"Equipment Selection and Data Delivery Protocols for Permanent Flow Monitoring: A Case Study" Presented By: Keith Laguaite and Greg Anderson (McKim & Creed)

Slides:



Advertisements
Similar presentations
Integrating Opengear console servers into Zenoss monitoring.
Advertisements

Integrating Opengear console servers into SolarWinds Orion NPM
T-BOX APPLICATIONS Cost-effective Solutions to Pain Point Problems.
Remote Automation and Monitoring: PLC or RTU. Key Points PLCs and RTUs are similar devices with somewhat differing functionality.
SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department.
Area -10,1km2, Inhabitants – (2013) –  Shareholder – Saldus municipality  Operation area – Saldus town  Activities of Saldus Komunalserviss.
CMOM CMOM Capacity, Management, Operation & Maintenance and Remote Wireless Monitoring of Collection Systems 5 th Annual FVOA Mini Conference August 18,
Wastewater Collection (Sewer Alternatives). Sewer Basics Collection and transport of wastewater from each home/building to the point where treatment occurs.
You Can Measure the Benefits… Solid Applied Technologies Sewer Level Monitoring.
Team 7 / May 24, 2006 Web Based Automation & Security Client Capstone Design Advisor Prof. David Bourner Team Members Lloyd Emokpae (team Lead) Vikash.
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
Representative Sampling By Chuck Abbott. Automatic Samplers.
The City of North Bend Sanitary Sewer System
SPECIAL ORDER BY CONSENT EMC SOC WQ S SOC Attachment 1: Summary of Major Line Replacement Completed DescriptionTotal Linear Footage Meadow Greens.
INDUSTRIAL & SYSTEMS ENGINEERING
 A system consisting of a number of remote terminal units (or RTUs) collecting field data connected back to a master station via a communications system.
1 EBMUD Flow Monitoring Technologies Evaluation Study Presentation BACWA Collection Systems Committee Meeting February 25, 2009 Kevin Krajewski, P.E. V&A.
Secure Systems Research Group - FAU 1 SCADA Software Architecture Meha Garg Dept. of Computer Science and Engineering Florida Atlantic University Boca.
Basic Hydraulics Irrigation.
Intermediate SFFMA Objectives: – Hrs received.
Hydrology and Water Resources RG744 Institute of Space Technology December 11, 2013.
Sanitary Engineering Lecture 16
January 28, 2014 Miami New generation integrated narrow-band M2M telecom platform.
Lease Automatic Custody Transfer
SCADA and Telemetry Presented By:.
CLIENT A client is an application or system that accesses a service made available by a server. applicationserver.
Emergency Action Plans Miriam Gradie Anderson Planning Specialist 608/ Wisconsin Department of Natural Resources.
Book 2: Chapter 1 Introduction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand commodities.
Technical Review Needed Fire Flow Analysis Developer Services Summit November 16, 2010 Engineering - Asset Planning Joe Dugandzic, PE.
SCADA FOR WATER DISTRIBUTION IC DEPT. GECGn SEC28.
Special Order by Consent Wastewater Collection Improvement Projects Mark Fisher and Dennis Asbury Final Report to City of Eden October 20, 2009.
Berliner Elektronenspeicherringgesellschaft für Synchrotronstrahlung mbH (BESSY) Accelerator and Experiment Control and Monitor Systems Ralph Lange BESSY,
Cullen College of Engineering RFID-Based Solutions for Piping Technology Piping Tech & UH July, 2007.
Jump Starting ITS Deployment in Los Angeles County using Wireless Communications Lessons Learned.
Unit 5 CONTROL CENTERS AND POWER SYSTEM SECURITY.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
Topics of presentation
Draft TIP for E-rate. What is E-rate? The E-rate provides discounts to assist schools and libraries in the United States to obtain affordable telecommunications.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
MyCity System Overview MyCity Remote Monitoring Systems.
9 Systems Analysis and Design in a Changing World, Fourth Edition.
Advisor: Dr. Edwin Jones 1 Client: Paul Jewell ISU Engineering Distance Learning Facility May01-13 Design Team: David DouglasCprE Matt EngelbartEE Hank.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
Submission doc.: IEEE /1365r0 Use Cases of LRLP Operation for IoT November 2015 Chittabrata Ghosh, IntelSlide 1 Date: Authors:
A. Hangan, L. Vacariu, O. Cret, H. Hedesiu Technical University of Cluj-Napoca A Prototype for the Remote Monitoring of Water Parameters.
New Product Developments World Leaders in Combustion Management Solutions New Products New Products.
© 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved.
The European Gateway to TANKSAT The Ultimate Service for LPG Tank Telemetry MCS Europe Group Solutions.
March 3, 2016 Discovery Sewer/RWQCB LSM Vallecitos Water District Regional Water Quality Control Board (RWQCB) Lake San Marcos February 10, 2010.
Hydrology and Water Resources RG744 Institute of Space Technology November 13, 2015.
CTC 450 Review 1  WW Characteristics. Objectives 2  Understand the basics of storm drainage systems  Understand the basics of sewer systems.
16 – Measurement of Flows in Piping Systems 1 March 14, 2013 Professor Doran CEE 410.
IFSTA Chapter 16 Fire Streams
City Council March 4, Introduction The UCRA recommends the development of a storm water storage basin just to the east of FM 1223, south of Avenue.
SCADA Supervisory Control And Data Acquisition Pantech Solutions Here is the key to learn more.
City of Farmersville Wastewater Project January 26, 2016 Kimley-Horn and Associates, Inc.
Artificial Intelligence In Power System Author Doshi Pratik H.Darakh Bharat P.
Lecture (11): Water Distribution Systems
Case Study: Real Life Unified Architecture Value
Technology to meet India’s water monitoring needs
2.1 & 2.2: Rainfall Detection and Alarm System
What is ASEMR /ASKUE/ and the Need for Its Implementation
Manchester’s CSO Program: A Look Behind and a Look Ahead
How SCADA Systems Work?.
Presented by Harry C. Elinsky, Jr. Filtech, Inc.
Module – Groundwater Level Measurement
In order to design a sprinkler or drip irrigation system for the lawn, we must first know how much flow is available in gallons per minute from the water.
Pinole-Hercules Water Pollution Control Plant Upgrade Project
Water & Irrigation Control systems
SMART Program Specific Metering Wiring Diagrams May 2019
Presentation transcript:

