ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.

Slides:



Advertisements
Similar presentations
ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.
Advertisements

HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
CERN, November 25, 2003 – Technical Board Support chariot for ITS & FMD services on the RB24 side Foreward –This presentation reports the current ideas.
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
ATLAS Pixel Detector July 2003 ETC ‘04 E. Anderssen LBNL BPSS and Service Panels Santa Cruz, CA E Anderssen LBNL.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
1 IBL Integration Activities & Future plans  Overall FEA on Geneva (in convergence with Seattle)  News from IST Composite Design  Integration.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
ATLAS Pixel Detector Pixel Support Tube Interfaces LBNL Internal PST Review E. Anderssen, LBNL.
FEBRUARY 2003 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Support Tube PRR: Parts Pixel Support Tube Production Readiness Review Parts Overview Alexis.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
SLHC Pixel Layout Studies S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman LBNL November 4, 2008.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
ATLAS Pixel Detector March 2004 Video Conference E. Anderssen LBNL PP1 Opto Connector and Fiber Routing Updated with notes from 23-March Meeting E. Anderssen,
Blade Tuner assembly Instruction for tuner assembly on a cryomodule May
ATLAS Pixel Detector JULY 2001 Pixel Support Tube N. Hartman LBNL 1 Pixel Support Tube Concept and Design N. Hartman, E. Anderssen, G. Gilchriese, S. Dardin.
ATLAS Pixel Detector Service Quarter Panel Update And PP1 Work July 4, 2006 Pixel Integration Meeting M Cepeda, S Dardin, K Kennedy, R Post, M Pereira,
M. Gilchriese Disk Geometry January 18, M. Gilchriese 2 ATLAS Coordinate System.
ATLAS Pixel Detector Project N. Hartman LBNL 1 Alexis Smith Intern Progress Report Neal Hartman, March 25, 2003.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
ACFA-7; Taipei, Nov 2004 H.Weerts status Si licon D etector Status H.Weerts Fermilab/Michigan State Univ. (Progress on Si-tracker layout)
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
WG3 Insertion/Extraction Testing Program R. Vuillermet 11/04/20111.
LHCC referee meeting L.Rossi - INFN / Genova CERN - March Status of insertable pixel  Layout in 2000 (Dubna layout)  Reasons for the change.
ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Service Connectivity from Module to PP1b Eric Anderssen LBNL Pixel Services Meeting, CERN.
CEDAR Support Structure Peter Sutcliffe 24 th January 2011.
B-layer integration with beam-pipe and services ATLAS B-layer upgrade E. Anderssen A. Catinaccio.
1 Bolts in Tension pt1 Andrei Lozzi. The flanges at the end of the two turbine shafts seen above, are bolted together to form a very rigid friction coupling.
Pixel Upgrade Phase I CMS Upgrade Week 27. April 2010 R. Horisberger, PSI.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
DOE/NSF Review of U.S. ATLAS /March 2001 WBS Pixel Overview and WBS Pixel Mechanics M. G. D. Gilchriese Lawrence Berkeley Laboratory.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
ATLAS Pixel Detector Pixel Support Tube and Related November 9, 2001 Pixel Day E. Anderssen, LBNL.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
ATLAS Pixel Detector July 2003 SC Pixel Meeting N. Hartman LBNL 1 Pixel Support Tube WBS Santa Cruz Cost Workshop July 9, 2003.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
ATLAS Pixel Detector July 2003 Insertion Device Costs A. Smith, LBNL 1 Insertion Device Costs Overview US Pixel Meeting July 9, 2003.
ATLAS Pixel Detector Pixel Support Tube Interfaces Pixel Support Tube PRR CERN, Geneve E. Anderssen, LBNL.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
Baby Mind C OIL DESIGN AND ASSEMBLY SCENARIOS Helder Silva Phillipe Benoit Alexey Dudarev Gabriela Rolando Herman ten Kate Etam Messomo Laurent Nicola.
1 PST Heater Panel Design The PST heater panels are internally redundant resistive circuits printed onto a Kapton sheet with an aluminum backing. They.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
DCal-ALICE integration and installation plan and status A. Tauro.
Sébastien MICHALMarch Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally.
ATLAS 1 Beam Pipe Support SCT TRT Side CSide A Services and Beampipe Support Frame Services and Beampipe Support Frame Pixel Detector Composite support.
Completed Front and Rear Standard 10 ½” 1 ½” 3 ¼” 4 ½” 1” ¾” 1 ½” 6” ¾” Channel Length: 5 ¼”, ¾” from end.
Straw man layout for ATLAS ID for SLHC
ATLAS Pixel Detector Pixel Support tube Supports October 17, 2001 E Anderssen, LBNL.
Present status of the flux return yoke design
End-cap Mechanics FDR Overview of the Project
Installation step 4. (3 days)
Beam Pipe and Service Support Structure Production Progress
IBL Wire Handling Concepts for Beampipe Support and Adjustment
BCM Overview Placement such that system is sensitive to all types of beam accidents. => 2 independent subsystems Halo losses inside the Pixel volume ie.
Cryomodule Assembly Plan
as a prototype for Super c-tau factory
Presentation transcript:

ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL

ATLAS 2 Services and Beam Pipe Support Structure Beam Pipe Support SCT Barrel TRT Forward Side CSide A Services and Beam Pipe Support Structure Pixel Detector Schematic of Beampipe, Support Structure, and Pixel Package in ID TRT Forward Beam Pipe Support Wire ID Endplug PP1 PST Support Flexures Insertion Trolley Beam Pipe Pixel Support Tube Package Insertion Riders Z=848 – Wire Support Z=3092 – PP1 Z=3120 – Adjustors PP1 Bellows/Temporary Support Z=~3200 – Bellows/Temp. Support

ATLAS 3 “Package” Beam Pipe Support Structure Pixel Detector Not Shown Beam Pipe Service Panels

ATLAS Rails

ATLAS 5 Service Quarter Panel Service Quarter Panel structure carries Disk and Barrel panels as well as PP1 quarter panel on same structure Disk panels not shown—current designs being modified Tubes not shown as well—both available at June Review

ATLAS 6 PP1 Routing Routing for PP1 dominates the volume at the end of the Package The routing is not complete, but is intended for Review in June Bellows design to couple PP1 to Beam Pipe is ‘Complete’ implies ~73N compressive load on Beam Pipe during Bakeout. Uses Large Convolution depth, but relatively short length Dimensions open to discussion, based on acceptable loads (can increase length/convolution depth ratios to suit acceptable load and internal clearances

ATLAS 7 Patch Panel One PP1 layout determines final length of the Forward section of the PST—Layout of region is progressing and being modelled—in time for June (only just)

ATLAS 8 PP1 Interface to Adjustors Survey access is poorly understood now Hope to reduce some occupancy of PP1 fittings Bellows design exists, can be optimized for possible access Internal volume of BPSS is not a limit as will be seen in later slides Non conventional options for survey will likely be needed Temporary support of Beam Pipe is from ‘Can’ installed on inner radius of PP1 Fixation of service structure to PP1 Quarter Panel Breaks

ATLAS 9 PP0 End of Frame PP0 is not technically an interface to Beam Pipe but is a critical interface to BPSS Disk/B-Layer panels under revision currently—not shown Trolley is designed to allow for cooling tubes which are also installed with Service Quarter Panels Note—PP1 quarter panels are fixed to the Service Quarter Panels and are installed with them This is important at a later stage where PP1 will support the Beam Pipe

ATLAS 10 Pixel package Overview The Pixel package is first integrated on surface into an Integration & Testing Tool (ITT) and then slid into a Dummy Support Tube (DST) the DST in then lowered into the pit in a cradle, connected and aligned to the PST and the pixel system is moved to its final position The Beampipe is the first article installed in the ITT Dual V Rail System Wheels and driving system U Supports Support Frame B- Layer Cart

ATLAS 11 Pixel Assembly Beampipe temporarily held with auxiliary supports “U-Supports” on installation and testing tool - ITT

ATLAS 12 Beampipe support transferred to support frames—see comments Following slides Pixel Assembly

ATLAS 13 Beampipe Support Frame Wires at Z=-848,+848 Fixed Adjustors (no spring) Top and Side Sprung Adjustors Side and bottom (tension limiters) Wire Adjustors Cruciform supports Longerons Service panel Attachment points Reinforcing Longerons, Attach Points to PP1 2 Frames – 1 A Side, 1 C Side Single Frame Shown Here 4 Support Wires, 1 Support Plane

ATLAS 14 Beam Pipe Collars Split Conical Ring Allows Free Placement in Z Wire Anchor Point Kapton Heater Aerogel Insulation

ATLAS 15 Access to wires during Assembly Access to wires prior to Service Panel installation is excellent Service Panels installed after the wires are routed through tubes Wires then inserted through adjustors at end of longerons Longerons

ATLAS 16 Assembly of Adjustor/Limiter Unit Tension Limiter Assembled, Spring Compressed Wire Fed Through, Clamped into Collet Wire Adjustor Seated in Tension Limiter Max “IN” Adjustment Max “OUT” Adjustment

ATLAS 17 Adjustor/Tension Limiter Preload Adjustor Barrel Limiter Spring Wire Adjustor Screw Wire Adjustor Nut Wire Collet & Nut Wire Tension Limiter Plunger Wire Guide

ATLAS 18 Assembly Continued—Services Added Service Panels Are Added to top of package Bottom of package has limited access due to ITT support structure Note that half of PP1 is assembled at this stage, and can be fastened together Temporary support via PP1 is possible at this stage

ATLAS 19 Bottom Services Installed Bottom services can be installed Note—this picture shows direct bottom, Package can rotate only 90 degrees plus a little in the ITT At this stage it is required to have temporary supports of Beam Pipe installed to allow for this rotation

ATLAS 20 Panel Installation Detail This shows some detail of how panels are supported to provide adequate support for the temporary support Note that PP1 is threaded over Adjustors during installation