Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.

Slides:



Advertisements
Similar presentations
1 Optimizing the Efficiency of the NCAR-Wyoming Supercomputing Center Ademola Olarinde Team Member: Theophile Nsengimana Mentor: Aaron Andersen August.
Advertisements

Computer Room Provision in Atlas and R89 Graham Robinson.
State Data Center Re-scoped Projects With emphasis on reducing load on cooling systems in OB2 April 4, 2012.
Jamesway Incubator Company Inc. HRS System By Dominic Babineau, Engineer.
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
The CDCE BNL HEPIX – LBL October 28, 2009 Tony Chan - BNL.
Cooling Product Positioning
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
Copyright Green Revolution Cooling
MPE Workshop 14/12/2010 Building 107- project Raphaël Berberat
Computer Room Experiences A medium sized tier-2 site view Pete Gronbech GridPP Project Manager HEPIX April 2012.
A New Building Data Center Upgrade capacity and technology step 2011 – May the 4 th– Hepix spring meeting Darmstadt (de) Pascal Trouvé (Facility Manager.
MODULAR DATA CENTER PUE
CERN IT Department CH-1211 Genève 23 Switzerland t Options for Expanding CERN’s Computing Capacity Without A New Building Medium term plans.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Business Continuity Overview Wayne Salter HEPiX April 2012.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
October 23rd, 2009 Visit of CMS Computing Management at CC-IN2P3.
IT Department 29 October 2012 LHC Resources Review Board2 LHC Resources Review Boards Frédéric Hemmer IT Department Head.
Overview of Liquid Cooling Systems Peter Rumsey, Rumsey Engineers.
Air Conditioning and Computer Centre Power Efficiency The Reality Christophe Martel Tony Cass.
CERN IT Department CH-1211 Genève 23 Switzerland t The new (remote) Tier 0 What is it, and how will it be used? The new (remote) Tier 0 What.
MISSION CRITICAL COLOCATION 360 Technology Center Solutions.
Physical Infrastructure Issues In A Large Centre July 8 th 2003 CERN.ch.
Thermal Storage Coupled to a Ground Source Heat Pump in a Public Services Building COIMBRA Andre Quintino Duarte Oradea, 06 June 2012.
F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Facilities Evolution Wayne Salter / Vincent Doré.
Infrastructure Improvements 2010 – November 4 th – Hepix – Ithaca (NY)
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Computer Centre Upgrade Status & Plans Post-C5, June 27 th 2003 CERN.ch.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Upgrade Project Wayne Salter HEPiX November.
Nikhef/(SARA) tier-1 data center infrastructure
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
L OW E NERGY B UILDING D ESIGN A LEX N IX H AZEL E ASTON E UAN R OBERTSON A LASDAIR H OON D APHNE K OULITSA.
Data Center Facility & Services Overview. Data Center Facility.
High Performance Computing (HPC) Data Center Proposal Imran Latif, Facility Project Manager Scientific & Enterprise Computing Data Centers at BNL 10/14/2015.
Energy Savings in CERN’s Main Data Centre
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Facilities Evolution Wayne Salter HEPiX May 2011.
Future O 2 LHC P2 U. FUCHS, P. VANDE VYVRE.
Computer Centre Upgrade Status & Plans Post-C5, October 11 th 2002 CERN.ch.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
Vault Reconfiguration IT DMM January 23 rd 2002 Tony Cass —
CERN - IT Department CH-1211 Genève 23 Switzerland t Power and Cooling Challenges at CERN IHEPCCC Meeting April 24 th 2007 Tony Cass.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Row Cooling.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
ESKOM - MWP NEW ENERGY CENTRE Mechanical Installation 16 April 2014.
Technical Review EHN1 Extension Cooling Systems and Pipework Jérôme Rodary / EN-CV.
West Cambridge Data Centre Ian Tasker Information Services.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
Dell EMC Modular Data Centers
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
Update on the PSB Cooling and Ventilation Systems
Energy Efficient Building Components
CBETA Technical Review
MODULAR DATA CENTER PUE
CERN Data Centre ‘Building 513 on the Meyrin Site’
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Background B513 built in early 1970’s for mainframe era.
Thermal Energy Storage
COOLING & VENTILATION INFRASTRUCTURE
PowerValue 11 RT Sales Presentation
PowerValue 11/31 T Sales Presentation
Direct Current (DC) Data Center

