Raw and Finished Water System Improvements April 22, 2014.

Slides:



Advertisements
Similar presentations
SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
Advertisements

Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
Calaveras County Water District Capital R&R Program Funding Options March 25,
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
6 th Street Water Main And Street Reconstruction 2013.
CITY OF NORTH PORT US41 CORRIDOR UTILITIES MASTER PLAN US 41 Utility Corridor Study Presentation April 27, 2010.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Presentation to Maxwell Place Homeowners Association 1.
Spectra Energy Partners Texas Eastern Transmission, LP Ohio Pipeline Energy Network Project (OPEN) Clean Water Act Section 401 Water Quality Certification.
Florida Gas Transmission Mainline Hydrostatic Test From the intersection of Milam Dairy Road with NW 65 th Street to the intersection of Galloway Road.
Proposed Improvements to the Water System Infrastructure in the Anacostia Area of Washington, D.C. November 20, 2002 Prepared by Prepared for Our Customers,
Florida Gas Transmission Section #2 Hydrostatic Test 14-Inch Saint Petersburg Lateral Pipeline From Tampa By-Pass Canal to East of Lake Magdalene Hillsborough.
RIO GRANDE ELECTRIC COOPERATIVE, Inc. Eagle Ford Consortium Conference April 22, 2014.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Monroe County Transportation Projects 4 Local Agencies: Unincorporated Monroe County City of Key West City of Marathon Village of Islamorada District Six.
Water System Planning Study
West Northern Lights Boulevard – Sound Barrier Improvements August 16, 2006 Meeting Purpose: A Forum to Share and Gather Information The Municipality of.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Jeff Ray, EIT Project Engineer, Treatment & Recycle Engineering Broadband Access Points & Programmable Logic Controllers Replacement – Phase 1 Project.
Florida Gas Transmission Section #1 Hydrostatic Test 14-Inch Saint Petersburg Lateral Pipeline From Compressor Station 30 (Plant City West) to Main Line.
U.S. 224 Road Reconstruction Project from the St. Mary’s River Bridge to just east of Jackson Street in Decatur, Adams County 6:30pm Presentation Erekson.
1 Monthly Operations Report September 15, 2015 Presented to Boynton Beach City Commission Presented by Boynton Beach Utilities
Florida Gas Transmission Mainline Hydrostatic Test From the Golden Glades Interchange to the interchange of NW 122 nd Street with the Palmetto Expressway.
Project Highlights of Consultant Managed Utility Coordination Efforts Estill County – KY 89 – Irvine 3-lane Kevin F. Damron, PE, Senior Project Manager.
METRO WASTEWATER RECLAMATION DISTRICT CAPITAL IMPROVEMENTS PROGRAM
September 25, Who is Brushy Creek Regional Utility Authority? Local government corporation formed by Cedar Park, Leander and Round Rock to access,
Winchester Municipal Utilities 2009 Rate Plan April 9, 2009.
Lift Station No. 1 and 2 Force Main Replacement Ronald Wastewater District Summer 2015.
1 1 City Commission Workshop for the DRAFT Basis of Design Report December 14, 2015 CRAVEN THOMPSON & ASSOCIATES, INC.
Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges.
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
BUILDING STRONG ® PLANNING SMART ® US Army Corps of Engineers BUILDING STRONG ® Partnering Opportunities for Water Supply and Distribution Planning Beverley.
MIDDLE PLANTATION KEY WASTEWATER COLLECTION AND TRANSMISSION SYSTEM Village of Islands, Islamorada Residential Grinder Pump Program Pre-Construction Meeting.
Marcellus Shale Development and Pennsylvania: Community Sustainability Widener University School of Law Harrisburg, Pennsylvania September 27, 2013 Agricultural.
Alternative Rate Structure Paul Smith Vice President, Rates Duke Energy Ohio June 20, 2006.
EASTERN MUNICIPAL WATER DISTRICT County Water Company Consolidation Project Greg Kowalski, P.E. Senior Civil Engineer April 1, EXHIBIT.
1 New Territory Municipal Utility Districts Strategic Partnership Agreement Discussions With the City of Sugar Land.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Cactus II Feeder Transmission Pipeline Joe Mouawad, PE Sr. Director of Engineering September 2, 2015.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
Whiteland & Graham Roundabout Project Update Trent Newport, PE,LS.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Loan Programs.  What is the PFA?  How does PFA financing work?  What is the Capital Financing Program?  What is the State Revolving Fund Program?
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Village of east aurora full depth road reconstruction & infrastructure improvements West Fillmore Avenue.
Performance (function)-based Decision Making
Village of east aurora sycamore street water improvements
Week 3, March 13, 2017.
Kings Bluff Raw Water System Parallel Raw Water Main Project
June 5, 2017.
North Texas Municipal Water District “Regional Service Through Unity … Meeting Our Region’s Needs Today and Tomorrow” Water Supplies Vital for the Future.
Molly Kline, Project Manager
San Mateo Bridge Replacement Project Caltrain Replaces Four 100-Year-Old Rail Bridges May 2, 2013.
Highway 110 Project Update
107th & 110th Avenue North Public Utilities Renewal Projects
Fred George Basin Greenway
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Shipwreck Fishing Charts and Maps
Modifications at Existing WTP: $450,000 Construct New WTP: $39,100,000
Comite River Diversion Project Status Update November 7, 2018 Bobby Duplantier, USACE Patrick Landry, DOTD.
Parkland/Brookdale Interceptor Replacement
Galt Court Water Main Replacement
General Tab Project, Cost Schedule, and Work Limits Roadway Character
S.R. 26 Road Rehabilitation in Clinton County
Harbour Island Force Main Replacement
2020 DWRF Project Plan Kalamazoo, Cooper and Parchment
Director of Water Engineering
Presentation transcript:

