ATLAS P. Morettini - ATLAS Collaboration 3/9/20131Paolo Morettini - ICNFP 2013.

Slides:



Advertisements
Similar presentations
L1 Track Trigger for ATLAS at HL-LHC
Advertisements

B-tagging, leptons and missing energy in ATLAS after first data Ivo van Vulpen (Nikhef) on behalf of the ATLAS collaboration.
Guoming CHEN The Capability of CMS Detector Chen Guoming IHEP, CAS , Beijing.
(ATLAS) Higgs Prospects at HL-LHC. ATLAS CMS ALICE LHCb Center-of-Mass Energy ( ) 7 TeV Center-of-Mass Energy (Nominal) 14 TeV ? Center-of-Mass.
Digital Filtering Performance in the ATLAS Level-1 Calorimeter Trigger David Hadley on behalf of the ATLAS Collaboration.
The ATLAS Upgrade Programme Thorsten Wengler ECFA High Luminosity LHC Experiments Workshop 1 st – 3 rd October 2013 Aix-les-Bains, France.
P5 Meeting - Jan , US LHC University M&O Personnel University with major hardware responsibility at CERN Based on > 10 years of US Zeus experience.
CMS Phase 2 Upgrade: Scope and R&D goals CMS Phase 2 Upgrade: Scope and R&D goals October 21, 2014 Jeremiah Mans On behalf of the CMS Collaboration.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
The ATLAS B physics trigger
LHC SPS PS. 46 m 22 m A Toroidal LHC ApparatuS - ATLAS As large as the CERN main bulding.
The ATLAS trigger Ricardo Gonçalo Royal Holloway University of London.
Online Measurement of LHC Beam Parameters with the ATLAS High Level Trigger David W. Miller on behalf of the ATLAS Collaboration 27 May th Real-Time.
1 Operating, Maintaining, and Upgrading the LHC Detectors Sally Seidel University of New Mexico National Science Foundation February 21, 2003.
General Trigger Philosophy The definition of ROI’s is what allows, by transferring a moderate amount of information, to concentrate on improvements in.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
BEACH Conference 2006 Leah Welty Indiana University BEACH /7/06.
Hadron Calorimeter Readout Electronics Calibration, Hadron Calorimeter Scintillator Upgrade, and Missing Transverse Momentum Resolution due to Pileup Zishuo.
1 Performance of the LHCb VELO Outline LHCb Detector and its performance in Run I LHCb Detector and its performance in Run I LHCb VELO LHCb VELO VELO performance.
T. Kawamoto1 Small Wheel upgrade project Muon week, upgrade meeting T. Kawamoto.
Faster tracking in hadron collider experiments  The problem  The solution  Conclusions Hans Drevermann (CERN) Nikos Konstantinidis ( Santa Cruz)
Sez. di Lecce Universita` degli Studi del Salento The Muon Trigger in ATLAS Giovanni Siragusa On behalf of the ATLAS Muon Trigger group.
Roger Rusack – The University of Minnesota 1.
HEP 2005 WorkShop, Thessaloniki April, 21 st – 24 th 2005 Efstathios (Stathis) Stefanidis Studies on the High.
C. K. MackayEPS 2003 Electroweak Physics and the Top Quark Mass at the LHC Kate Mackay University of Bristol On behalf of the Atlas & CMS Collaborations.
Valeria Perez Reale University of Bern On behalf of the ATLAS Physics and Event Selection Architecture Group 1 ATLAS Physics Workshop Athens, May
IOP HEPP: Beauty Physics in the UK, 12/11/08Julie Kirk1 B-triggers at ATLAS Julie Kirk Rutherford Appleton Laboratory Introduction – B physics at LHC –
The CMS detector as compared to ATLAS CMS Detector Description –Inner detector and comparison with ATLAS –EM detector and comparison with ATLAS –Calorimetric.
The ATLAS Upgrade Plan (Preparing for the next 2 Decades of Data) V. Polychronakos, BNL DPF Providence, RI, 9 August, /9/2011ATLAS Upgrade Plan.
G. Volpi - INFN Frascati ANIMMA Search for rare SM or predicted BSM processes push the colliders intensity to new frontiers Rare processes are overwhelmed.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
Overview of the High-Level Trigger Electron and Photon Selection for the ATLAS Experiment at the LHC Ricardo Gonçalo, Royal Holloway University of London.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment is one of the four major experiments operating at the Large Hadron Collider.
CP violation in B decays: prospects for LHCb Werner Ruckstuhl, NIKHEF, 3 July 1998.
ATLAS Upgrade Report ATLAS Upgrade Report (20/03/12) Planning Assumptions Phase-0 Plans Phase-I Plans - Letter of Intent Phase-II - LoI Planning Conclusions.
TRIGGERING IN THE ATLAS EXPERIMENT Thomas Schörner-Sadenius UHH Teilchenphysik II 4. November 2005.
Susan Burke DØ/University of Arizona DPF 2006 Measurement of the top pair production cross section at DØ using dilepton and lepton + track events Susan.
Fabiola Gianotti, 14/10/20031  s = 28 TeV upgrade L = upgrade “SLHC = Super-LHC” vs Question : do we want to consider also the energy upgrade option.
Performance of the ATLAS Trigger with Proton Collisions at the LHC John Baines (RAL) for the ATLAS Collaboration 1.
A Fast Hardware Tracker for the ATLAS Trigger System A Fast Hardware Tracker for the ATLAS Trigger System Mark Neubauer 1, Laura Sartori 2 1 University.
LHC Symposium 2003 Fermilab 01/05/2003 Ph. Schwemling, LPNHE-Paris for the ATLAS collaboration Electromagnetic Calorimetry and Electron/Photon performance.
Living Long At the LHC G. WATTS (UW/SEATTLE/MARSEILLE) WG3: EXOTIC HIGGS FERMILAB MAY 21, 2015.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment [1] is one of the four major experiments operating at the Large Hadron Collider.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
High-Luminosity upgrade of the LHC Physics and Technology Challenges for the Accelerator and the Experiments Burkhard Schmidt, CERN.
Zvi Citron Correlations Between Neutral Bosons and Jets in Pb+Pb Collisions at 2.76 TeV with the ATLAS Detector Zvi Citron for the ATLAS Collaboration.
Upgrade Intro 10 Jan 2010 Norman Gee. N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?
14 Aug. 08DOE Review John Huth Future Harvard ATLAS Plans John Huth.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
More technical description:
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
ATLAS Pixel Detector for HL-LHC
CMS muon detectors and muon system performance
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
Optical data transmission for
Why Micromegas? Muon Upgrade Workshop, 27/01/2012 Jörg Wotschack.
Kevin Burkett Harvard University June 12, 2001
High Level Trigger Studies for the Efstathios (Stathis) Stefanidis
The First-Level Trigger of ATLAS
ATLAS Silicon Tracker commissioning
Experimental Particle Physics PHYS6011 Putting it all together Lecture 4 28th April 2008 Fergus Wilson. RAL.
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Dual readout calorimeter for CepC
Presentation transcript:

