High Density Polyethylene (HDPE) Lined Produced/Frac Flowback Water Evaporation Ponds Presented by: Neil Nowak, PE Phone: 303-221-1719

Slides:



Advertisements
Similar presentations
MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
Advertisements

Municipal Solid Waste Defined in 40 CFR Part 258.2
NOTICE TO OPERATORS DRILLING WELLS WITHIN 3/4 MILE OF THE RIM OF THE ROAN PLATEAU IN GARFIELD COUNTY PIT DESIGN, CONSTRUCTION, AND MONITORING REQUIREMENTS.
SOURCES OF WATER Rain water Root top Other collection system *Surface Water Rivers and Streams Lakes and Ponds Oceans and Seas *Ground Water Natural Spring.
Leachate Collection Systems. Class Objectives  To discuss landfill water balance  To present liner and leachate collection system (LCS) design information.
PREPARED BY- NABANITA SHARMA M.E. 3 RD SEMESTER ROLL NO.-10/12.
Timothy Townsend, PhD, PE Associate Professor
Agrichemical Containment Facility. NRCS Standard Practice 702 NRCS Practice Standard 702 AGRICHEMICAL CONTAINMENT FACILITY MDA REG. 640 Commercial Pesticide.
Secondary Containment: From A Contractors Point of View.
Company Overview of Charah Privately held company based in Louisville, Kentucky –Founded in 1987 Dedicated to providing the power industry the highest.
Natural Gas Drilling Activities - A State Perspective Ryan Benefield, P.E. Deputy Director, Arkansas Department of Environmental Quality
LEACHATE MANAGEMENT AND TREATMENT
Treatment of Slaughterhouse Wastewater
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
4.5 Pounds of Trash are produced Per Person Per Day Where Does our Trash Go? 27% Recycled 16% Burned 57% Landfilled Nationally: 31% Recycled 69% Landfilled.
Landfill Gas Utilization Hayley Eberly Department of Chemical Engineering The University of Texas at Austin C, 2007 BASF, 2007.
At 4620 square miles, Lane County, Oregon is nearly as large as the State of Connecticut and is home to some 336,000 residents. Short Mountain Landfill,
Development of Sanitary Landfill and Capping of Existing Dump site at Mysore
Presentation to: Technical Advisory Committee Onondaga Lake.
PRESENTED BY: SUNIL VADHER GYANPRAKASH SINGH PANKAJ BHALALA Wastech International Summit & Expo 4R’s (Reduce, Recover, Reuse, Recycle): A Way to Sustainability.
Plaistow, New Hampshire
And the contamination of Industrial Wasteland Adam Stanley Jonathan Beeson.
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Air Sparging at Fort Greely, Alaska Presented by Aung Syn & James Powell.
1 Thermal Remediation Services, Inc. Electrical Resistance Heating for In-Situ Remediation of Soil & Groundwater December 10, 2002 Greg Beyke (770)
On-Site Leachate Management RM of Tache Pilot Study.
LANDFILL PROFILING FOR GAS, LIQUIDS AND VACUUM & ENHANCED STEAM BIOREACTORS STI Engineering By Reg Renaud.
“GAS MART” petroleum facility in Florida By: Ernest Twum-Barimah Zhengzhong Fang (John) Zhengzhong Fang (John)
Hydraulic Fracturing Best Management Practices Environmentally Friendly Drilling Program John Michael Fernandez Matthew Gunter.
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
Muskegon Wastewater Treatment Facility
Contaminated ‘Brownfield’ site in south-eastern Michigan By Zhanyuan Cai And William Chow.
Wednesday, 12/12/2007, FYROM Prevention of Contamination from Mining & Metallurgical Industries in FYROM Strategic Plan for Prevention of Contamination.
Monday, 10/12/2007, SERBIA Prevention of Contamination from Mining & Metallurgical Industries in Serbia Strategic Plan for Prevention of Contamination.
New Live Learn Residence Hall. Current Grove With general placement of new building Create a reinvigorated role for The Grove in campus life.
 UAB Vilniaus waters - the largest water company in Lithuania, which operates not only in the city of Vilnius, but also the district, Svencionys and.
Kathy Metropulos Division of Drinking and Ground Waters Protecting your aquifer: What to consider when drilling oil and gas wells.
Landfill Processes. Objectives  Describe the physical, chemical, and biological processes occurring in a landfill  Describe leachate quality (Table.
Our Changing Earth The Earth is made up of different kinds of materials, including rocks. Soil, water, and the gases of the atmosphere. Soils have different.
4.5 Pounds of Trash are produced Per Person Per Day Where Does our Trash Go? 27% Recycled 16% Burned 57% Landfilled Nationally: 31% Recycled 69% Landfilled.
EnE 301: ENVIRONMENTAL ENGINEERING
Drain systems PAB Drain Systems Drain systems are important to allow equipment to be drained, opened, inspected and repaired If else, process fluids.
Unit C: Topic 6 NIMBY: Not In My Back Yard. Producing Wastes Since the industrial revolution, the amount of wastes being produced has been increasing.
SEWAGE TREATMENT.  Sewage is the mainly liquid waste containing some solids produced by humans, typically consisting of washing water, urine, feces,
Global Energy Security Forum Miami, Florida March 26, 2013 Mark K. Boling President HYDRAULIC FRACTURING OPERATIONS: SEPARATING FACT FROM FICTION.
Integrated Constructed Wetlands Regulatory Aspects - the EPA’s role Aoife Loughnane Inspector, Environmental Licensing Programme Environmental Protection.
FreshwaterJeopardy $100 $200 $300 $400 $500 $100$100$100 $200 $300 $400 $500 Freshwater Systems and Resources How We Use Water Quantity of Freshwater Freshwater.
David Dippel, P.G. Frank Zeng, P.E. Waste Permits Division Municipal Solid Waste Permits Section 2015 TCEQ Environmental Trade Fair.
Weathering and Soil Formation
Chapter 23 – Sections 1, 2, and 3 Earth’s Surface.
Former Point Cook Fire Training Area Contamination Remediation Works Project Community Information Session 26 September 2013.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Environmental Toolbox. Technical Module Introduction.
Lynsay Bensman 06 October 2009 Errors in Sampling/Monitoring in an Internal Corrosion Program NACE Eastern Area Conference.
It All Starts Here... A day in the life of your waste water...
Lesson Understanding Soil Drainage Systems. Interest Approach Ask students the question, “What determines how fast water will flow through a funnel?”
GO C3Analyze and Evaluate Mechanisms Affecting the Distribution of Potentially Harmful Substances within an Environment. Transport of Materials Through.
Chapter 16 Landfill Liners and Geosynthetics
Design and Construction of Composite Lined Landfills
Upland Landfill Waste Discharge Application 7295 Gold River Highway
Sewage Treatment.
The ability for the ocean to absorb and store energy from the sun is due to… The transparency of the water that allows the sun’s ray to penetrate deep.
Average person produces 1700 lbs of MSW per year
Stabilization Ponds for Wastewater Treatment
17.7 Single Clay Liner and Single Geomembrane Liner Systems
Planning, Design, and Installation of a Successful Water Management System to Support a Development Drilling and Completion Campaign D. Steven Tipton,
From Tanker Roll-Over to NFA
Mohr Separations Research, Inc.
10 Feet Cistern, clear water drain
Coal Waste Storage Area Pond Design/Build Project Stanton Energy Center Chip Merriam Chief Legislative & Regulatory Compliance Officer.
Presentation transcript:

