Presented at Environmental Finance Workshop Series University of Toronto October 12, 2005 DEALING WITH UNCERTAINTY: Wind Resource Assessment D. C. McKay.

Slides:



Advertisements
Similar presentations
Eric White, Director of Engineering
Advertisements

© 2007 AWS Truewind, LLC Wind Resource Assessment and Energy Production: From Pre-Construction to Post Construction July 2007 Eric White, Director of Engineering.
The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
Boulder,March 11 st 2010 Proposal for a site assessment IEC standard IEC/TC88 Boulder meeting Millán Esteban - SC88 Spanish mirror committee.
WP3 - Energy yield estimation of wind farm clusters DANIEL CABEZÓN CFD Wind Engineer CENER (National Renewable Energy Center of Spain) Support by.
WinDS-H2 MODEL Wind Deployment Systems Hydrogen Model Workshop on Electrolysis Production of Hydrogen from Wind and Hydropower Walter Short Nate Blair.
Wind Resource Assessment
SkyPower Corp. PRESENTATION.
Session 2, Unit 3 Atmospheric Thermodynamics
Propagation of Error Ch En 475 Unit Operations. Quantifying variables (i.e. answering a question with a number) 1. Directly measure the variable. - referred.
NovEnergia II Technical Bureau - Sep08 THE OPPORTUNITIES OF HUNGARIAN WIND ENERGY Álvaro Rodrigues September 2008.
Air-Water Heat Exchanger Lab In this lab, YOU will design, conduct, and analyze your experiment. The lab handout will not tell you exactly what to measure.
Uncertainty analysis is a vital part of any experimental program or measurement system design. Common sources of experimental uncertainty were defined.
1 Adviser : Dr. Yuan-Kang Wu Student : Ti-Chun Yeh Date : A review of wind energy technologies.
The Wind Energy Center at UMASS University of Massachusetts Patrick Quinlan Associate Director UMass Wind Energy Center Amherst, Massachusetts Site Considerations:
Engineering Technology Division
MicroSiting (Part I) UNESCO Desire – Net Project Roma, 21/02/2007
Uncertainty in Wind Energy
Small Farm Profitability: Is Wind Energy the Answer? 1
V. Rouillard  Introduction to measurement and statistical analysis ASSESSING EXPERIMENTAL DATA : ERRORS Remember: no measurement is perfect – errors.
Towards Quantification of Condition Monitoring Benefit for Wind Turbine Generators Mr. David McMillan (Presenting) and Dr. Graham W. Ault Evaluate and.
WIND ENERGY Wind are produced by disproportionate solar heating of the earth’s land and sea surfaces. –It forms about 2% of the solar energy –Small % of.
Wind Power Analysis Using Non-Standard Statistical Models
A Case Study in Community Wind New Ulm Public Utilities Commission - Success with Due Diligence Welcome.
Tower SystemsJanuary AMS Short Course on Instrumentation 1 Installation and Use of Meteorological Tower Systems Melanie A. Wetzel Desert Research.
WIND POWER. Introduction  Energy is a major input for overall socio- economic development of any society  The prices of the fossil fuels steeply increasing.
Fossil Gulch Wind Park Presented By Jeff Duff Vice President, Airstreams LLC Welcome.
North Eastham Wind Feasibility Study Results Brian Eastman Eastham Energy Committee Kristen Burke Massachusetts Technology Collaborative Ric O’Connell.
Rural Development’s Rural Energy for America Program (REAP) Grants and Loans Guarantees & Renewable Energy Feasibility Studies June 5, 2009.
Solar Project Performance Assessment
Albany, New York | Barcelona, Spain | Bangalore, India | awstruepower.com | ©2011 AWS Truepower, LLC MARACOOS 2012 Annual Meeting Baltimore,
Offshore wind resource assessment Colin Morgan and Graham Gow Garrad Hassan and Partners