ATLAS P. Morettini - ATLAS Collaboration 3/9/20131Paolo Morettini - ICNFP 2013

ATLAS Outline In this talk, we will briefly review the performance of the ATLAS detector in its present configuration and we will illustrate the upgrade plan:  ATLAS performance  Motivations for the upgrade  Phase 0 upgrade – LS1 i.e. now  Phase 1 upgrade – LS2 –  Phase 2 upgrade – LS3 – An obvious disclaimer: experience teaches us that many things can change in ten years, so, especially for Phase 2, there are many unknowns (from the scientific and also from the financial point of view) that can modify our plans. 3/9/2013 Paolo Morettini - ICNFP

ATLAS Muon spectrometer  tracking MDT (Monitored drift tubes) CSC (Cathode Strip Chambers) RPC (Resistive Plate Chamber) Trigger TGC (Thin Gas Chamber) Trigger Toroid Magnet 3 Level Trigger system L1 – hardware – 100 kHz 2.5  s latency L2 – software – 3-4 kHz 10 ms latency EF – software – 100 Hz 1-2 s latency Inner Detector (ID) Tracking Silicon Pixels 50 x 400  m 2 Silicon Strips (SCT) 80  m stereo Transition Radiation Tracker (TRT) up to 36 points/track 2T Solenoid Magnet Calorimeter system EM and Hadronic energy Liquid Ar (LAr) EM barrel and end-cap LAr Hadronic end-cap Tile calorimeter (Fe – scintillator) hadronic barrel The ATLAS Detector 4/7/20123 Paolo Morettini - iWoRID 2012 Tile Calorimeter Liquid Argon calorimeter TRTPixel DetectorSCTSolenoid Magnet Muon Detector Toroid Magnet ATLAS Performance

