Summary CDBM IMAGE meeting, 07 IMAGE SUMMARY IMAGE set up to provide a venue for discussion between the different Integrated Modelling (IM) activities.

Slides:



Advertisements
Similar presentations
Where are we in Integrated modeling? S. Jardin Mature 1½ D evolution code packages exist with reduced modules for most processes –Japan: BPSI: (TASK, TOPICS)
Advertisements

1. 2 August Recommendation 9.1 of the Strategic Information Technology Advisory Committee (SITAC) report initiated the effort to create an Administrative.
Extension of IEA Implementing Agreement on Large Tokamak Facilities Presented to Committee on Energy Research Technologies October 18-19, 2005 Paris, France.
FES International Collaboration Program: Vision and Budget Steve Eckstrand International Program Manager Office of Fusion Energy Sciences U.S. Department.
FSP: Validation 7/15/09 1 FSP: Validation Program Planning Presented by Martin Greenwald FSP Kick-off Meeting Princeton, 7/15/2009.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
“”Capacity and services to road users” Task descriptions Paul van der Kroon, Paris November 2005.
US NITRD LSN-MAGIC Coordinating Team – Organization and Goals Richard Carlson NGNS Program Manager, Research Division, Office of Advanced Scientific Computing.
Becoming a Teacher Ninth Edition
TeraGrid Information Services December 1, 2006 JP Navarro GIG Software Integration.
Progress & plans for advanced components Xianzhu Tang On behalf of the FSP component team & FSP management team.
-Nikhil Bhatia 28 th October What is RUP? Central Elements of RUP Project Lifecycle Phases Six Engineering Disciplines Three Supporting Disciplines.
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
RUP Implementation and Testing
Database structure for the European Integrated Tokamak Modelling Task Force F. Imbeaux On behalf of the Data Coordination Project.
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
1DEN/DSOE Romania september 2006 HOTLABSSA “The EU 6 th FP Support Specific Action HOTLABSSA: a new step towards an European Network on Hot Laboratories”
ExCo Meetings of IEA Large Tokamak Facilities and Poloidal Divertor IAs GA, San Diego; Jan 2-3, 2008 Dr. Erol Oktay Acting Director ITER and International.
OOI CI LCA REVIEW August 2010 Ocean Observatories Initiative OOI Cyberinfrastructure Architecture Overview Michael Meisinger Life Cycle Architecture Review.
CRISP & SKA WP19 Status. Overview Staffing SKA Preconstruction phase Tiered Data Delivery Infrastructure Prototype deployment.
The european ITM Task Force data structure F. Imbeaux.
1 Subprojects of IFERC K.Lackner (as Chair of IFERC Project Committee) Garching – 14 Apr 2011.
ASCAC-BERAC Joint Panel on Accelerating Progress Toward GTL Goals Some concerns that were expressed by ASCAC members.
LH Meeting, Prague 17 December, Integrated Predictive Modelling at JET V. Parail, G. Corrigan, D. Heading, J. Spence, P. Belo, G. Huysmans, F. Imbeaux,
ITPA Meeting, PPPL, April, y1999: two core and two SOL transport codes with about 15 users, who worked locally at JET; y2000: Secondees from.
U.S. Department of Energy’s Office of Science 20 th Meeting of the IEA Large Tokamak ExCo, May th Meeting of the IEA Poloidal Divertor ExCo, May.
Integrated Modeling for Burning Plasmas Workshop (W60) on “Burning Plasma Physics and Simulation 4-5 July 2005, University Campus, Tarragona, Spain Under.
Status of Integrated Tokamak Modeling activity in RUSSIA (Since May 2007)
INTEGRATED ASSESSMENT AND PLANNING FOR SUSTAINABLE DEVELOPMENT 1 Click to edit Master title style 1 Evaluation and Review of Experience from UNEP Projects.
6/23/2005 R. GARDNER OSG Baseline Services 1 OSG Baseline Services In my talk I’d like to discuss two questions:  What capabilities are we aiming for.
D. McCune 1 PTRANSP Predictive Upgrades for TRANSP.
Status Organization Overview of Program of Work Education, Training It’s the People who make it happen & make it Work.
B WEYSSOW 2009 Coordinated research activities under European Fusion Development Agreement (addressing fuelling) Boris Weyssow EFDA-CSU Garching ITPA 2009.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
G.Govi CERN/IT-DB 1 September 26, 2003 POOL Integration, Testing and Release Procedure Integration  Packages structure  External dependencies  Configuration.
Process Asad Ur Rehman Chief Technology Officer Feditec Enterprise.
SUMMARY OF 4th IPTA TRANSPORT AND ITB PHYSICS TG MEETING St. Petersburg, Russia, April 8-11, 2003 Presented by E.J. Doyle for the TG Note: this summary.
Steady State Discharge Modeling for KSTAR C. Kessel Princeton Plasma Physics Laboratory US-Korea Workshop - KSTAR Collaborations, 5/19-20/2004.
ComPASS Summary, Budgets & Discussion Panagiotis Spentzouris, Fermilab ComPASS PI.
Paul Alexander 2 nd SKADS Workshop October 2007 SKA and SKADS Costing The Future Paul Alexander Andrew Faulkner, Rosie Bolton.
SEE-GRID-2 The SEE-GRID-2 initiative is co-funded by the European Commission under the FP6 Research Infrastructures contract no
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
Integrated Modeling for Burning Plasmas Workshop (W60) on “Burning Plasma Physics and Simulation 4-5 July 2005, University Campus, Tarragona, Spain Under.
ITPA CDB&M and TP Topical Group Meetings, Lausanne, 7-10 May D Campbell ITER International Organization Acknowledgements: W Houlberg, V Mukhovatov,
High Risk 1. Ensure productive use of GRID computing through participation of biologists to shape the development of the GRID. 2. Develop user-friendly.
INFSO-RI JRA2 Test Management Tools Eva Takacs (4D SOFT) ETICS 2 Final Review Brussels - 11 May 2010.
3rd Helix Nebula Workshop on Interoperability among e-Infrastructures and Commercial Clouds Carmela ASERO, EGI.eu 17 September 2013, Madrid
PEER 2003 Meeting 03/08/031 Interdisciplinary Framework Major focus areas Structural Representation Fault Systems Earthquake Source Physics Ground Motions.
Connect communicate collaborate Bringing Governance into Distributed R&D Software Development – GÉANT Case Study Branko Marović
 Accelerator Simulation P. Spentzouris Accelerator activity coordination meeting 03 Aug '04.
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
SYSE 802 John D. McGregor Module 0 Session 3 Systems Engineering QuickView.
1 © 2007 Chapter 3 Strategic Planning for the EHR Migration Path.
Process 4 Hours.
Bob Jones EGEE Technical Director
EGEE Middleware Activities Overview
Market Operations Engagement Group EVSE Working Group – Principles
ITEA3 Project: ACOSAR Advanced Co-Simulation Open System Architecture
Next Generation Distribution System Platform (DSPx)
Guided Pathways at California Community Colleges
Guided Pathways at California Community Colleges
Guided Pathways at California Community Colleges
Verification and Validation Unit Testing
VLT Meeting, Washington DC, August 25, 2005
Chapter # 8 Quality Management Standards
Integrated Modeling for Burning Plasmas
MODULE 11: Creating a TSMO Program Plan
From Use Cases to Implementation
Presentation transcript:

Summary CDBM IMAGE meeting, 07 IMAGE SUMMARY IMAGE set up to provide a venue for discussion between the different Integrated Modelling (IM) activities. Scope: –Standardization of formats and interfaces Starting point for collaborations  week long meeting in Cadarache hosted by ITER in early September –Machine descriptions –Transport Solvers Initial work was originally expected to start this meeting –Delayed as an IMAGE project activities in partners though –V&V metrics and standardized test cases –Software Standards Short IMAGE session only in this meeting: –Report on the ITER IM meeting –Plans and status of the IM projects

ITER IM Workshop (Houlberg) Status report from the first ITER Integrated Modelling workshop –1 week meeting three weeks ago –Participants from EU, US, JP, RF and ITER –Focus on data structures and code interfaces Detailed topical discussion on code interfaces Collaborative opportunities – harmonizing data structures – EU ITM data structure implementation(CPO’s) “template” to base future discussions on Framework tools –US KEPLER tool “paradigm” for application framework? –ITER rather than ITPA host for continued “IMAGE” work? Future topics to be addressed: –Enhanced coordination of scenario modelling between ITER and the ITER parties –Verification and validation procedures Summary CDBM IMAGE meeting, 07

Plans and Status of partner programs JP (Yagi) –BPSI (TASK, Topics-IB and Sonic) Staged development phases with 2 & 5 year horizons RF (Konovalov) –Continued efforts centered around ASTRA + DINA Aligned with ITER shorter term needs EU (Strand) –ITM-TF simulation tools, integration technologies year horizon. US (Bateman) –Report on the FSP Workshop Report. Start FY 2009: year horizon scaling up to 28M$/yr –Ptransp status and plans on the 2.5 yr Horizon. Collaboration opportunities: facilitate sharing of modules and tools - data structures and tools. –Bilateral exchanges of tools and ideas –Discussions guided / “moderated” by ITER Summary CDBM IMAGE meeting, 07

BPSI-plans and status TASK code is under development as a core code of BPSI and now TASK V1.02 is available as an open source. developing BPSI data interface (BPSD) including standard data set and data exchange interface, taking account of the compatibility with EU ITM- CPO and US SWIM-Plasma State. BPSI execution interface (BPSX) is also under development for integrated monolithic approach and coordinated mono-functional approach. TOPICS-IB is under development in JAEA for integrated simulation of burning plasmas SONIC is under development in JAEA as a SOL/Divertor simulation code Interface between TASK and SONIC will be developed as a future work Summary CDBM IMAGE meeting, 07

RF plans Improved funding situation on the longer term Plasma start-up and termination RWM theory, code development, modeling and control options FPP – NBI modules, code development for self consistent simulation of the AE excitation and associated FP transport Reorganization of the codes according to ITER ITM strategy Detailed description of the physics model and mathematical algorithms employed – key issue for successful benchmarking and mutual progress! –Qualification part of V&V

EU Integrated Tokamak Modelling TF Summary CDBM IMAGE meeting, 07 The longer term aim is not a single (transport) code but a complete simulation environment Start of the Gateway for IM and deployment of code platform – Implies a complete set of data structures and associated tools – A fully operational portal/workflow configuration – Major code releases from all of Integrated Modelling Projects Extended set of platform tools forming a predictive core physics capacity for ITER – Production level modelling for ITER and a standard tool for current experiments – local clusters and grid 2010/11 - Whole device modelling capability including comprehensive core-edge coupling and first principles elements – Aiming towards Broader Approach IFERC level computations

PTRANSP developments Predictive simulations are now being carried out with the PTRANSP code based on advances in the past 2-1/2 years Significant advances in the physics content will be added during the next 2-1/2 years –High-quality widely used modules for transport, equilibrium, sources, sinks and large scale instabilities all interacting together in one code –Comparison with experimental data facilitated by extensive data analysis infrastructure already built into TRANSP As a result of the effort planned for the next three years, PTRANSP will become significantly more comprehensive PTRANSP will serve as a bridge to high-performance SciDAC Fusion Simulation Projects Summary CDBM IMAGE meeting, 07