, 2010.
Muon Collider 2011 Workshop Jun 27-July 1 in Telluride, CO Gollwitzer & Nagaitsev presented Attending: Ankenbrandt, Lebedev, Pasquinelli, Popovic, and.
1 Muon Bunching for a Muon Collider David Neuffer FNAL August 3, 2010.
Task Force on Project X for Muon Collider Keith Gollwitzer Accelerator Division Fermilab.
Project X – MAP Task Force Keith Gollwitzer Accelerator Division Fermilab Project X Collaboration Meeting Oct 25, 2011.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Nufact09-IIT 107/24/2009 Project X and a Muon Facility at Fermilab Milorad Popovic FNAL.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
Storage Ring : Status, Issues and Plans C Johnstone, FNAL and G H Rees, RAL.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Simultaneous Delivery of Parallel Proton Beams with the EURISOL Driver
Fermilab, Proton Driver, Muon Beams, Recycler David Neuffer Fermilab NufACT05.
Proton Driver at Fermilab Keith Gollwitzer Accelerator Division Fermilab IDS-NF 7 th Plenary Meeting Oct 17-19,2011.
F Project X Overview Dave McGinnis October 12, 2007.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
1 Design of Proton Driver for a Neutrino Factory W. T. Weng Brookhaven National Laboratory NuFact Workshop 2006 Irvine, CA, Aug/25, 2006.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
Proton Delivery to Target Keith Gollwitzer Accelerator Division Fermilab MAP 2012 Winter Meeting March 7, 2012.
Proton Driver Keith Gollwitzer May 31, Initial Design Overview For design purposes, the following is assumed –H - beam comes from PIP II and follow-on.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
WG2 (Proton FFAG) Summary G.H. Rees. Proton Driver Working Group  Participants: M. Yashimoto, S. Ohnuma, C.R. Prior, G.H. Rees, A.G. Ruggiero  Topics:
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
Fermilab and Muons Proton Driver (for ν-Factory, μ + -μ - Collider, …) David Neuffer Fermilab.
Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.
THE DESIGN OF THE AGS-BASED PROTON DRIVER FOR NEUTRINO FACTORY W.T. WENG, BNL FFAG WORKSHOP JULY 7-11, 2003 KEK, JAPAN.
Proton Driver – Target Station Interfaces Keith Gollwitzer Fermilab Wednesday May 28, 2014 MAP 2014 Spring Meeting.
Proton Driver / Project X Keith Gollwitzer Fermilab August 30, 2012.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
FFAG’ J. Pasternak, IC London/RAL Proton acceleration using FFAGs J. Pasternak, Imperial College, London / RAL.
F D F November 8, 2006Alessandro G. Ruggiero1 of GeV 10-MWatt Proton Driver Target 200-MeV DTL 1.0-GeV FFAG H – Stripping Foil Injection Energy,
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Main Technical Issues of theSuper B Injector Main Technical Issues of the Super B Injector SuperB Meeting, Isola d’Elba, May 31st – June 3rd, 2008 D. Alesini,
F Sergei Nagaitsev (FNAL) Aug Project X ICD2 Briefing.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
Presenter : Yang Wu McMaster University Work conducted at IHEP.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
Project X as a Muon Facility Platform Keith Gollwitzer Fermilab Accelerator Advisory Committee November 7-9, 2011.
Booster/Muon Campus Stage 1+ 1 GeV Nuclear/Booster-Muon Campus Stage 1 3 GeV Linac/1GeV program Stage 2 3 GeV 3-Way split Stage 2 3 GeV-8 GeV Linac Stage.
F Sergei Nagaitsev (FNAL) Webex meeting Oct ICD-2 chopper requirements and proposal #1.
FCC-ee injector complex including Booster Yannis Papaphilippou, CERN Thanks to: M.Aiba (PSI), Ö.Etisken (Ankara Un.), K.Oide (KEK), L.Rinolfi (ESI-JUAS),
+-- Collider Front end- Balbekov version
Considerations on RF systems of SPPC collider and its injector chain
Status of the CLIC main beam injectors
Linac possibilities for a Super-B
Bunch Separation with RF Deflectors
Progress towards Pulsed Multi-MW CERN Proton Drivers
JLEIC electron injection demo
The SPL-based Proton Driver at CERN
JLEIC electron injection demo
Kicker specifications for Damping Rings
General Issues for a Multi-MW driver
JLEIC ion fullsize booster (2256m) space charge limit (Δν=0
JLEIC 200 GeV ion beam formation options
RF system for MEIC Ion Linac: SRF and Warm Options
Updated MEIC Ion Beam Formation Scheme
JLEIC Ion Beam Formation options for 200 GeV
Choice of harmonic number with the consideration of ion beam formation
Presentation transcript:

Proton Beam for PRISM Keith Gollwitzer Accelerator Division Fermilab 5 th Workshop Project X Physics – Muons November 8, 2010

Outline Review of Project X beam PRISM beam requirements Changing bunch structure Issues Nov Gollwitzer -- Proton Beam for PRISM2

Project X Beam Review 3GeV beam energy out of CW Linac 325MHz bunches (3.1ns spacing) – RF splitter doubles spacing – 50ps bunch width 1.9x10 8 particles/bunch (10mA for < 1 μ sec) Linac average beam current 1mA (>1 μ sec) – 3MW out of Linac possible H - beam out of Linac – Preference to convert beam to protons before 3 way RF splitter Nov Gollwitzer -- Proton Beam for PRISM3

PRISM Beam Requirements 1MW of proton beam power – Already asking for more beam power More beam current (towards 4MW) Increase CW Linac energy Repetition rate of ~1kHz – Believed to be limit of injection/extraction kickers of muon storage ring 2x10 12 protons every 1ms Bunch width of 10ns – A narrower width is desirable Nov Gollwitzer -- Proton Beam for PRISM4

Changing Bunch Structure (1) Need to accumulate beam – Change 162.5MHz beam out of RF splitter to 1kHz beam onto target – Requires H - beam out of RF splitter – Accumulation Ring will have stripping system and dump To accept unconverted beam (H - and H o ) – Requires programmable Linac front end to populate appropriate Linac bunches such that the appropriate Accumulation Ring RF bunch(s) are filled Leave kicker gap using barrier RF system Set initial bunch length before RF manipulations Nov Gollwitzer -- Proton Beam for PRISM5

Change Bunch Structure (2) Final bunch length requires RF manipulation – After accumulation, beam transferred to second ring: Buncher – Buncher will perform final RF bunch rotation to achieve short bunch length Nov Gollwitzer -- Proton Beam for PRISM6 Accumulation Ring Buncher Ring RF Splitter Linac H- beam Proton Bunch to Target

Issues (1) Injection/Extraction Kickers – 1kHz kickers are the same technological issue as for PRISM Muon Storage Ring Repetition rate Rise time or fall time Beam Dynamics – Space Charge? – Beam size in dipoles at final bunch length RF – How much required to perform manipulations at required rate? Nov Gollwitzer -- Proton Beam for PRISM7

Issues (2) H - beam out of RF splitter – Requires lower field in downstream Lambertson to avoid Lorentz stripping of H - beam Affects layout of switchyard area Each area will need own stripping system Stripping system and beam dump – Quantum mechanics of stripping systems >95% easy but leaves tens of kW beam power Nov Gollwitzer -- Proton Beam for PRISM8

Summary Project X can provide the amount of proton beam necessary for PRISM Work will be needed to convert bunch structure Nov Gollwitzer -- Proton Beam for PRISM9