Lift Station No. 1 and 2 Force Main Replacement Ronald Wastewater District Summer 2015.

Slides:



Advertisements
Similar presentations
Superior Turbine Solutions, Inc. Steam Path Capabilities Rotor Repair
Advertisements

Kitchen Creek CREP & Stream Bank Stabilization Project Project Sponsors: Greenbrier Valley Conservation District West Virginia Conservation Agency U.S.D.A.
Laying a new pipeline A pictorial story. Where it begins: a proving slot The proving slots are small trenches dug at regular intervals so that it can.
DENVER ZOO Lion’s Quarters Recycle Cross-connection
PURBECK RAILWAY CIRCLE
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
1 Water System Improvements Upcoming Construction for Drinking Water Capital Projects by Jodye Russell.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
1. 2 Family/Community Involvement Health Education Health Promotion for Staff Healthy School Environment Health Services Physical Education Counseling,
Trinity Glen Rose Groundwater Conservation District Monty McGuffin, Santos Tovar and Jim O’Connor Resource Compliance and Protection Department March 10,
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
Foundation Systems.
Ms. Gripshover Landscaping Unit 16. » Identify the different methods of harvesting plant materials used by the nursery » trade. » Prepare for planting.
o Existing pipe designed for gravity outfall flow – peak storm flows raise pressures above design pressure o Single gasket joint every 12’ subject to.
Inspecting Construction of Bioretention Facilities Carlton Thompson and Jeff Cowling.
1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview.
TRENCHLESS TECHNOLOGIES Submitted By:- Kamaldeep Gupta C-3.
1. Maintenance Alignment with District ‘s Mission and Board and Superintendent’s Goal 2. Impacts of recent budget reductions 3. Review Energy Grant 4.
1 BROOKHAVEN SCIENCE ASSOCIATES CHILLED WATER & COMPR. AIR PIPING Thomas F. Joos, P.E. Lead Civil/Structural Engineer CFAC Review November 9-10, 2009.
METRO WASTEWATER RECLAMATION DISTRICT CAPITAL IMPROVEMENTS PROGRAM
Bridge Abutment Repair Old King’s Road Location; Old King’s Road N
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
SKUNK RIVER PIPELINE PROTECTION PROJECT NEAR DENMARK, IOWA SUB MAR.
Upper Newsome Creek Habitat Improvement Pre-solicitation Restoration of Upper Newsome Stream Reach 3 and Haysfork Sediment Pond Restoration.
Chirstchurch: Pipelines. Earthquake Concerns on Underground Pipes Wave propagation Permanent ground deformation Liquefaction Can lead to pipe leakage.
Community of Aspendell (Elev. 8400) Bishop Creek Area, Inyo County, CA MAIN PROJECT OBJECTIVES Replace existing sewer pipe and install new PVC sewer pipe.
David Kerr, PE Lessons Learned from recent challenging HDD installation.
Raw and Finished Water System Improvements April 22, 2014.
PROF. DR. FEVZİ YILMAZ Fatih Sultan Mehmet Vakıf University, Faculty of Engineering, İstanbul ICSG ISTANBUL 2015, APRIL.
Webster Water System Board of Selectmen Public Hearing on Water Quality October 13, 2015 Doran Crouse, Webster Water Department Scott Charpentier, P.E.,
Standard CLG – Pipebursting Method Machine and insertion pits are excavated at the ends of the deviated sewer section and a rod pusher/puller and RSI Rotary.
March 3, 2016 Discovery Sewer/RWQCB LSM Vallecitos Water District Regional Water Quality Control Board (RWQCB) Lake San Marcos February 10, 2010.
CTC 450 Review 1  WW Characteristics. Objectives 2  Understand the basics of storm drainage systems  Understand the basics of sewer systems.
Project Study Building The Trail. On September 19 th, Avery Ritter, David Madsen, Sam Marlo, James Laird, Ryan Mee and Dillon Kelly with Mr. Les Greear,
Planning and Implementation of Sewerage Schemes. Sewerage The waste water collection, transportation through conveyance & Disposal system.
Miller Driscoll Building Committee Update Tuesday, January 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations Miller-Driscoll.
Water and Waste Department 2016 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association April 20,
State Route 342 Bypass and Realignment Solution Joint Effort of the Nevada Department of Transportation, Storey County, and Comstock Mining.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
BY MOHANA.V CIVIL ENGINEERING FINAL YEAR - VII SEM.
Innovative Approach to Water Main Renewal
26 – Wastewater Conveyance System Design 2
City of Whitehorse 2017 Capital Projects & Service Requirements Peter O’Blenes, P. Eng February 21,2017.
CTC 450 Review WW Characteristics.
TRENCHLESS TECHNOLOGY
EFFECTIVE EROSION AND SEDIMENTATION CONTROLS FOR IN-CHANNEL PROJECTS
Audie Murphy Road Sewage Lift Station Award of Construction Contracts
TRENCHLESS TECHNOLOGY (TT) IN SMART CITIES
NORTH TRUNK SEWER REPLACEMENT PROJECT
Reach 4 Air Valve Replacements Award of Construction Contracts
Water Department has Six Divisions
TRENCHLESS TECHNOLOGY
Consulting Captains, LLC
Water Main Rehabilitation Cured-In-Place-Pipe Technology
Parkland/Brookdale Interceptor Replacement
Lehigh Canal Spoil Removal At Old King’s Road.
Colchester Interceptor System Improvements Project
Irrigation Water Management in Arkansas
City of Greater Sudbury Lining Program Overview. Brittany Hallam, P
Water Types of water Sewer systems TCU/VIA 6th semester workshop
Engine Top End Construction
909 RPDA 21/2”-10”.
Large Air Systems – Sales Training
709 3/4”-2”.
North Carolina's Selective Vegetation Removal.
Presentation transcript:

