David Bailey Gluing. Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical.

Slides:



Advertisements
Similar presentations
CricketSat Assembly.
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
P. Béné, F. Cadoux, A. Clark, D. Ferrère, C. Husi, M. Weber University of Geneva IBL General Week - 11, 12 February 2010 IBL Stave Loading Status Summary.
ATLAS Module building at Glasgow
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
Hybrid assembly at Glasgow. Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes.
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
Stiff tail troubles The new stiffer hybrid tail flexes the interconnect card on the rod by about 1 to 1.5 mm Some tilt in the connector as well Force needed.
PERSISTENT SURVEILLANCE FOR PIPELINE PROTECTION AND THREAT INTERDICTION Micromachining of Inertial Confinement Fusion Fast Ignition Targets Michael Mauldin.
Placing glue dots 18 x 18 (324) dots on 5mm grid takes ~5min.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
IB stave assembly A. Di Mauro, C. Gargiulo, J. Van Beelen ITS-MFT mini-week
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
Status and outlook of the Medipix3 TSV project
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
ECAL silicon- tungsten status
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
Hybrid Integrated Circuit
M. Gilchriese Upgrade Stave Assembly and Robotics August 3, 2007 LBNL.
Receive processed un-thinned wafers from E2V. Processed for bump bonding (dice, bump and attach read out chip)
LPNHE activities Contribution in the development of an assembly line for highly granular calorimeters with semiconductor readout Gluing robot system Metrology.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
Ray Thompson Manchester Xmas Meeting 20/21 Dec 06 Ray Thompson, Julian Freeston, Andy Elvin WP4 aims: look at Mechanical/Thermal/ Assembly issues Utilise.
Ray Thompson Calice meeting UCL 6 Mar 06 WP4 aims: look at Mechanical/Thermal/ Assembly issues effort weighted to latter end of period Glue Assembly WP4.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
Ray Thompson Calice meeting Mar 07 Ray Thompson WP4 aims: look at Mechanical/Thermal/ Assembly issues Utilise Atlas SCT experience effort weighted to latter.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
Low Mass Rui de Oliveira (CERN) July
S Pyatt UV glue dispensing studies on the Dima Dotmaster 1.
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
Takashi Matsushita Imperial College T. Matsushita 1 Quality Control of Station Assembly.
Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004.
Gluing, measuring and shearing Heated plate curing Is the process feasible? Tests with 130nm hybrids Measure resulting glue thickness Determine the shear.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
The Development of the Fabrication Process of Low Mass circuits Rui de Oliveira TS-DEM.
WP3_Bham; 29May 2014; John Wilson1 Heated plate curing Tests with 130nm hybrids and glass ASICs the glue thickness is controllable. i)Room temp curing.
CALICE SiW EcalAboud Falou/ LAL-Orsay Detector SLAB Integration EUDET Prototype Slab cross section, thickness budget Space Frame Ladder {Step.
TRIO-CINEMA 1 UCB, 2/08/2010 CINEMA Solar Array Design Review Yashraj Khaitan David Glaser Kevin Jenkins Chris Pasma Space Sciences Laboratory University.
ATHENA - Module Construction P. Riedler, J. Rochet.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
S Pyatt 1 UV glue dispensing studies on the Dima Dotmaster Glue gap checks.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
WP3_Bham; 15May 2014; John Wilson1 Heated plate curing Tests with 130nm hybrids and glass ASICs i) Room temp curing the glue thickness is controllable.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
RPC Production status for Engineering Module & Detector stack at IICHEP, Madurai Shri. S.D.Kalmani TIFR.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
ATLAS pixel module assembly flow
T. Bowcock University of Liverpool
Glue curing studies (contd)
Ladder Assembly All tools and jigs produced Glue dispensing works
Grid Pix Field Simulations and precision needed for a module
Nikhef/Bonn LepCol meeting
Ladder Assembly All tools and jigs produced Glue dispensing works
Gluing jigs for Demonstrator
UV glue dispensing studies
HIC Assembly - Liverpool
Module/Ladder Assembly
What determines impedance ?
THERMOMETER PROJECT PCB ASSEMBLY INSTRUCTIONS Ver: 3.21 edutek.ltd.uk.
Pixel module assembly tooling
WP4 Dave Bailey 5th May 2006.
Presentation transcript:

David Bailey Gluing

Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical resistances < Ohm ( Gold /dot/Gold) Need good control on gap thickness Now modifying commercial BGA workstation as demonstration pick and place tool to position wafers on glued pcb. Wafers not handled manually Manual operation of workstation but shows automated concept

Placing glue dots 18 x 18 (324) dots on 5mm grid (1 wafer ) 0.2 sec/ dot takes ~ 5min Highly reproducible Glue Dot dispensing Sony dispensing robot

Ø1.6 mm +/- 50 micron gap = +/- 0.5 mm diameter Ø2.0 mm Ø2.5 mm Ø3.6 mm Dot size dependence on gap spacing 200  0 Glass plate wedge spacing

12 x 6 sec on CALICE test board Each pad probe able from rear Two boards sandwiched together, 66µm gap Interpad links cut on top board 4 Terminal resistances between overlapping pads measured – <0.005 Ω per pad Dot resistance tests Needs repeating with silicon wafer

Wafer Pick and place demonstrator Modifying existing commercial BGA placement station to pick and place wafers on to glued pcb held on vacuum jig. Alignment via split prism viewing system. Align images of wafer pixels and PCB pixels. Manual operation could be automated with pattern recognition rebuild pick up vac chuck for 90 mm wafer base vac chuck to hold PCB Investigate spacing control ideas - vacuum transfer chuck Assistance from Scott Kolya

Schematic of wafer assembly steps 1.4 wafers (red) picked and aligned on BGA station relative to pcb pattern ( orange). Held in position by vacuum. 2. Transfer chuck lowered on top.Vacuum top on, bottom off. Wafers now held on transfer chuck 3. Remove transfer chuck from BGA workstation maintaining vacuum 4.Pcb (blue) held flat in bottom vac jig. Glue robot dispenses dots 5. Transfer chuck with wafers placed on bottom jig. Alignment dowels/touch bearings Fine tune height. Maintain vac during cure 6. Remove assembled board

Vacuum Transfer Jig controls Portable vacuum Jig Control Trolley with resevoir for moving transfer jigs from glue robot to alignment workstation Panel controls vacuum on/off to the various jigs.

Vacuum Jigs

Integration with glue robot

Summary System has been “checked out” Testing with boards from Cambridge Have glass plates in hand Have a couple of real wafers Will attach to boards and check resistances Pretty much ready to go Waiting for the real ASU boards Probably need to check how flat they are on the back with the ASIC in place