"Equipment Selection and Data Delivery Protocols for Permanent Flow Monitoring: A Case Study" Presented By: Keith Laguaite and Greg Anderson (McKim & Creed)

ABSTRACT As part of an environmental consent order, a South East city was required to enhance its wastewater transmission monitoring and reporting capabilities. With no current system in place the need to evaluate and select appropriate monitoring equipment, data delivery protocols and reporting platforms was necessary. McKim & Creed evaluated various types of open channel and side pressure flow metering equipment, power requirements for the equipment and the necessary communication devices for 7 major pump stations, 7 primary outfalls, 4 regional rain gauges and several temporary overflow sensing apparatus’. Based on the evaluation, a report was prepared that served as a guide for subsequent development of construction documents and cost estimates in implementing needed improvements. This presentation discusses the evaluation process utilized for equipment selection and the data delivery protocols that were developed to allow for common acquisition processes using both an internal SCADA system and a telemetry-based platform that can be monitored remotely by outside city agencies.

PROJECT SUMMARY Scope - Develop a Permanent Wastewater Flow Monitoring and Rainfall Gauging Solution Tasks: 1. Determine Necessary Flow Monitoring Locations 2. Complete Testing of Applicable Monitoring Equipment 3. Recommend an RTU Based Monitoring Platform 4. Evaluate and Recommend Adequate Power System 5. Prepare Procurement Construction/Installation Cost Opinions 6. Submit Formal Technical Memorandum

DETERMINE NECESSARY MONITORING LOCATIONS (Gravity Sewers & Lift Stations) Major Basins: Major Lift Stations: WPCP: 1. Rock Creek1. Chaffee James B. Messerly 2. Raes Creek2. 2nd Street Spirit Creek 3. Mid City 3. Butler Creek 4. Glass Factory4. Apple Valley 5. Rocky Creek5. Spirit Creek 6. Butler Creek6. Goshen 7. Spirit Creek7. Arcadian

DETERMINE NECESSARY MONITORING LOCATIONS (Gravity Sewers & Lift Stations)

TESTING OF MONITORING EQUIPMENT Evaluation of Open Channel Flow Monitoring Equipment 1. FloWav Submerged Pressure/Wave Doppler Sensor

TESTING OF MONITORING EQUIPMENT Evaluation of Open Channel Flow Monitoring Equipment 1. ISCO – LaserFlow Model 2160

TESTING OF MONITORING EQUIPMENT Evaluation of Open Channel Flow Monitoring Equipment 1. Eastech – Accuron 7500

TESTING OF MONITORING EQUIPMENT Evaluation of Open Channel Flow Monitoring Equipment 1. All open channel flow meters were tested at the same location (Mid-City Site) Inch Ductile Iron Pipe 3. 6 – Foot Diameter Manhole 4. Flow Depth Ranged from 20 - Inches to 48 – Inches 5. 2 – Inches of Debris 6. Average Velocity 1.9 FPS

TESTING OF MONITORING EQUIPMENT Evaluation of Open Channel Flow Monitoring Equipment 1. All Equipment Performed within Manufacturer’s Specifications 2. FloWav Sensor and Accuron Sensors Required Debris Removal 3. Laser Flow Required No Maintenance 4. All Equipment Communicates with Multiple Monitoring Platforms

TESTING OF MONITORING EQUIPMENT Evaluation of Open Channel Flow Monitoring Equipment 1. The Laser Flow was the Most Expensive of the Equipment Evaluated - $14,000 Each w/out RTU 2. The FloWav was the Least Expensive - $2,500 w/out RTU 3. The Eastech Accurron Required the Most Maintenance 4. The FloWav was the Simplest to Install The LaserFlow was Recommended for 6 Sites and the FloWav was recommended for 1 of the Sites as the System Hydraulics an Pipe Size (18”) was not Conducive to Gaining Quality Data with the Laserflow