UNCERTAINTY The Classical Approach ALAN DERRICK SENIOR TECHNICAL MANAGER September
Page 1© Crown copyright Distribution of water vapour in the turbulent atmosphere Atmospheric phase correction for ALMA Alison Stirling John Richer & Richard.
Global WINDPOWER Chicago, Illinois Assessment of Potential Improvements in Large-Scale Low Wind Speed Technology Joseph Cohen Princeton Energy Resources.
1 IRENA – M ARTINIQUE C ONFERENCE ON ISLAND ENERGY TRANSITIONS Workshop C : Wind resources and technologies for islands W IND MEASUREMENTS ON I SLANDS.
Evaporation What is evaporation? How is evaporation measured? How is evaporation estimated? Reading: Applied Hydrology Sections 3.5 and 3.6 With assistance.
12/5/2003Global Energy Concepts, LLC1 of 11 Characteristics of Financeable Wind Energy Projects Northwest Power and Conservation Council Workshop on Wind.
Article #3 New York Windmills Setbacks: Minimum distance from residence for construction of turbines. Determined locally – community, county, state. Typical.
Wolf-Gerrit Früh Christina Skittides With support from SgurrEnergy Preliminary assessment of wind climate fluctuations and use of Dynamical Systems Theory.
AWS Truewind Methodology Timeline of AWS Truewind participation Key points Wind resource modeling Estimation of plant output Validation and adjustment.
A METHODOLOGY FOR ESTIMATING WIND FARM PRODUCTION THROUGH CFD CODES. DESCRIPTION AND VALIDATION Daniel Cabezón, Ignacio Martí CENER, National Renewable.
Estimating the Optimal Location of a New Wind Farm based on Geospatial Information System Data Dec Chungwook Sim.
Statistics Presentation Ch En 475 Unit Operations.
On the uncertainty in the AEP estimates for wind farms in cold climate Winterwind, Östersund, Øyvind Byrkjedal Kjeller Vindteknikk
Wind, Wind Power and Vestas Implementation of Wind Power.
Wind Energy: Technology, Markets, and Economics ECO 680 Dr. Gomis Porqueras.
1 National Wind Technology Center Wind Turbine Design According to IEC (Onshore) and -3 (Offshore) Standards Overview for NWTC November 8, 2005.
ME Mechanical and Thermal Systems Lab Fall 2011 Chapter 3: Assessing and Presenting Experimental Data Professor: Sam Kassegne, PhD, PE.
Environmental Business Council December 17, 2009
Meteorological Observatory Lindenberg Results of the Measurement Strategy of the GCOS Reference Upper Air Network (GRUAN) Holger Vömel, GRUAN.
Experience of Modelling Forested Complex Terrain Peter Stuart, Ian Hunter & Nicola Atkinson 30 th October 2009.
An Overview of the Technology and Economics of Offshore Wind Farms
Engineering, Policy, Finance
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
MECH 373 Instrumentation and Measurements
IEC FDIS 2016 Consensus Analysis Project
Talents of tomorrow: Wind meteorology
Structural Reliability Aspects in Design of Wind Turbines
Optimization of Windfarm Layout
Data management: 10 minute data, 8760 hours Data Q/C, error checking
Air-Water Heat Exchanger Lab
This teaching material has been made freely available by the KEMRI-Wellcome Trust (Kilifi, Kenya). You can freely download,
Engineering, Policy, Finance
Stefano Grassi WindEurope Summit
Lidar Measurement Accuracy under Complex Wind Flow in Use for Wind Farm Projects Matthieu Boquet, Mehdi Machta, Jean-Marc Thevenoud
Photovoltaic Systems Engineering Utility Scale Development:
Micrositing for Wind Turbines
Presentation transcript:

Presented at Environmental Finance Workshop Series University of Toronto October 12, 2005 DEALING WITH UNCERTAINTY: Wind Resource Assessment D. C. McKay ORTECH Power Presented at Environmental Finance Workshop Series University of Toronto October 12, 2005