Program Proposal to ITGC
Presentation transcript:

Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical Forum - 10 th June 2011

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Overview Current configuration of the CC (excluding B613) Current issues Consolidation project – Goals – Technical choices – Plans and views – New IT room – Main dates On-going work outside the project Questions Computer Center Consolidation – VD

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Current configuration - 1 Designed and built in early 1970s Fully refurbished around types of equipment both on UPS: – Physics (single power feed, no diesel backup) – Critical (dual power feed and diesel backup) Power capacity: – Nominal current capacity: 2.5MW (including 240kW of critical power) – Extended (usable) capacity: 2.9MW (including 340kW of critical power) forfeiting redundancy for all UPS systems 2 main IT rooms (R m² & Vault m²). Several dedicated labs (telecom) Computer Center Consolidation – VD

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Current configuration physics UPS, each with 4*400kvA modules 1 critical UPS with 2*300kVA modules Air cooling installations: for IT equipment including telecoms (capacity up to ~2.5MW), technical areas... and offices – (3+1) Chillers not secured by UPS nor diesel (water at ~5C) – Pumps and ventilation units secured by diesel – Water-tank for stored cooling capacity Water cooling installations: for IT physics equipment (capacity up to 800kW) – (1+1) Chillers not secured by UPS nor diesel (water at ~14C) – Pumps secured by (physics) UPS – 80 water-cooled racks secured by physics UPS – Water-tank for stored cooling capacity Computer Center Consolidation – VD

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Current issues - 1 Cooling: – Insufficient cooling for critical UPS room – Impossible to improve the cooling in critical UPS room – CC not cooled when running on UPS without diesel – Insufficient cooling when running on diesel IT critical equipment running Pumps & Ventilation Units running No chiller and insufficient stored cold water – Offices in B31 cooled by the CC Computer Center Consolidation – VD

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Current issues - 2 Power – Insufficient critical power available – No redundancy for critical UPS (> 240 kW) – No redundancy for physics UPS (> 2.7 MW) Other – Limited fire protection in B513 – Critical areas and physics areas strongly coupled Share the same locations, cooling infrastructure and fire risks) Improving critical infrastructure implies improving physics one... at an expensive price Computer Center Consolidation – VD

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Consolidation Project Main goals – Secure the cooling and fire-protection of Critical IT equipment... Which should be able to run as long as power is available (for ever on diesel) – Increase the available critical power for IT equipment – Restore N+1 redundancy for both critical and physics UPS – Decouple the cooling of B31 from the CC Main points on the wish list – Increase the physics power (if cost-effective) – Secure the cooling of physics equipment  Computer Center Consolidation – VD

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Technical choices - 1 Upgrade of the electrical infrastructure – Total capacity 3.5 MW of IT equipment including 600kW of critical equipment – N+1 redundancy for critical and physics UPS Separation of the critical and physics infrastructure – 3 critical areas : new IT room (450kW) extended telecom labs (50kW) legacy network area in R-050 (100kW)  – New dedicated cooling installation for the critical areas (dual power feed, diesel) Computer Center Consolidation – VD

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Technical choices - 2 Construction of a new partially sunken building dedicated to the cooling of the critical areas – (2+1) new chillers – 1 new storage tank – Pumps – New ventilation system for the critical UPS room Conversion of the Barn area to house – 2 Electrical rooms (batteries, UPS and switchboards) – An IT room with water cooled racks for IT critical equipment (up to 480kW) – New ventilation system for the legacy critical network area in R-050 and for new electrical rooms Computer Center Consolidation – VD