TESTING OF THE MONITORING EQUIPMENT Evaluation of Pressure Piping Monitoring Equipment 1. The Client Desired to Utilize Permanent Mag Meters for all Pressure Pipe Monitoring, However, They were also Interested in Testing a Clamp-on Style Transit Time Meter 2. The Fuji Transit Time ‘C’ Meter was Tested as Part of the Evaluation

TESTING OF THE MONITORING EQUIPMENT Evaluation of Pressure Piping Monitoring Equipment 1. The measuring principle is based on sending ultrasonic pulses propagated diagonally between an upstream and downstream sensor and then calculating the velocity based on the time differential that the signal takes in the process 2. The instantaneous readings are taken every tenth of a second and the sensors are capable of a measurement range of between -1 and 100 feet per second. 3. Prior to installation of the sensors, the discharge force main is inspected to determine pipe diameter, material, wall thickness and existence of any lining/coating materials.

TESTING OF THE MONITORING EQUIPMENT Evaluation of Pressure Piping Monitoring Equipment 1. The Fuji Meter Performed Well and Within the Specified Tolerances all Installations Would Require Construction of a Separate Valve Vault to Maintain the Necessary Straight Line/Uninterrupted Distance 2. The Client Decided to Utilize a Clamp-on Style Meter, However, Selected the Flexium TS-Fluxus Meter Versus the Fuji Transit Time ‘C’ Due to Availability of the equipment

MONITORING PLATFORM EVALUATION Existing Monitoring Systems 1. The Client Currently Owns and Operates Telog Based Rainfall Gauging and Overflow Monitoring Devices 2. The Rainfall Gauges Utilize Telog RG-32 RTU 3. The Overflow Sensors Utilize Telog RU-32 RTU 4. Telog Hosts the Data Remotely on a Server at Their Manufacturing Facility in New York 5. The Client is Able to Access the Data Remotely via Telog’s Enterprise Software Web Browser Application

MONITORING PLATFORM EVALUATION Proposed Monitoring System Additions 1. The Proposed Flow Monitoring (Open Channel/Pressure) Meters will Utilize Telog RTUs 2. Each Clamp-On Meter will Utilize a RU-32 RTU 3. Each Open Channel Flow Meter will Utilize a Telog RS- 33u RTU 4. All Data will be Stored Remotely by Telog 5. The Client will Continue to Access the Data Remotely via Telog’s Enterprise Software Web Browser Application

MONITORING PLATFORM EVALUATION RU-32 RTU Clamp-On Meter Operation Description 1. Pressure Pipe Flow Monitoring will be Accomplished using the Telog RU The Ru-32 is similar in operation as the RG-32 as it uses a low power machine to machine (m2m) cellular modem 3. The modem, data recorder, battery and antennae are integrated into a single enclosure

MONITORING PLATFORM EVALUATION RU-32 RTU Overflow Sensor Operation Description 1. The ultrasonic level sensor records wastewater levels within the manhole where the equipment is deployed and the float switch triggers an emergency call that indicates that the wastewater in the manhole is in jeopardy of overflowing 2. Level data can be recorded in fifteen, five, or one minute intervals 3. The recorder can successfully store 80,000 data points before the information is over written and battery life is approximately 5 years

MONITORING PLATFORM EVALUATION RG-32 RTU Rainfall Gauge Operation Description 1. The gauge has an internal leveling device to ensure that the collected rainfall is evenly distributed to each bucket 2. Each bucket holds one hundredth of an inch of rainfall as the bucket becomes full it tips due to gravity and discharges the collected rainwater to a drain in the bottom of the canister 3. Each tip sends a pulse to the RG-32 which records the tip as one hundredth of an inch

MONITORING PLATFORM EVALUATION RS-33u RTU Rainfall Gauge Operation Description 1. The RS-33u was selected as it has the capability to record and transfer level, velocity and flow data via cellular service, or 4-20 mA to any SCADA PLC. 2. The RS-33u can also support additional sensors, including ultra-sonic level and various water quality sondes

POWER REQUIREMENTS EVALUATION 1. Each Pressure Pipe Monitoring Device will be Powered by 110 AC from Adjacent Lift Station 2. Each RG-32 and RU-32 will be Powered by ‘D’ Cell Batteries 3. Each RS-33u will be Powered by Solar Irradiance (It was estimated that each meter/RTU will require less than 1 12 volts DC each day)

PROJECT SUMMARY The Proposed Permanent Wastewater Flow Monitoring System is Intended to Provide the Following: 1. A Method for Monitoring Wastewater Flow at Each of the Client’s Primary Outfalls/Discharges 2. Provision of a Monitoring System that is Both Reliable and Easy to Operate/Maintain 3. Establishment of a Metering/Monitoring Platform that Includes a Future SCADA Interface as well as the Ability to Monitor/Measure/Evaluate Other Water/Wastewater Stream Attributes.

Contact Information: Greg Anderson, PE