Raw and Finished Water System Improvements April 22, 2014

Project Purpose…. Replace aged infrastructure Replace aged infrastructure Provide for current water demand Provide for current water demand Provide for future water demand Provide for future water demand Improve system reliability Improve system reliability

Project Area…. - Ford Road- McClure Road - New Boonesboro Road- Colby Road - Old Boonesboro Road - April Way - Water Works Road- Bypass Road

Area Impact…. 11,761 WMU 2,365 East Clark County Water District 215 Kentucky American Water Company 14,341 Total Customers

Scope of Work…. 12,000’ of 24” Ductile Iron Raw Water Line 36,000’ of 24” Ductile Iron Finished Water Line KY Raw Water Intake and Pump Station Improvements In total 9 miles of large diameter raw and finished water transmission lines

Project Cost…. *Does Not Include WMU Staff Time Raw Water Intake Improvements Raw Water Intake Improvements Raw Water Transmission Main Raw Water Transmission Main Finished Water Transmission Main Finished Water Transmission Main Engineering Engineering Total Project Cost* $1,040,000.00$2,220,000.00$6,660,000.00$875,000.00$10,795,000.00

Project Disruptions…. Road Closures / Detours Road Closures / Detours Noise Noise Dust Dust

Easements…. Temporary and Permanent Easements Required New easement – Not in flood plain – $4.00/ft. New easement – In the flood plain – $3.00/ft. Existing easement (Increase width) – $2.00/ft. Temporary (all) – $1.00/ft. *Any variance from this payment schedule will require authorization from the WMU Commission.

Project Schedule…. Design Phase Design Phase Advertising/Bidding Phase Advertising/Bidding Phase Bid Opening Bid Opening Begin Construction Begin Construction Substantial Completion Date Substantial Completion Date Construction Time Construction Time6/14/14 6/14/14 thru 7/8/14 8/1/14 8/1/142/1/ Months

Key Contacts…. General Manager: Director of Engineering/Operations: Utility Engineer: Michael Flynn Kenneth “Duke” Dryden Eddie Hightower Winchester Municipal Utilities 150 North Main Street PO Box 4177 Winchester, KY Phone: (859) 744 – 5434 Fax: (859) 745 – 4146