Comparison of Heavy Duty Hybrid Test Procedures Drafted in GTR n  4 James Sanchez US EPA 1/13/15 Informal document GRPE-70-15 (70 th GRPE, 12 - 16 January.

Slides:



Advertisements
Similar presentations
Non Road Mobile Machinery Engines Global Technical Regulation for Approval by GRPE Draft NRMM gtr 2009/16 Final Report 2009/17 Informal document No. GRPE
Advertisements

Worldwide Harmonized Heavy Duty Emissions Certification Procedure UNITED NATIONS 24th WHDC, Geneva, 03 June 2008 Informal document No. GRPE (56th.
Regulation No. 96 Proposal for 03 Series of Amendments GRPE, January 2011 Informal document No. GRPE (61st GRPE, January 2011, agenda item.
On-road Heavy-duty Engine Off-cycle Emissions gtr (OCE gtr) Status Report for AC.3 Report from the United States 24th Session of Executive Committee AC.3.
1 On-road Heavy-duty Engine Off-cycle Emissions GTR – Status Report for AC.3 Report from the United States 18th Session of Executive Committee AC.3 16.
Informal group on retrofit emission control devices Meetings held on June 7, September 27 and January 11 (this week) Drafting meeting at VDMA on November.
WLTP GTR 15 WLTP-10-34e Report by Drafting Coordinator, Serge Dubuc
Informal document GRPE-70-14
Determination of System Equivalency – TaskForce Audi, EA-52, V4.0 WLTP-10-33e.
REPORT TO GRPE 71 ST SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document GRPE st GRPE, 8-12 June 2015, agenda.
REPORT TO GRPE 68 TH SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document No. GRPE (68 th GRPE, 9-10 January, 2014,
UNECE/GRPE Informal WG on Heavy Duty Hybrids (HDH) Baltimore 2012 HDH Chair Petter Åsman Document: EVE-02-06e.
MACTP MOBILE AIRCONDITIONING TEST PROCEDURE Status report 64th GRPE June 2012 Informal document No. GRPE (64th GRPE, June 2012, agenda item.
Report from IWG on Environmental and Propulsion Performance Requirements for Light vehicles (EPPR) 69 th GRPE 5-6 th June 2014 Geneva Chair Petter ÅSMAN.
Determination of System Equivalency – Starting note for WLTP IWG Meeting #8 in Pune, India Audi, EA-52, V2.0 WLTP-08-09e.
Submitted by the Chair of the WLTP IWG Informal document GRPE st GRPE, 8-12 June 2015, agenda item 3(b) Status report of the WLTP Informal Working.
GRPE 70th session PMP INFORMAL GROUP progress report TO GRPE
1 GRPE Informal Working Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 68 Geneva, 09 January 2014 Informal document No. GRPE (68th GRPE,
Submitted by the Chair of the WLTP Informal Group Informal document No. GRPE (68th GRPE, Jan. 2014, agenda item 3(a)) Status report of the WLTP Informal.
Informal Group on Gaseous Fuelled Vehicles (GFV) Report 64th GRPE June 2012 Informal document No. GRPE (64th GRPE, June 2012, agenda item 8 (a))
Preparing for the Launch Mohammed El- Affendi. Launch Major Tasks  The Launch is performed according to script “LAU1”, table 3.1 in the book (page 39),
Unit 8 COST ISUITE-EP. Objectives Be able to: 1.Identify the purpose of the COST module. 2.Run Cost Processes 3.View Daily Costs 4.Generate Cost.
PMP Progress Report Activities since GRPE 58 Heavy Duty Validation testing Exercise completed in October Draft report and draft proposal to insert PN measurement.
1 GRPE Informal Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 63 Geneva, 19 January 2012 Informal document No. GRPE (63rd GRPE, 17 -
1 GRPE Informal Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 64 Geneva, 07 June 2012 Informal document No. GRPE (64th GRPE, June.
1 GRPE Informal Working Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 69 Geneva, 05 June 2014 Informal document No. GRPE (69th GRPE,
1 Bernardo MARTÍNEZ Automotive Industry Unit Transposition of EURO VI requirements into UN/ECE R49 GRPE January 2012 Submitted.
Assessment Criteria for the Acceptability of Cycle and Testing Procedure Informal working document DTP Subgroup LabProcICE slide 1 Assessment Criteria.
Software Project Management
Informal document GRPE (69th GRPE, 5 – 6 June 2014, agenda item 3(a))
Worldwide Harmonized Heavy Duty Emissions Certification Procedure UNITED NATIONS 22nd WHDC, Geneva, 16 January 2008 GRPE/WHDC/FE08 Informal document No.
GRPE 71 ST SESSION PMP INFORMAL GROUP PROGRESS REPORT TO GRPE 8 Jan 2015 Informal document GRPE st GRPE, 8-12 June 2015,
Worldwide Harmonized Heavy Duty Emissions Certification Procedure UNITED NATIONS 57th GRPE, Geneva, 15 January 2009 Informal document No. GRPE (57th.
Outcome of Meeting on “Environmentally Friendly Vehicle” on Noise Date : 15 th February th Informal Group Meeting on Environmentally Friendly Vehicle.
1 GRPE Informal Working Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 66 Geneva, 06 June 2013 Informal document No. GRPE (66th GRPE,
Status report and Discussion paper for Number of tests at WLTP Tokyo IWG in 2015 JAPAN WLTP-12-15e.
HDH 13 th - Summary. The universities and JARI presented methods for matching the work of the WHVC with the WHTC but smoothing the instantaneous power.
Joint Research Centre the European Commission's in-house science service JRC Science Hub: ec.europa.eu/jrc 38th UNECE IWG PMP MEETING Non- exhaust particle.
Transposition of EURO VI requirements into UN/ECE R49 Status report GRPE 9-June 2011 Submitted by the expert of European Commission 1 Informal document.
Summary of 4 th Informal Group on WLTP 14 January 2010 Palais des Nations, Geneva Informal document No. GRPE (59th GRPE, January 2010, agenda.
1 GRPE Informal Working Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 65 Geneva, 17 January 2013 Informal document No. GRPE (65th GRPE,
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-081 Leader: Per Ohlund / Kazuki Kobayashi.
Worldwide Harmonized Heavy Duty Emissions Certification Procedure UNITED NATIONS 58th GRPE, Geneva, 11 June 2009 Informal document No. GRPE (58th.
GRPE Informal Group on Heavy Duty Hybrids UNITED NATIONS Secretary’s Report to GRPE 61, Geneva, 13 January 2011 Informal document No. GRPE (61st.
WLTP-13-xxe Report by Drafting Coordinator, Serge Dubuc WLTP GTR 15.
Submitted by the expert from Japan the secretariat
Informal Group on Gaseous Fuelled Vehicles (GFV)
Co-Sponsors: China, Japan, EU and US 59th Session GRSP May 9-13, 2016
Electric Vehicles and the Environment (EVE IWG)
Informal document GRPE-73-21
Off-cycle Emissions GTR – Status Report for GRPE
Note by the secretariat
76th UNECE GRPE session PMP IWG Progress Report
Welcome to the 10th Meeting of WLTP DTP 6th June 2012 UNOG Geneva
HD FE Harmonization OICA HD-FE TF Y. Takenaka
Note by the secretariat
Submitted by the experts of OICA
Proposal for future maintenance of Mutual Resolution 2
Real Driving Emissions IWG Recommendations for Data Collection & EU Dataset
WLTP GTR 15 WLTP-09-18e Report by Drafting Coordinator, Serge Dubuc
Working Paper No. WLTP-05-11e
Drafting Group: Final Meeting Drafting Group: 1st Meeting
Informal document GRPE-77-30
Informal document GRPE-79-20
GRPE/WLTP-IG/ DHC subgroup
WLTP GTR 15 WLTP-12-18e Report by Drafting Coordinator, Serge Dubuc
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-028
EPPR secretariat proposal for Amendment of definitions
Palais des Nations, Geneva
GRPE/WLTP-IG/ DHC subgroup
Presentation transcript:

Comparison of Heavy Duty Hybrid Test Procedures Drafted in GTR n  4 James Sanchez US EPA 1/13/15 Informal document GRPE (70 th GRPE, January 2015 agenda item 4b) Submitted by the expert from the United States of America

2 Goals of the Comparison Compare emission results from the two methods Evaluate the repeatability of the two procedures Get hands-on experience with the two procedures Complete work by end of February to inform WP.29 vote in March

3 Overview of the Comparison Powertrain Testing at EPA Create Engine Cycles with HILS Run Engine Tests at EPA Analyze Results Create Engine Cycles from Powertrain Tests

4 Creating Cycles Using HILS Integrate the HCM from powertrain tested at EPA with FPT’s HILS bench –Update CAN messages for the hybrid control module (HCM) that is part of the powertrain (need support from hybrid manufacturer ) –Generate engine model parameters according to A –Run HILS and check that the engine cycle passes validation criteria in A –Rerun HILS if validation criteria is not met

5 Creating Cycle from Powertrain Test Use CAN data to extract engine speed/load operation from powertrain tests –Create engine cycle by modifying engine speed/load cycle while staying within the criteria of A.9.5.8

6 Test Article Eaton parallel hybrid transmission with 6 speed AMT 2010 Cummins ISB 200hp

7 Vehicle Parameters m (kg)11315 A (m^2)6.669 Cr Cd Vehicle parameters were calculated following subparagraphs of A using hybrid powertrain rated power of kW

8 PowertrainTesting Cold and hot start WHVC tests –3 repeats –2 axle ratios Run rated power test

9 Engine Testing Cycles –Option 1: Engine cycles created using HILS –Option 2: Engine cycles taken from powertrain tests Cold and Hot Start Tests –3 repeats –2 engine cycles

10 Status of the Comparison Powertrain testing with both axles has been completed Rated power tests have been completed with powertrain Integration of EPA’s HCM with FPT’s HILS bench is in progress –Verified that the 2 HCMs (from the Iveco vehicle and EPA powertrain) are wired the same. –CAN communication with the HCM as been established –There are currently multiple error codes triggered due to some of the CAN messages not defined –Will need to work with Eaton to define all CAN channels. Timing to this is not certain due to the proprietary nature of the information needed. Engine testing will start once engine cycles are determined. Testing will take approximately 2 weeks to complete.