High Density Polyethylene (HDPE) Lined Produced/Frac Flowback Water Evaporation Ponds Presented by: Neil Nowak, PE Phone: Website: scsengineers.com

TOPIC OF PRESENTATION: Use of black High Density Polyethylene (HDPE) as the top layer of brine (production) and flow back water evaporation pond facilities and the affects on evaporation rate. Case study.

HDPE Lined Evaporation Ponds

PURPOSE: Dispose of production water and flow back water generated from oil and gas development. Several million barrels of production water and flow water is generated each year in the mountain states. Other types of evaporation and disposal facilities exist.

SELECTION OF TECHNOLOGY: Technologies for managing production and flow back water: –Disposal injection into acceptable zone –“Frac” injection of the water into the production formation to enhance yield –Treatment for surface discharge or reuse –Evaporation

HDPE Lined Evaporation Ponds Not Extinct Yet?

DESIGN…WHY HDPE?: Textured 60-mil HDPE for top liner of ponds not buried. Ultraviolet (UV) degradation resistance. Durability (20 plus years, Ivy 2002). Chemical resistance. Black color enhances evaporation of water. HDPE was chosen over clay liner and other geomembranes due to being the most compatible with site conditions and regulations (i.e. exposed to sunlight, desiccation, and hydrocarbons). Textured surface used to aid with traction if operations personnel fall into ponds, and to increase slope friction and stability.

DESIGN (continued):

High Density Polyethylene (HDPE) designed as the primary or top layer of the lined ponds in order to protect the groundwater and to enhance the evaporation of the production water within the ponds.

CONSTRUCTION Ponds designed and constructed with one or two geomembranes over compacted clay or geosynthetic clay liner and a geonet leak layer in between to monitor the primary liner for leaks.

CONSTRUCTION Geomembrane panels are welded together throughout the installation performed by trained and certified technicians.

CONSTRUCTION Geomembrane panels are tested for strength throughout the installation performed by trained and certified technicians.