ATLAS 6/5/2013 Paolo Morettini 4 ATLAS Trigger and DAQ 10 8 channels on-detector (40 MHz readout) L2 trigger – 10 kHz – 20 ms On L1 selected geometrical regions. Software. L1 trigger – 100 kHz – 25 us Then extraction from detector to readout system Event Filter – 400 Hz – 2 s Software. ATLAS Performance

ATLAS LHC Performance  LHC performed extremely well in the three years of the first run.  In 2012, peak luminosity has been systematically above cm -2 s- 1  Total accumulated luminosity was 23.3 fb -1, enough to firmly establish the Higgs discovery and its basic parameters. 3/9/2013 Paolo Morettini - ICNFP ATLAS Performance

ATLAS ATLAS Performance  ATLAS performance was as well satisfactory, with an average data taking efficiency exceeding 93% and a fraction of active channels of 95%  It is important to note that most of 2012 data was taken with an average number of pile-up events per crossing around 35, due to the 50 ns spacing. A data-taking environment more challenging than the one expected at design luminosity and 25 ns spacing. 3/9/2013 Paolo Morettini - ICNFP ATLAS Performance

ATLAS Trigger performance The ATLAS trigger system demonstrated to be robust and flexible enough to follow the rapid LHC luminosity increase maintaining full efficiency. Many algorithms (more than 500 trigger items) were developed to guarantee optimal selection. Stability vs pile-up was a concern, but no problem observed so far. 3/9/2013 Paolo Morettini - ICNFP ATLAS Performance Single e, Et > 25 GeV Efficiency vs pile-up

ATLAS Higgs physics perspectives As recognized in the recent European Strategy symposium, the priority after the consolidation of the Higgs discovery is to obtain precise measurement of the parameters of the new particle:  Mass and width  Quantum numbers  Couplings and self-coupling  Comparison with the SM LHC has been recognized as the natural facility to complete these studies, but obviously an increase in luminosity would significantly enhance the achievable precision. 3/9/2013 Paolo Morettini - ICNFP Motivations for the upgrade

ATLAS Beyond the Standard Model An increase in luminosity would as well be beneficial to extend the range of the searches for SUSY particle and for other “exotic” processes. 3/9/2013 Paolo Morettini - ICNFP Motivations for the upgrade SUSY particles at HL-LHC 3 TeV for squarks ~ 2.5 TeV for gluinos 400 GeV rise in sensitivity wrt the L=300 fb -1 case ttbar resonances at HL-LHC 6.7 TeV L=3000 fb -1 leptons + jets 5.6 TeV L=3000 fb -1 dileptons 4.3 TeV L=300 fb -1 leptons + jets 4 TeV L=300 fb -1 dileptons

ATLAS LHC upgrade plan 3/9/2013 Paolo Morettini - ICNFP Motivations for the upgrade

ATLAS Based on the experience of the first LHC run, we can say that ATLAS as is can successfully operate at cm -2 s -1 and possibly more. However, the ultimate goal of accumulating 3000 fb -1 in more than 15 years at 5 x cm -2 s -1 requires some intervention:  Several detectors, especially close to the beam line, will be damaged by the accumulated dose  The large number of interactions per crossing ( up to 150) will saturate read-out links and generate large occupancies.  A more and more selective trigger will be necessary to efficiently isolate the few interesting events 3/9/2013 Paolo Morettini - ICNFP Motivations for the upgrade cm -2 s cm -2 s -1

ATLAS ATLAS detector upgrade plan 3/9/2013 Paolo Morettini - ICNFP LS1 ↠ PHASE 0 ℒ = cm -2 s -1 = fb -1 ( ) LS2 ↠ PHASE 1 ℒ = 2x10 34 cm -2 s -1 = fb -1 ( ) LS3 ↠ PHASE 2 ℒ =5x10 34 cm -2 s -1 = fb -1 ( ) Installation of the 4 th Pixel Detector Layer Pixel Detector improvements DBM beam monitor Silicon tracker cooling system replacement Muon EE chambers completion New Muon Small Wheel detector Upgrade of the central L1 trigger processor Topological L1 triggers L1 Calo granularity increase New “All Silicon” tracker New L0-L1 trigger schema Inclusion of track info at L1 Upgrade of the calorimeter readout Upgrade of the muon spetrometer Phase 0 In Progress…