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Technical choices - 3 Modification of the telecom area – Extension into adjacent labs – Fire protected walls – New ventilation systems Modification of the technical rooms (basement) – Move of the critical UPS (from S-435 to S-437) – New cooling control (in S-400, S-401 and S-402) Addition of 2 new electrical transformers (adjacent to the existing ones) Addition of 1 new water tank for physics equipment (adjacent to the existing one) Computer Center Consolidation – VD

CERN IT Department CH-1211 Geneva 23 Switzerland t CF 3D view from the car park Computer Center Consolidation – VD

CERN IT Department CH-1211 Geneva 23 Switzerland t CF 3D view of the ground floor Computer Center Consolidation – VD

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Ventilation in the Barn Computer Center Consolidation – VD

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Telecom critical area Computer Center Consolidation – VD

CERN IT Department CH-1211 Geneva 23 Switzerland t CF 3D view of the basement Computer Center Consolidation – VD

CERN IT Department CH-1211 Geneva 23 Switzerland t CF The new IT room Critical IT equipment only (450kW, room designed for 480kW) Cooling of IT equipment still being discussed, most likely water-cooled racks with passive heat exchangers – No power consumption – Cheap (compared to other cooling solutions) – No fan problems – No cold/hot corridors, cold room – Cooling issues for heterogeneous equipment??? Very likely 90 racks (70cm*110cm*47u), average power density 5kW/rack Computer Center Consolidation – VD

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Views of a passive rack Computer Center Consolidation – VD

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Plan of the new IT room (draft) Computer Center Consolidation – VD

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Important dates Autumn 2009 : serious discussions with EN May 2010 : approval of the project October 2010 : barn ready for dismantling January 2011 : preliminary electrical works May 2011 : start of the main civil engineering works Summer 2011 : MS and IT for the water-cooled racks November 2011 : end of the main civil engineering works November 2011 : start of the main cooling works November 2011 : start of the main electrical works May 2012 : start of the works for the additional water tank July 2012 : end of the main cooling works July 2012 : end of the works for the additional water tank August 2012 : end of the main electrical works October 2012 : end of the works Computer Center Consolidation – VD

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Work outside the project - 1 Problematic cooling of the Physics equipment – When running on UPS without diesel power : IT physics servers up... without cooling – No easy solution. We need power (500kW) for the pumps and ventilation in R-050 and the Vault (>500kW) – No agreement reached when the consolidation project was approved – However... on-going discussions/investigations and a good chance to power the ventilation units from the UPS Computer Center Consolidation – VD

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Work outside the project - 2 Improvement of the cooling efficiency – To be able to cool more IT equipment and to save on cooling power – Main steps already achieved Cold corridors (from 2008) Temperature increase of blown air in R-050 from 14C to 16C (September 2010) (More) use of outside fresh air (February 2011, net immediate gain 200kW) Blown air in R-050 from 16C to 18C (2 May 2011) Blown air in R-050 from 18C to 19C (11 May 2011) Computer Center Consolidation – VD

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Work outside the project - 3 Improvement of the cooling efficiency – Future steps Continue to increase the temperature of the air blown in R- 050 (up to 22? While ensuring air < or = 27C for all IT equipment) Increase the temperature of the Vault and possibly of some UPS rooms. Discussion starting with EN/CV Better understand and improve the air flow from the main ventilation units to the servers in R-050 Continue to improve cold air confinement where relevant Increase the temperature of the chilled water? Computer Center Consolidation – VD

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Work outside the project - 4 Improvement of the monitoring of the infrastructure of the Computer Centre – Important work already done to better understand the power flows in the CC and store/display them in Lemon... Still some work to do, in particular on the alarms – Work to be done to include temperatures and related alarms in Lemon – Progressive implementation of intelligent power bars in IT racks (end-2011 installations & new IT room) Computer Center Consolidation – VD

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Video on the outside work To upload Computer Center Consolidation – VD

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Questions? See also Computer Center Consolidation – VD