Projects located in semi-arid regions: –Eastern Utah (Danish Flats) near Cisco –North of Baggs, WY (Southern Cross) –Cheyenne, WY (Silo Field) –Northeast WY (Bluegrass Water at Wright)

PROCESS: Production water delivered to the sites via tanker trucks for disposal by evaporation. Danish Flats facility went operational with 4 ponds in May 2008, and currently at 14 ponds operational as of Sep Southern Cross facility went operational with 2 ponds in July 2008 with an additional 3 ponds constructed in 2011 and Silo Field near Cheyenne, WY went operational in June 2012 with 3 ponds and state-of-the-art oil/water separation equipment. Bluegrass Water near Wright, WY went into operation in January 2015 with Pond 1 and then Pond 2 completed in July 2015.

PROCESS (continued): Each constructed evaporation pond is approximately 5.2 acres at the top of the berm (DF, Utah=70 acres of ponds, Southern Cross, WY=20 acres of ponds, Silo Field, WY=15 acres of ponds, and Wright, WY=16 acres of ponds, each pond is 8 acres). The evaporation ponds are designed to hold at capacity: –330,000 barrels (42 gallon/barrel) of water at 12 feet depth –580,000 barrels at 22 feet deep –1 million barrels at Wright, WY.

PROCESS (continued): Production water (brine water) or flow back water is delivered by truck and moved from an off- loading area to the ponds by gravity, or via force main after removal of the hydrocarbons through pretreatment. Hydrocarbons are removed through various pretreatment processes, including gun barrel tanks, sludge pits and state-of-the-art equipment. Emissions from pretreatment are routed to a control device.

Truck receiving area/off-loading via hose and pipeline to initial phase separation in acceptance pits or gun-barrel tanks.

At Danish Flats, off-gases from acceptance pits and gun barrel tanks are routed to a control device, which includes a thermal oxidizer and scrubber.

From acceptance pits/gun- barrel tanks the water HDPE lined settlement/sludge pond Last stage of hydrocarbon removal and collection that require bird-netting to cover the water, which will likely have floating hydrocarbon. These sludge ponds also are emission sources for volatile organic compounds (VOCs) if the floating product is not removed promptly.

The water is fed by gravity or force main pipe to the evaporation ponds from the settlement/sludge pond or directly from the oil/water separation equipment.

EVAPORATION: Ponds designed to store and evaporate production and flow back water. Top layer of the pond liner is textured surface 60-mil HDPE. Climate at these sites are ideal in the semi-arid mountain west for evaporation during May through October. HDPE liner aided evaporation due to black color of surface.

EVAPORATION (continued):

Annual design evaporation rates estimated to be approximately: Danish Flats = 50 inches Southern Cross = 40 inches Silo Field = 45 inches Wright = 45 inches Danish Flats = actual annual evaporation encountered during 2008 was nearly 70 inches (an increase of nearly 30% due to shallower water in ponds); in 2009 and 2010 was nearly 60 inches (increase ~15%); and for 2012 was measured at 42 inches for May through August At Southern Cross in 2010 was approx. 55 inches (increase ~30%). At Silo Field was approximately 52 inches inches per year in At Wright was approximately = 30 inches in July including evaporation equipment.

EVAPORATION (continued): Evaporation is enhanced using the surface of the HDPE geomembrane.

EVAPORATION (continued): Evaporation is enhanced using atomizers that spray fine mist above the water…~5,000 bbls/day.

EVAPORATION (continued): During ideal conditions for evaporation (May through October) of water which has been found to be up to 1-inch (approx) per day on the hottest days in July in August. During low evaporative months of November through April, the facilities store the water in the ponds.

Ideal conditions for evaporation occurs when: –The air temperature is above 80 degrees Fahrenheit and sunny, –The wind blows, and –The level of water in a pond is not greater than 3 feet deep.

MAINTENANCE: After several years of operation (possibly 8 to 10 years), the “salt” from the production or brine water builds up as precipitate in the pond bottoms. Upon excessive build-up of sediments or upon closure, then all the water is evaporated and the sediments dried and either removed or the facility buried (closure).

CONCLUSIONS: Evaporation facilities are serving a need of the region and the oil/gas industry. Evaporation of production/flow back water is one of the low cost methods for disposal. HDPE as the top layer is the right choice due to proven durability and resistance to UV and chemical degradation. HDPE improves the evaporative ability of the ponds with the black color of the liner.

HDPE Lined Evaporation Ponds

Southern Cross with five ponds operational (2014), including enhanced evaporation sprayers:

HDPE Lined Evaporation Ponds Silo Field under construction 2011, includes GCL, and double geomembrane with leak layer in between:

HDPE Lined Evaporation Ponds Silo Field under construction 2012

HDPE Lined Evaporation Ponds Wright under construction 2015

Questions are welcome. Thank you for your interest. Presented by: Neil Nowak, PE Phone: Website: scsengineers.com