10 Steps in Building a Wind Farm Understand Your Wind Resource Determine Proximity to Existing Transmission Lines Secure Access to Land Establish Access to Capital Identify Reliable Power Purchaser or Market Address Siting and Project Feasibility Considerations Understand Wind Energy’s Economics Obtain Zoning and Permitting Expertise Establish Dialogue with Turbine Manufacturers and Project Developers Secure Agreements to Meet O&M Needs

Considering a Wind Farm? Need to Consider Revenue Capital Costs Operational Costs All carry uncertainty

Why Estimate Uncertainty? Uncertainty is inevitable Understanding its origin is important to: –Know it –Control it –Be prepared for it

Who wants to know? You –To set contingencies –To conduct realistic sensitivity analyses with financial model –To assess project feasibility –To qualify for competitive financing Your lender/ financier

Uncertainty on Revenue side: Wind Resource Assessment Wind shear Long term Variation Monitoring Wake Estimate Noise Power Curve

Sources of Uncertainty: Wind Shear

Profiling & Extrapolation –Log law or power law U(z1)/U(z2)=(z1/z2)^p –p ~ height, roughness, terrain, direction & stability –wake & turbulence

Sources of Uncertainty: Wind Shear Can only be eliminated if wind is monitored at hub height Often no hub height measurement available when feasibility of project is assessed

Sources of Uncertainty: Wind Shear Uncertainty value for Wind Shear +/ % Sources: Wind Resource Analysis Program 2002, Minnesota Department of Commerce, ort_ _WRAP2002.pdf Project specific estimates

Sources of Uncertainty: Long Term Variation

E.g. –25 years long term data available (d.o.f. = 24), standard deviation of sample (s = 15%) => good measure of year to year variation –99% confidence interval = 7% t…student-t, t(d.o.f., confidence level) => good measure of long term average

Sources of Uncertainty: Long Term Variation Climate Change –Mean levels of wind energy –Fluctuations of wind energy

Sources of Uncertainty: Wind Resource Monitoring Systematic error Calibration of instrument –Quality of instrument –Installation (effects of tower, mounting arrangements) –Surrounding terrain, obstructions, etc. –Instrument icing/ malfunctioning –Type B ≈ +/- 5% Random error –Data recovery rate, electronic noise –Reduced by increasing number of samples –Type A ≈ +/- 1%

Sources of Uncertainty: Wind Modelling Wind Models –Flow Model Vs Wind Climate Model –Diagnostic Vs Prognostic –Meso-scale Vs Micro-scale (Coupling) –Physics (hydrostatic / non-hydrostatic, compressible / non-compressible, friction, turbulence closure)

Sources of Uncertainty: Wind Modeling Input to Models –Land Use, Seasonal Variations –Terrain (resolution & accuracy) –External Forcing (pressure gradients, solar radiation, stratification, temperature difference between land and water)

Sources of Uncertainty: Wind Modelling Wake Modelling (project specific estimate of  2%) Model Validation Difference between WAsP and MS-Micro Models <2% on project example Difference between WAsP and more advanced models 25%+ Noise Modelling

Sources of Uncertainty: Turbine Power Curve

Other Factors in Production Estimating Power curve guarantee Availability and maintenance time Electrical losses Time dependent performance deterioration (blade soiling) Blade icing and extreme weather

Combination of Uncertainties Project example Contribution+/- Total Wind Shear20.0% Long Term Variation7.0% Monitoring5.1% Modeling5.0% Wake Estimate2.0% Power Curve7.0% 23.5%

Summary Rational quantification of revenue estimate uncertainty is essential Wind shear is often biggest contributor to uncertainty Redundant modeling helps to keep model uncertainty down Monitoring at as many locations as possible and as close as possible to hub height will reduce uncertainty Other loss factors need be considered