Lift Station No. 1 and 2 Force Main Replacement Ronald Wastewater District Summer 2015

Lift Station No. 1 Site Several field visits were done during design by both CHS Engineers and District Staff to determine construction methods.

Storm Creek Crossing The creek crossing was the most critical area of construction due to the necessity of keeping the creek free of sewage and other materials during the construction process.

Lift Station No. 2 Site After the field visits were done, plans and specifications were started and the District reached out to Innis Arden to help with a public meeting.

Force Main Valves Locate During design, another field visit was needed to determine the location of the existing force main valves outside of Lift Station No. 1.

Temporary Erosion and Sediment Control and Force Main Bypass After design and the bidding process was completed, a contractor began work. The first step was protecting the existing site, especially the creek, and bypassing the existing force main.

Existing Force Main Removal Once the temporary force main was in operation, the existing force main connection and valves near Lift Station No. 1 were dug up and removed.

Existing Force Main Removal The contractor removed small portions of the existing force main by open cut trenching at both ends of the force main and at the creek crossing.

Installation of New Force Main The majority of the new force main was installed by pipebursting, which is a method of bursting the old pipe in the ground while pulling a new pipe in behind to fit in the same place.

Installation of New Force Main The pipebursting method was preferred by the District due to it being a trenchless method which kept the majority of the site undisturbed. The majority of the existing force main did not have to be dug up, only small holes at intervals.

Installation of New Force Main Portions of the new force main were also installed by open cut trenching such as the connection to Lift Station No. 1.

Installation of New Force Main Another portion of the new force main that was installed by open trenching was the creek crossing. First the creek was bypassed and then a larger diameter ductile iron pipe was placed under the creek to protect the new force main.

Installation of New Force Main After placing the larger diameter ductile iron pipe under the creek, the new force main was sliplined through it and the larger pipe was sealed around it.

Installation of Force Main Bends The last portion of the new force main to be installed by open cut trenching was the force main bends. At the bottom of the hill down from Lift Station No. 2, the new force main turns and goes up the hill.

Storm Creek Crossing After the new force main was installed and tested, the site was restored. Native plants were planted in October 2015.

Lift Station No. 2 Site Before During After

Lift Station No. 1 Site Before During After

Storm Creek Crossing Before During After

Project Complete! On schedule and under budget! Ronald Wastewater District, CHS Engineers LLC, and Trenchless Construction Services LLC