ATLAS Pixel detector upgrade Need to cure progressive radiation damage and mitigate inefficiencies due to pile-up effects. Two substantial interventions are in progress during LS1:  Replacement of service distribution panels, to cure malfunctioning channels, increase accessibility and bandwidth.  Installation of a 4 th layer (IBL), close to the beam pipe (33-38 mm from the beam line). 3/9/2013 Paolo Morettini - ICNFP Phase 0 New SQP “old” Beam Pipe R = 29 mm IBL setup 25 mm mm

ATLAS IBL technologies  Originally thought as a LS2 intervention, the Pixel upgrade was anticipated to guarantee a more robust tracking system and a less radioactive working environment.  New technologies prototyping Phase 2 upgrade:  New FE chip (FE-I4) in 130 nm CMOS, with smaller cells (50 x 250  m 2 ) and faster output links 3/9/2013 Paolo Morettini - ICNFP Phase 0 Pixel Read-out inefficiency vs LHC Luminosity FE-I3 FE-I4 b-tagging rejection vs pile-up With IBL Without IBL

ATLAS IBL technologies  Originally thought as a LS2 intervention, the Pixel upgrade was anticipated to guarantee a more robust tracking system and a less radioactive working environment.  New technologies prototyping Phase 2 upgrade:  New FE chip (FE-I4) in 130 nm CMOS, with smaller cells (50 x 250  m 2 ) and faster output links  3D sensors in the forward region (lower bias voltage, immunity to bulk defects), planar, slim edge, n-in-n in the central region. 3/9/2013 Paolo Morettini - ICNFP Phase 0

ATLAS More LS1 interventions…  As a part of the IBL installation, we will replace the beam pipe: the central part will be in beryllium, the outer part in aluminium.  The evaporative cooling system of Pixel and Strips will be replaced.  More Muon End-cap Extension chambers (EE) will be installed, to improve coverage in the 1.0 < |n| < 1.3 region.  Add specific neutron shielding  Diamond Beam Monitor (DBM) diamond pixel detector with IBL readout Then, in this long shutdown, as in the following ones, many small interventions will be performed here and there to cure problems that cannot be addressed in a regular shutdown or to replace obsolete components (e.g. power supplies, readout elements, …) 3/9/2013 Paolo Morettini - ICNFP Phase 0 EE

ATLAS ATLAS detector upgrade plan 3/9/2013 Paolo Morettini - ICNFP LS1 ↠ PHASE 0 ℒ = cm -2 s -1 = fb -1 ( ) LS2 ↠ PHASE 1 ℒ = 2x10 34 cm -2 s -1 = fb -1 ( ) LS3 ↠ PHASE 2 ℒ =5x10 34 cm -2 s -1 = fb -1 ( ) Installation of the 4 th Pixel Detector Layer Pixel Detector improvements DBM beam monitor Silicon tracker cooling system replacement Muon EE chambers completion New Muon Small Wheel detector Upgrade of the central L1 trigger processor Topological L1 triggers L1 Calo granularity increase New “All Silicon” tracker New L0-L1 trigger schema Inclusion of track info at L1 Upgrade of the calorimeter readout Upgrade of the muon spetrometer Phase 1 Preparing TDR

ATLAS Muon Small Wheel upgrade The innermost layer of the muon endcap is extremely sensitive to beam background. While working fine at the moment, the existing detector would produce an excessive fake L1 rate at luminosities above cm -2 s -1. Will be replaced with a new detector with higher position resolution (100  m) and direction reconstruction capability (1 mrad) to select tracks pointing to the primary vertex. 3/9/2013 Paolo Morettini - ICNFP Phase 1

ATLAS New Small Wheel impact From the detector technology point of view, NSW will use two solutions:  Small strip Thin Gas Chambers (sTGC) for L1 trigger  Micromegas (MM) for precision tracking The new detector will ensure a strong reduction of single muon rates with a reasonable safety margin up to 5 x cm -2 s -1 3/9/2013 Paolo Morettini - ICNFP Phase 1 Muon L1 Rates vs p t threshold NOW with NSW x3 reduction for p T (μ)>20 GeV at cm ‐2 s ‐1 sTGC MM sTGC

ATLAS Calorimetric trigger  The granularity of the EM L1 trigger will be increased, to exploit shower longitudinal and transvers shape.  Better electron-jet separation will be achievable.  Will allow un-prescaled single electron triggers at Et ~ 25 GeV above cm -2 s -1  Together with an update of the central L1 trigger processor, topological L1 triggers will be available. 3/9/2013 Paolo Morettini - ICNFP Phase 1

ATLAS FTK FTK is a track trigger processor. It can produce tracks with a quality similar to the off-line in ~25  s.  Based on CDF experience  Pattern recognition is done using associative memories, track fit with a FPGA processor.  In ATLAS, FTK uses L2 trigger data, but the output is ready at the beginning of L2 software processing.  Better HLT algorithms for b- tagging,  identification and lepton isolation will be available. 3/9/2013 Paolo Morettini - ICNFP Phase 1

ATLAS ATLAS detector upgrade plan 3/9/2013 Paolo Morettini - ICNFP LS1 ↠ PHASE 0 ℒ = cm -2 s -1 = fb -1 ( ) LS2 ↠ PHASE 1 ℒ = 2x10 34 cm -2 s -1 = fb -1 ( ) LS3 ↠ PHASE 2 ℒ =5x10 34 cm -2 s -1 = fb -1 ( ) Installation of the 4 th Pixel Detector Layer Pixel Detector improvements DBM beam monitor Silicon tracker cooling system replacement Muon EE chambers completion New Muon Small Wheel detector Upgrade of the central L1 trigger processor Topological L1 triggers L1 Calo granularity increase New “All Silicon” tracker New L0-L1 trigger schema Inclusion of track info at L1 Upgrade of the calorimeter readout Upgrade of the muon spetrometer Phase 2 LoI submitted

ATLAS New “All Silicon” tracker To face the challenge of HL LHC ATLAS will need a new tracker:  Progressive radiation damage will make the old detector inefficient  More granularity and more bandwidth is needed to operate at 5 x cm -2 s -1, due to the large pileup. The layout proposed in the LoI provides 14 points/track to |n| < 2.7  Pixel: 4 layers + 5 disks, 25 x 150 (in) / 50 x 150 (out)  m 2  Strips: 5 layers + 7 disks stereo 3/9/2013 Paolo Morettini - ICNFP Phase 2

ATLAS Tracker layout Clearly there are many options under investigation, and the details of the tracker layout will be fixed later. The challenge is always the same:  Produce a mechanical support with the best possible thermal and mechanical characteristics and, at the same time, as light as possible.  Find room and power dissipation capabilities for the on-detector electronics and the links needed to transmit the enormous amount of data. Present estimate lpGBT links at 9.6 Gb/s 3/9/2013 Paolo Morettini - ICNFP Phase 2

ATLAS TDAQ upgrade One interesting possibility open by the complete redesign of the tracker and by modern data transmission technologies is the inclusion of tracks at L1. This requires, however, some deep modification of the trigger strategy, as it is impossible to build tracks at full rate in few  s. The idea is to use a calorimetric and muon pre-trigger (called L0) to select events were tracks will be reconstructed. L0 signal will be sent only to tracker modules in selected space regions. 3/9/2013 Paolo Morettini - ICNFP Phase 2 Level-0 Rate 500 kHz, Lat. 6  s Muon + Calo Level-1 Rate 200 kHz, Lat. 20  s Muon + Calo + Tracks

ATLAS Calorimeter upgrade  No upgrade is required for the EM and Hadronic calorimeter to run at HL LHC.  The FE electronics (both LAr and Tile) needs however to be replaced. The idea is to move off-detector data from each collision (no on-detector buffering) and do L0, L1 processing off detector.  Hadronic endcap is designed for 1000 fb -1. A replacement is considered.  Forward calorimeter (3.2 < |n| < 4.9) may have overheating problems at high luminosities. A complete new system could be installed or just a new calorimeter in front of the existing one. 3/9/2013 Paolo Morettini - ICNFP Phase 2

ATLAS Muon spectrometer upgrade 3/9/2013 Paolo Morettini - ICNFP Phase 2 Extra layers with more resolution High resolution forward chambers New trigger chambers

ATLAS Summary A sophisticated apparatus like ATLAS needs constant care to operate efficiently. This is even more true if optimal performance has to be maintained over 20 years with a luminosity increase of a factor of 5 (and possibly more) compared to the original design. ATLAS has a three stage upgrade plan, following the LHC upgrade, with the emphasis on:  Replacing detectors damaged by radiation or saturated by the luminosity increase.  Add flexibility to the trigger system and bandwidth to the readout.  Replace obsolete components with newer and more maintainable technologies. 3/9/2013 Paolo Morettini - ICNFP